VIA MESSENGER
Mr. Alan D. Ra
City Manager
City of Coppel
255 Parkway Bo
Coppell, Texas
RE: Dent
"Dis
Dear Mr. Ratli
In conne
Development Cc
find enclosed
Dannenbaum Enc
Mr. Wayne Gin
Coppell.
I hope t
you to respon(
further assist
JDT:1s
Encl: a/s
[ARSA HURT TERRY & BLINN
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
SUITE 700
2001 IBRYAN TOWER
DALLA, TEXAS 75801
(21 ) 954 -6300
TELEC04Y (214) 954 -6386
June 30, 1988
III
Miff
IF
L U
ilevard �, N
75019 _
JUN
A �FUU
SUITE 1100
301 COMMERCE STREET
FORT WOETH, TEXAS 76102
(817) 332 -6500
TELECOPY (817) 870 -1437
SUITE 1175
1819 H STREET, N.W.
WASHINGTON, D.C. 20006
223 -2500
''T�UF OPY (202) 296 -7967
s`
:)n County LeveeA mprovement District No. 1 (the
trict ")
Ef :
ction with t e inquiry to you from Univest
mpany regardin the Denton Creek channel, please
a June 28, 988 letter on this matter from
ineering Corporation, the District's engineer, to
z of Ginn, Inch., the engineers for the City of
(e information rovided by Dannenbaum will enable
to Univest. lease let me know if we can be of
ance.
Very truly yours,
I
J Terry
Attorney for the istrict
SENT BY:DANNENHAUM ENGINEER �0% 6 -29-88 8:09AH . 571184 CCITT Q3:# 2
Mr. Mayne Ginn
Ginn, Inc.
17103 Preston Road
Suite 100
LB 118
Dallas, Texas 75248
RE: Denton County L
Dear Wayne:
In response to a
summarizes the sta
Denton County Levee
On October 28,
construction of a
Levee Improvement D
the District agree
analysis of the of
Denton Creek chann
remedial action, 1
would be submitted t
The District's rec
required by the TWC
of the diversion of
will be included
1989. Copies of t
Univest Development
If I can be of
cc: Mr. Tom Tanner
Mr. Jeff Hunt
Mr. Jay Terry
1733 -01
52PD:nw
DANK IAW � comwAy"
"OLVA" 1 m mm "mama p1" gFO 4
June �8, 1988
Improvemnet District No. 1
request from Kevin Peiffer in your office, the following
us of current studies of Denton Creek being performed by
mprovement District No.l.
985 the Texas Water Commission ( "TWC ") approved the
reclamation project on Denton Creek by the Denton County
strict No.l ( Dis rict "). -As a condition of the approval,
to prepare a written report which would include an
ect, if any, of t e diversion of water between the natural
1 and the propose flood control channel and would propose
any, necessary o correct observed problems. The report
the TWC one ypar,after completion of the project.
amation project 'was completed on April 8, 1988. As
the District is conducting a study of the effect, if any,
water between the ',two channels. The results.of this study
n a report whichlwill be submitted to the TWC by April S.
e report will also be furnished to the City of Coppell and
assistance in this matter, please call.
Sincerely,
DANNENB&ft ENGINEERING CORPORATION
Ph11.Deaton, P.E.
,Project Manager