NW Dallas-AG060202ACENDA REQUEST ITEM CAPTION: T H E - C T V • O F RM COP ELL r �o DF Engineering DATE: February 28, 2006 ITEM #: 10/13 Consider approval of a Resolution to amend the Interlocal Agreement with Northwest Dallas County Flood Control District for sediment removal from box cul -verts beneath Riverchase Drive, as approved by City Council on October 11, 2005, by revising the original cost of 45,529.30 to an amount of $87,929.82 as provided for in the Drainage Utility District Fund; and authorizing the M iyor to sign. APPR( CITY C 1111 ON ABC GOAL(S): EL EXECUTIVE SUMMARY: Approval of a resolution to amend the original Interk sediment removal project beneath Riverchase Drive. VED BY :)UNCIL VE DATE Motion to Approve Res.# 2006 - 0228.1 M - Peters S - Tunnell Vote - 7 -0 • Libby Ball 2006 03 0 3 15 0158 06'00' I Agreement will allow the contractor to continue with the Staff recommends approval of the resolution and will pe available to answer any questions at the Council meeting. 3 FINA�' AL &I 'TS: Funds are available in Agenda Request Fon- - Revised 09/04 av, ej- Drainage Utility Fund for this contract change. Document Name: #DCFCD Interlocal TO: FROM: DATE: MEM Mayor and City Council Kenneth M. Griffin, P.E., Director February 28, 2006 REF: Consider approval of an amendr Dallas County Flood Control Disti Riverchase Drive, as approved by cost associated with the original a as provided for in the Drainage t sign. On October 11, 2005 City Council appr( Northwest Dallas County Flood Control D culverts beneath Riverchase Drive in an an phase of the sediment removal project perfc first phase for sediment removal from box City Council on March 8, 2005. The contractor bid the second phase of silt r Dr., anticipating that he would encounter sim the contractor attempted to remove the sil encountered hard packed clay with just a thin first phase. Because of the hard packed clay, Therefore, the divers are being required to which takes additional time and labor. The c from box culverts #9 and #10, which are loc course clubhouse, when he encountered the already mobilized and working, the NWD( contractor could complete the work on culv NWDCFCD contacted my office to inform contractor had requested additional compensat the remaining two culverts #2 and # 14. Prior to the contractor submitting a request for and #14 and at that time noticed not only tl culverts, with hard packed clay, but also th approximately 65% more than anticipated. T higher because of the hand method, but also the DUM Engineering and Public Works ,nt to the Interlocal Agreement with Northwest ;t for sediment removal from box culverts beneath 'ity Council on October 11, 2005, by revising the eement of $45,529.30 to an amount of $87,929.82 ility District Fund; and authorizing the Mayor to I an interlocal agreement between the City and .ct (NWDCFCD) for sediment removal from box it of $45,529.30. That agreement was the second ed by the NWDCFCD on behalf of the City. The verts beneath MacArthur Blvd. was approved by moval from the box culverts beneath Riverchase ar conditions as the first phase. However, when from the culverts beneath Riverchase Dr., he layer of silt, whether than full depth silt like the he contractor was not able to use his machinery. complish the work using traditional hand tools, ntractor was already working on the silt removal ,ed near the curve in Riverchase Dr. by the golf afferent conditions. Because the contractor was FCD authorized the change in pricing so the rts #9 and #10. Once that was complete, the ne about the changed conditions and that the )n prior to proceeding with the silt removal from additional compensation, he evaluated culverts #2 at the conditions were similar to the prior two it the quantity of the silt to be removed was ierefore, not only is the cost to remove the silt total quantity of silt to be removed is greater. The NWDCFCD has requested that the City interlocal agreement to adjust the cost to r, attached information shows that the origin adjusted price is $61.02 /per cubic yard. anticipated silt removal from culverts #2 and from #2 and #14 is 871 cubic yards. When the adjusted price and quantity is ca adjust the cost from the original amount of 2005 to a revised amount of $87,929.82 completely silted in, have very little convey flood portions of River Ridge, Riverchase E The monies for this additional cost would removal of silt from culverts and the free 5 management practices of our Stormwater M, f Coppell consider an amendment to the original love the silt from the city's box culverts. The unit price was $41.77 /per cubic yard and the also, the attached information shows that the 14 was 520 cubic yards and the adjusted amount .ated, the NWDCFCD is requesting that the city 5,529.30 as approved by Council on October 11, The existing culverts because they are nearly e capacity. Therefore, a large storm event could es and the apartments at Jefferson at Riverchase. ie from the Drainage Utility District fund. The of water is one of the activities noted in the best ; ement Plan. Staff recommends approval of the amendmerit to the October 11, 2005 interlocal agreement between the City of Coppell and the Northwes Dallas County Flood Control District to a revised amount of $87,929.82 and will be available to mswer any questions at the Council meeting. N[D NATHAN D. MAIER CONSULTING ENGINEERS, INC. February 10, 2006 Mr. Ken Griffin, P.E. City of Coppell 255 Parkway Blvd. Coppell, TX 75019 Re: Interlocal Agreement County Flood Control Dear Ken: the City of Coppell and the Northwest Dallas — Adopted October 11, 2005 As you know, pursuant to the above referenc interlocal agreement, the City of Coppell and the Northwest Dallas County Flood Control District have been participating in a joint silt removal project within the District. The City was to ft.nd the silt removal from two City maintained box culverts under Riverchase Drive. The District was to fund the removal from sumps maintained by the District on both ends of both culverts. The Contractor bid the job intending to imple suction equipment to remove the silt from the It, like the north culvert is completely submer began, it was discovered that the material was was filled with sand that appears to have wasl course keeps in the parking lot of the clubhou packed clay material under a thin layer of silt their equipment would not work. The divers 1 tools which took additional time and labor. When the Contractor finished the southern of Request attached hereto. The District's Boar( the interest of preventing claims due to delays respectfully requests that the City consider rei Order No. 2 attached. Given their experience with the southern cul` the north boxes. Therefore, the Contractor is the northern culvert from $41.77 to $61.02 pE quantity for this box from 520 cubic yards to of material throughout the box is the same as the case. Our firm will be monitoring the w( vent the standard practice of using divers with culverts. They began with the southerly culvert. ;ed under the water in the sumps. Once they different than anticipated. One barrel of the box ed into the culvert from a sand stockpile the golf e. In the remaining barrels, they encountered hard •ather than full depth silt as expected. As a result, ad to complete the clean -out using traditional hand he two culverts, he submitted the Change Order , believing the Change Order to be justified, and in of the project, has approved it. The Board hereby nbursing the District for the amount of Change A, it is reasonable to expect the same condition in ;questing an increase in the unit price for cleaning cubic yard. He also has increased the expected 71. This is based on his assumption that the depth the openings, although that may or may not be c as it progresses to verify the conditions. Two Park Lane Place / 8080 Park Lane / Su *e 600 / Dallas, Texas 75231 / (214) 739 -4741 Mr. Ken Griffin, P.E. February 10, 2006 Page 2 The Board is requesting that the City advise t e Board of the City's position with respect to the second culvert. The Contractor has been dire ted to discontinue his efforts related to the remaining culvert until the Board receives dir ction in this matter. The Board appreciates the City's considerati* of these matters. Thank you. Sincerely, NATHAN D. MAIER j SUL T GINEERS, INC. Mike Daniel, P.E., R.P.L.S. MD /mg Attachment 1 — Change Order Request Attachment 2 — Change Order No. 2 01 -04 -2006 16:06 TONTO STI 9722379789 SLUDGE] 650 January 4, 2006 Northwest Dallas County Flood Control pis C/O Nathan D. Maier Consulting Engineers 8080 Park Lane / Suite 600 Dallas, Texas 75231 PH (214) 7394741 / Fax (214) 739 -5961 Re: Change U►derjor Box Calvert Cleaning Dear Members of the Northwest Dallas On Friday December 9, 2005, American Under and 10. The first thing we encountered was tha access. Over time the slope has fallen over the to dig a hole for the divers to access the boxes, the opening, but this did not prove to be true, i the boxes. On barrel No. 4 the north most bam 40 feet in to about 120 feet in to the box, this u project was estimated based on removing sift b changed material has prolonged the cleaning pi additional compensation to compensate for the production of 110 to 125 if per day, this based Based the first set of box cleaning we have ave requires to remove the clay and sand. This has time to complete the north set of boxes is 20 da attached a sketch of the north box openings tha the planed quantity, and based on what we Pro) Sludge Technology is requesting a change order the extra time and equipment are requesting a n on the north boxes to 871 cy. lkm AM O rt »it Descri B 570 CY Remove Sil Adjusted 570 CY Culvert 9 d PAGE:2 CHNOLOGY, INC. '. Wildlife Blvd. Prairie, Tx 7505 Flood Control District, eater started the desifting of the boxes between sumps 9 end of the boxes were almost completely closed off to nuance to the box culverts from the slope above_ We had V this point we just thought the heavy material was just at e experience heavy clay throughout the entire length of , we encountered sand completely filling the box at abort is due to the storm drain that come in from the street. This im the boxes, not heavy clay and sand. The result of the icess and required extra equipment. We are asking for .hanged conditions. Our original estimate was based on a n removing 18 inches to 2 feet of silt from the boxes. rged on about 55 feet per day due to the extra work it ost us an extra 6 days at $2,661.75 per day. The estimated ,s, this is 11 days more than we had estimated. I have we discovered. We feel there is excessive material over A it is the same hard packed clay below about 6" of sift. to compensate for changed material conditions. Due to w unit price of 561.02 per ey, and adjustment in quantity ion Adiusted Unit Price T, old from Box $41.77 $23,808.90 10 $61.02 $34,781.40 C1 520 CY Remove Si from Box $41.77 $21,720.40 Adjusted 871 CY Culvert 2 At 14 $61.02 $53,148.42 As soon as we encountered the heavy material make him aware of the differing site condition commence on the north set of boxes. Please ca discuss any questions you might have. Sludge ' Si ou Oaie Komarek Project Manager Cc: STl /fife re contacted Brad Rusk Nathan D. Maier Engineers to We need to resolve this change order before we me after you read over this proposal and we can meet to cchnology wants to resolve this as soon as possible. CHANGE ORDER No.2 PROJECT: 2005 Sediment Remo al EFFECTIVE DATE: 01/31/06 DATE OF ISSUANCE:01 /31/06 OWNER: Northwest Dallas Countv Fl od Control District CONTRACTOR: Sludge Technology, Inc. ENGINEER: Nathan Maier Consulting Engineers You are directed to make the following changes in the Contract Documents. Description: Increase cost to cover unantici a ed conditions in box culvert between Sum s 9 & 10. Reason for Change Order: Hard clay and san I encountered in box culvert. ange) NA Attachments: (List documents supporting c CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times: 90 Working Days Substantial Completion: 90 Working Days $247,120.30 Ready for Final Payment: 100 Working Days Contract Price Prior to this Change Order Net Change From Previous Change Orders No. 1 to No. 1 $252,120.30 30 Days Net Increase (Decrease) of this Change Order Net Increase (Decrease) of this Change Order $10.972.50 0 Days Contract Price wall Approved Change Orders Contract Times with all Approved Change Orders Substantial Completion: 120 Working Days $263,092.80 Ready for Final Payment: 130 Working Days RECOMMENDED AP=(thufied ACCEP Signature) Contrac or (A�yhorized Signature) Date: % Engin er ( uthorized Signature) Date: % / !- Date: 1 EJCDC No. 1910 -8-B (1990 Edition) ,�tC-6- J;MiP-hCTVr 5 p *v ut`3 S 1 ,0" � f I of-M.," Q t r C-r t 44 cy PLA -6? .5�Lv aL Noo4 RESOLUTION OF THE CITY OF COPPELL RESOLUTION NO. ;?00 (o GZZU• / A RESOLUTION OF THE CITY TEXAS, APPROVING AN AMENDMENT NORTHWEST DALLAS COUNTY FLO( REMOVAL FROM BOX CULVERTS Bf THE ORIGINAL COST OF $45,529.3a PROVIDING AN EFFECTIVE DATE. COUNCIL OF THE CITY OF COPPELL, O THE INTERLOCAL AGREEMENT WITH D CONTROL DISTRICT FOR SEDIMENT iEATH RIVERCHASE DRIVE TO REVISE TO AN AMOUNT OF $87,929.82; AND NOW, THEREFORE, BE IT RESTLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the City Council a between the City of Coppell and Northwest removal from box culverts beneath Riverchase amount of $87,929.82, as set forth in the amen( eves the amendment to the Interlocal Agreement gas County Flood Control District for sediment ve to revise the original cost of $45,529.30 to an nt, which is attached hereto as if set forth in full. SECTION 2. That this resolution shall take effect immediately from and after its adoption and it is so resolved. DULY PASSED and approved this the 2&VAday oft ROBERT HAGEPV y TY ATTORNEY the City Council of the City of Coppell, Texas on CITY VF CO LAS N.1.S--�TOVER, MAYOR ATTEST: L1BBY B ITY SECRETARY Exhibit A M OV THIS AMENDMENT IS MADE BY corporation, hereinafter called "the City" hereinafter referred to as "the District ". TO L AGREEMENT ROM BOX CULVERTS BENEATH BETWEEN the City of Coppell, a municipal Northwest Dallas County Flood Control District, WHEREAS, the City and the Distric entered into an Interlocal Agreement, hereinafter referred to as "the Agreement', on October 1 , 2005 to effectuate their agreement for sediment removal from box culverts beneath Riverchas Drive; and WHEREAS, it has become necessary io amend that Agreement; NOW, THEREFORE, in consi agreements of the parties hereto, the City and of the premises and of the mutual covenants and District do agree as follows: AGREEMENT Article 1. Description of Amended Items Exhibit A Resolution of the City of Coppell (C Agreement. Section I. The City and the District agree that $87,929.82. All other provisions of the original and effect. INTERLOCAL AGREEMENT AMENDMENT PAGE ty) is attached hereto and made a part of this City's cost will increase from $45,529.30 to eement are unchanged and remain in full force The signatories to this amendment v agreement on behalf of the organization they This Amendment shall be filed in the deed EXECUTED this day of Dallas County Flood Control District, and 2006. NORTHWEST DALLAS COUNTY FLOOD CONTROL DISTRICT By: Wa President ATTEST: APPROVED AS TO FORM: Attorney INTERLOCAL AGREEMENT AMENDMENT PAGE that each has the authority to enter into this of Dallas County, Texas. 2006, by the Northwest the City of Coppell adopted on the day of CITY OF COPPELL, TEXAS Mayor ATTEST: Libby Ball City Secreta APPROYE1� AS TO FORM: Robert E. City Atto: