Loading...
Denton Co Levee-CS 880630SUITE 150 6750 WEST LOOP SOUTH BELLAIRE, TEXAS 77401 (713) 661 -3488 TELECOPY (713) 661 -9776 SUITE 1280 816 CONGRESS AUSTIN, TEXAS 78701 (512) 477 -7161 TELECOPY (512) 476 -1676 VIA MESSENGER Mr. Alan D. Ra City Manager City of Coppel 255 Parkway Bo Coppell, Texas RE: Dent "Dis Dear Mr. Ratli In conne Development Cc find enclosed Dannenbaum Enc Mr. Wayne Gin Coppell. I hope t you to respon( further assist JDT:1s Encl: a/s [ARSA HURT TERRY & BLINN A PROFESSIONAL CORPORATION ATTORNEYS AT LAW SUITE 700 2001 IBRYAN TOWER DALLA, TEXAS 75801 (21 ) 954 -6300 TELEC04Y (214) 954 -6386 June 30, 1988 III Miff IF L U ilevard �, N 75019 _ JUN A �FUU SUITE 1100 301 COMMERCE STREET FORT WOETH, TEXAS 76102 (817) 332 -6500 TELECOPY (817) 870 -1437 SUITE 1175 1819 H STREET, N.W. WASHINGTON, D.C. 20006 223 -2500 ''T�UF OPY (202) 296 -7967 s` :)n County LeveeA mprovement District No. 1 (the trict ") Ef : ction with t e inquiry to you from Univest mpany regardin the Denton Creek channel, please a June 28, 988 letter on this matter from ineering Corporation, the District's engineer, to z of Ginn, Inch., the engineers for the City of (e information rovided by Dannenbaum will enable to Univest. lease let me know if we can be of ance. Very truly yours, I J Terry Attorney for the istrict SENT BY:DANNENHAUM ENGINEER �0% 6 -29-88 8:09AH . 571184 CCITT Q3:# 2 Mr. Mayne Ginn Ginn, Inc. 17103 Preston Road Suite 100 LB 118 Dallas, Texas 75248 RE: Denton County L Dear Wayne: In response to a summarizes the sta Denton County Levee On October 28, construction of a Levee Improvement D the District agree analysis of the of Denton Creek chann remedial action, 1 would be submitted t The District's rec required by the TWC of the diversion of will be included 1989. Copies of t Univest Development If I can be of cc: Mr. Tom Tanner Mr. Jeff Hunt Mr. Jay Terry 1733 -01 52PD:nw DANK IAW � comwAy" "OLVA" 1 m mm "mama p1" gFO 4 June �8, 1988 Improvemnet District No. 1 request from Kevin Peiffer in your office, the following us of current studies of Denton Creek being performed by mprovement District No.l. 985 the Texas Water Commission ( "TWC ") approved the reclamation project on Denton Creek by the Denton County strict No.l ( Dis rict "). -As a condition of the approval, to prepare a written report which would include an ect, if any, of t e diversion of water between the natural 1 and the propose flood control channel and would propose any, necessary o correct observed problems. The report the TWC one ypar,after completion of the project. amation project 'was completed on April 8, 1988. As the District is conducting a study of the effect, if any, water between the ',two channels. The results.of this study n a report whichlwill be submitted to the TWC by April S. e report will also be furnished to the City of Coppell and assistance in this matter, please call. Sincerely, DANNENB&ft ENGINEERING CORPORATION Ph11.Deaton, P.E. ,Project Manager