Denton Co Levee-CS 8510281'au111opkins, Chairman
Ralph Roming, CommlSSl
John 0. I Iouchins, Corm
TEXAS WAITER COMMISSION
Larry R. Soward, Executive Director
Mary Ann Hefner, Chief Clerk
rmer - / James K. Rourke, Jr., General Counsel
Oc
Mr. James i Koehn
Attorney t Law
1220 Co ,Ybrado, Suite 200
Austi TX 78701
Re: D NTON COUNTY
R . -0239
ber 28, 1985
EVEE IMPROVEMENT DISTRICT NO. 1,
Dear. Mr. Ko hn:
Enclosed are certified copies of Commission Order dated
October 28, 1985, approving an Engineering Report as the Plan
of Reclamation and Approving Preliminary Plans for a
Reclamation Project of DEN ON COUNTY LEVEE IMPROVEMENT DISTRICT
NO. 1 (FE-0239), the details being more. fully set out therein.
Please advise if we m y be of further assistance.
Very truly yours,
TEXAS WATER COMMISSION
c
Mary Ann4refner
Chief Clerk
MATT: pm
Enclosure
cc /with enc!
See atl
1'
_osure:
:ached listing
n Box 13087 Capitol Station
Tyr
MKS ,
Austin,'r,xas 78711 • 7z --2,4//-3791
Page 2
Mr. James I1. oehn
October 28, 1 85
cc /with enclo ures:
Denton C unty LID No. l
c/o Jay . Terry
2001 Bryan Tower, Suite 750
Dallas, TX 75201
Mr. Lawrence W. Jackson
Attorney at Law
1800 Lincoln Plaza
500 North Akard
Dallas, TX 75201
(for Ci y of Coppell)
Mr. Rob,
Attorne,
1300 Ca
919 Con
Austin,
(for Un
rt Wilson
at Law
itol Center
ress Avenue
TX 78701
'vest Development)
Ms. Els a Edwards
Route 1 Box 180
Carroll on, TX 75006
Ms. Net ie Long
Route 1 Box 190
Carroll on, TX 75006
Mr. Orl n Parish
Route 1 Box 185A
Carroll on, TX 75006
Ir. Leo and Wiley
V Route 1 Box 183
Carroll on, TX 75006
Mr Jac Cox, PIA, TWC
Mr. . Lar y Persky, TWC
AN
lo-
OMMISSION g rM
A 19� D
TEXAS WA ED C
PR 8�3
CITY MANAGER
approving an E gineering Report as the Plan
of Reclamation and Approving Preliminary Plans
for a Reclamation Project of Denton County
Levee Improvem nt District No. 1 (RE -0239)
On the 23rd day of Octo er, 1985, the Texas Water Commis-
sion considered the application of Denton County Levee Im-
provement District No. 1 for approval of an engineering report
as its Pan of Reclamation and for approval of preliminary
plans for a reclamation project on and adjacent to Denton
Creek in Denton and Dallas Counties, Texas.
A public hearing was held on August 28, 1985, before a
Commission Hearings Examiner. Parties designated at the
hearing were: Denton County Levee Improvement District No. 1
(District l, as applicant; the Executive Director and Public
Interest Advocate of the Texas Department of Water Resources;
the City of Coppell; Un vest Development Company; and
Ms. Elsie Edwards, Ms. Nettie Long, Mr. Orlan Parish, and
Mr. Leonard Wiley, as protes ants.
After considering the Examiner's Proposal for Decision
and pleadings and evidence submitted relative to this matter,
the Commission makes the following Findings of Fact and
Conclusions of Law:
FI
1. The applicant ha
Commission through its pred
ment of Water Resources,
report p epared by Dannenb+
approved as the District's
nary plans for a project to
imately__560 acres within
Denton Creek in Denton and 1
2. Notice of the app
in the Oalla
weeks, cn July 30 and A
3S OF FACT
submitted to the Texas Water
;essor agency, the Texas Depart -
3th an April, 1985 engineering
m Engineering Corporation to be
lan of Reclamation, and prelimi-
rovide for reclamation of approx-
ie District on and adjacent to
llas Counties, Texas.
.cation and hearing was published
once a week for two consecutive
lust 7, 1985, with the second
Publication being at least 20
Dallas Morning News is a new
Denton and Dallas Counties,
constructi n is located and
potential �mpact.
I-
days prior to the hearing. The
paper of general circulation in
Cexas, the counties wherein the
.n which the project would have
3. Notice was sent by first -class mail on July 29,
1985, to known property owners within the area to be affected
by the pr ject, and to concerned federal, state and local
officials. Notice was sent by first -class mail on July 30,
1985 to remaining known interested parties.
4. The proposed project is located within the bound-
aries of the 938.337 -acre District, which is located within
the corporate limits of ane approximately four miles from
downtown Lewisville, Texas. The District is bounded on the
south by Denton Creek, on the west by Denton Tap Road, and on
the northeast by Interstate Highway 35E. The north and east
boundaries follow existing pr perty lines.
5. The proposed project includes construction of a
flood control channel along Denton Creek from near Denton Tap
Road to the eastern end of the project; a levee about 9,000
feet long consisting of about 170,000 cubic yards of dirt and
varying in height from five to eleven feet; placement of earth
fill from the channel and interior drainage lake to a level at
least two feet above the 1Q0-year flood level; an interior
drainage ake to capture water behind the levee; a 300,000 gpm
capacity pump station to move water from the interior lake
into Dent n Creek; and modification of a bridge on Denton Tap
Road to a large the opening.
6. Plans for the proposed project are adequate and in
conformity with sound engine ring principles.
7. There is no disce nible incompatibility with exist-
ing hydraulic and hydrologic conditions.
8. The proposed project will cause no additional
flooding or adversely affect. life and property or the rights
of third parties.
2
i
9. The proposed proje ct will reclaim land within an
area presently designated as "floodway" by the Federal Emer-
gency Management Agency (F ). The proposed channel improve-
ments wil compensate for en roachment into the floodway, and
readjustm nt of the floodwa limits according to FEMA regu-
lations will be justified.
10. The proposed project will allow reclamation of
approximately 560 acres within the District, will benefit
landowners south of Denton Creek and outside of the District
in the upstream portion of the project area, and will not be
detrimental to any landowners outside of the District.
11. The proposed project will allow sufficient ordinary
flows to remain in the old channel of Denton Creek to sustain
local fish and other population in the stream. Streamside
vegetation will not be harmed and only a small amount of such
vegetatioi within the District will be removed during con-
struction The proposed project will not promote the growth
of mosquito population in the area.
12. Ordinary flows within Denton Creek are primarily
affected by controlled releases from Lake Grapevine and
contributions from the watershed between Lake Grapevine and
the proje t area. The proposed project will not affect either
of these aonditions.
13. The depth of water within Denton Creek in low -flow
conditions is primarily a factor of backwater effects from
Carrollton Dam, which is located downstream of the project
area. The proposed project is designed so as not to affect
the depth of water in the ex sting channel.
14. A series of small diversion dams would assure that
ordinary flows continue in the existing channel. Applicant
proposes, but has not included in its engineering report or
preliminary plans, the installation of such weirs if necessary
to protect low flows. Sound engineering principles allow for
observation of actual condi ions and construction, if neces-
sary, in response to such �onditions. Applicant proposes. to
3
monitor flow conditions fo� approximately one year after
completion of the project to determine if installation of
weirs is necessary.
15. he proposed project will not significantly increase
the 100 -velar water surface levels within or upstream from the
project area.
16. The Executive Dire for recommends approval of the
engineering report as the District's Plan of Reclamation.
17. Construction of the project will commence within six
months from the date of issua ce of this Order.
18. Completion of the project will occur within two
years from the date of issuance of this Order.
CONCLUSIONS OF LAW
1. Applicant seeks approval of its engineering report
as its Plan of Reclamation nder 557.156 of the Texas Water
Code and ill T.A.C.5315.36.
2. Applicant seeks ap roval of preliminary plans under
516.236 of the Texas Watex Code and 31 T.A.C. SS315.37,
315.38, alkd 315.51- 315.63.
3. The Commission ha� jurisdiction under Texas Water
Code SS57.156 and 16.236 to consider the application and the
Proposal for Decision and o approve both the engineering
report as a Plan of Reclamation and the project plans of the
applicant
4. The applicant's engineering report and preliminary
plans a
Rules o
agency, t
approved.
in compliance with the Texas Water Code and the
the Texas Water C mmission and of its predecessor
ie Texas Department of Water Resources, and should be
NOW, THEREFORE, BE IT 0 2DERED BY THE TEXAS WATER COMMIS-
SION THAT:
1. The engineering report submitted by Denton County
Levee Improvement District. No. 1, prepared by Dannenbaum
Engineering Corporation and dated April, 1985, be approved
4
subject to all requirements �f law and the Rules of the Texas
Water CoMnission.
2. The preliminary pans submitted by Denton County
Levee improvement District No. 1 for a reclamation project be
approved subject to all requirements of law and the Rules of
the Texas Water Commission''' (including submission of final
plans and specifications to the Executive Director of the
Texas Water Commission).
3. Applicant commencellconstruction within six months of
the date of issuance of thisl,lOrder.
4. Applicant complet4 construction within two years of
the date of issuance of this Order.
5. In conjunction wit Finding of Fact No. 14, one year
after completion of construction, the District shall submit a
written report to the Texa Water Commission evaluating the
performance (including flow) of structures during low flows.
I
This rep rt will analyze th effect, if any, of the diversion
of water between the two c�hannels and will propose remedial
action, if any, necessary t correct observed problems. This
report shall be furnished to the parties to this hearing.
6. The exceptions of Univest Corporation filed
October 7, 1985, are hereby,loverruled.
The Chief Clerk of the11 Commission is directed to forward
a certified copy of this Omer to all parties.
Signed this 28th day�lof October , 1985.
TEXAS WATER COMMISSION
/s/ Paul Hopkins
Paul Hopkins, Chairman
/s/ Ralph Roming
Ralph Rom ng, Comm ss oner
ATTEST:
/s/
/s/ John O. Houchins
John O. Houc ins, Commissioner
Ann Hefner jl
lefner, Chief Cle+�k-
5
THE STATE OF TEXAS X
COUNTY OF TRAVIS j
I, MARY ANN HEFNER. Chic Clerk of the Texas Water
Commission, do hereby certify''Ithat the attached and
foregoing is a true and correl t copy of an Order of the
Commission. the original of which is filed in the
permanent records of the Comm ssion.
GIVE UNDER MY HAND AND 131E SEAL OF THE TEXAS WATER
CONMISSIO . this the 28th day of October , 1985.
SEAL
-MARY A Co" i e e r k
Texas Water mmission