Loading...
NW Dallas-AG051011T " E - ` T Y - ° F DI, Engineering AGENDA REQUEST, f2M COP ELL DATE: October 11, 2005 T o ITEM #: 11 /B ITEM CAPTION: Consider approval of entering into an Interlocal Agr ement with Northwest Dallas County Flood Control District for sediment removal from box culverts beneath Riv rchase Drive, in an amount of $45,529.30 as provided for in the Drainage Utility District fund; and authorizing th Mayor to sign. APPROI CITY CC ON ABO) GOAL(S). EXECUTIVE SUMMARY: Approval of this agreement will allow the City to 1 Flood Control District using funds collected from culverts beneath Riverchase Drive. The City previou District in sediment removal from box culverts beneal Staff recommends approval of the interlocal al will be available to answer any questions at the LQ FINANCIAL COMMENTS: Funds are available in t agreement. Agenda Request Form - Revised 09/04 'ED BY UNCIL 'E DATE Motion to Approve M - Tunnell S - Peters Zoos2W5 m i can a 114!15 -7-0 05� irticipate in another project with Northwest Dallas County Ze Drainage Utility District to remove silt from nine box ly participated with Northwest Dallas County Flood Control i MacArthur Blvd. I with Northwest Dallas County Flood Control District and 1 meeting. Municipal Drainage Utility District fund for this Document Name: #NWDCFCD Interlocal T H E I T Y O F COFFELL e x A t a g MEM RANDUM TO: Mayor and City Council FROM: Kenneth M. Griffin, P.E., Director DATE: October 11, 2005 REF: Consider approval of entering it County Flood Control District Riverchase Drive, in an amount c District fund; and authorizing the The City of Coppell was recently contacted County Flood Control District (the District) c silt from ponds that exist in the District's Course property. Council may recall that approved by Council for the city to participate on flood studies performed by the District's Inc., the silt within the existing ponds and cu . create potential flooding problems for home,, Lake Woodlands, North Lake Woodlands Jefferson at Riverchase, Stoneleigh at Riverc Coppell Crossing. The District opened bids on the second phase bid was structured in such a way that all wo the Riverchase Golf Course, was bid as the b silt removal from the box culverts bene, Riverchase Dr. In the July 12, 2005 letter f bidder was disqualified because they didn't s the bid to Sludge Technology. This is the s removal from the culvert beneath MacArthur Engineering and Public Works I an Interlocal Agreement with Northwest Dallas r sediment removal from box culverts beneath $45,529.30 as provided for in the Drainage Utility layor to sign. y the engineer representing the Northwest Dallas ncerning the continuation of the project to remove ea, generally located within the Riverchase Golf :)n March 8, 2005 an interlocal agreement was in the first phase, in the amount of $17,964. Based ;ngineer, Nathan D. Maier Consulting Engineers, ,erts beneath MacArthur Blvd. and Riverchase Dr. within Riverchase Estates, The Hollows at North 'ast Section IOC, the apartment complexes of .ase and several commercial businesses located in f the Silt Removal Project on April 19, 2005. The within the District's ponds, generally located on ;e bid, with alternate bids B1 and Cl provided for i MacArthur Blvd., near its intersection with in the District, it was noted that the overall low )mit a bid bond. Therefore, the District awarded ne company who successfully completed the silt lvd., near Riverchase Dr. in the first phase. The Northwest Dallas County Flood Control District was created by the 69th Legislature in 1985. They were created as a "Conservation and Reclamation District to operate and exist as a governmental agency, a body politic and co orate, and a political subdivision of this State ". Because they were created as a political subdivision of the State, the Texas Interlocal Cooperation Act, contained in Chapter 791 o the Texas Government Code, allows the City of Coppell to enter into an agreement with the Di trict to perform functions and services. COPPEiLl YEARS IN 1935.4005 Attached to this agenda item is an interlo Northwest Dallas County Flood Control Dist pay the District the amount of $45,529.30 for culverts beneath Riverchase Drive. The rerr the potential flooding of residential homes in and the free flow of water is one of the acti) our Storm Water Management Plan, of which Staff recommends approval of the interlc Northwest Dallas County Flood Control available to answer any questions at the Cc I agreement between the City of Coppell and t which states in Article I that the City agrees to noval of silt from five 8'x 4' and four 8'x 5' box al of silt from those box culverts will eliminate area. Also, the removal of silt from the culverts es noted in the "Best Management Practices" of collect fees via the Drainage Utility District. agreement between the City of Coppell and the Arict in an amount of $45,529.30 and will be J meeting. COPPE(L YEARS 10 7955.2005 Northwest Dallas Di July 12, 2005 Mr. Ken Griffin, P.E. City of Coppell 255 Parkway Blvd. Coppell, TX 75019 RE: Northwest Dallas 2005 Sediment RE Request for Parth Dear Mr. Griffin: The Northwest Dallas County Flood Conl for the above referenced project located Coppell. The project includes removing District's maintenance responsibilities. A included alternate bid items for removing culverts under Riverchase Drive. These i project at the City of Coppell's (The City) culverts. The 2005 Sediment Removal project wa: advertisement is attached for your refere publicly on April 19, 2005.The winning bi, Sludge Technology, Inc. (STI). They are work for the Sump 11 Sediment Remova funds to remove silt from the box culvert while STI did submit the lowest bid for th have the lowest total bid. The company v bond at the time of the bid opening. The bid without the bid bond attached. unty Flood Control ict Flood Control District Project il District (The District) recently solicited bids the Riverchase Golf Course in the City of t from Sumps 2, 9, 10 and 14 as part of The a part of that bid package, The District ie silt located inside the 4 -8x4 and 4 -8x5 box ms were kept separate from The District's ;quest because The City owns the box publicly advertised and bid. A copy of the ce. Sealed bids were received and opened der for the 2005 Sediment Removal project is ie same contractor who recently completed project in which the City participated with nder MacArthur Boulevard. Please note that box culvert portions of the project, they did not Ith the lowest total bid failed to submit a bid )istrict determined they could not accept any STI's bid for Sumps 9 and 10 was $125,687.00. The bid for Alternate A for Sumps 2 and 14 was $75,904.00. The cost for Alternat a B to clean the box culvert between Sumps 9 and 10 is $23,808.90. The cost for Alternate C to clean the box culvert between Sumps 2 and 14 is $21,720.40. A bid tabulation is attached for your information. The District respectfully requests The C work to remove silt from the 4 -8x4 and � (Alternates B and C). This amount total y's participation in funding the portion of the 8x5 box culverts under Riverchase Drive $45,529.30. 10246 Midway Road, Suite 202, Dollas, Texas 75229 -6233 Ph. 214.351.4121 If you have any questions, please consideration of our request. Sincerely, THE NORTHWEST DALLAS COUNTY 4 !%Ot�� Wayne Reynolds President cc: Brian J. LaFoy, P.E. — NDMCE Attachments: Advertisement and Publisl Bid Tabulation Exhibit 1 —2005 Sediment District verification of non- our engineer or us. Thank you for your CONTROL DISTRICT is Affidavit moval Site Map fit status ADVERTISr;MENT FOR'Jj " J SIDS QQ(( OCv Nr��w� et1 j NO. 87 -12 -150.1 Sealed competitive propos- PUBLISHER'S AFFIDAVIT als as set forth and required . w the shall lions (either of The State Texas which shall hereinafter be a of referred to as "The Bid ") addressed to the Northwest Dallas County Flood Control COUNTY OF DALLAS District (The District) will be received at the office of Nathan D. Maier Consulting BEFORE ME , THE UNDERC IGNED NOTARY PUBLIC in and for said County, Engineers, Inc. ( NDMCE) State of Texas, this day peac onally came and appeared THE PUBLISHER, to until 2:00 p.m.. April 19. 2005 me well known, and who afte being by me duly sworn, did depose and say: for the following: 2005 Sediment Removal .This project consists. of ttie That he is the publisher of THE DAILY COMMERCIAL RECORD, a daily removal of sediment in four Newspaper published at Dallas, Dallas County, Texas, and that the notice ponds and two box culverts hereto attached was published in said newspaper on the following dates, to wit: within the District on the Golf Course in OaA �� ��O / 7 �00 r'' l Copptrace Coppell, Texas: �1 Instructions to Bidders: Proposal packets ( "Project E. NUEL CATES, JR. Documents ") may be Publisher from the NDMCE office, .8080 Park Lane, Suite 600, Dallas, Texas 75231. A pre -bid conference will be Sworn to and subscribed befo me this day of 20 held at 10:00 a.m., April 12, 2005 at the Riverchase Golf Club, 700 Riverchase Drive, �wv a'�% MINN11E FRaN.'4KLf Coppell, Texas 75019. ` o t 4�;_ otary Public, Sta #e cf exas es Not ry Public, Dallas County, Texas y� �= My Commission Expi 3131 -417 :per +� °:;;;;� 08/29/2008 4 WHEREAS, the City of Coppell, Texas, hereinafter referred to as "the City," and the Northwest Dallas County Flood Control enter into this Interlocal Agreement, removal of sediment from existing culverts b WHEREAS, the Texas Interlocal Texas Government Code, authorizes Texas other local governments to perform governor Act; and hereinafter referred to as "the District" desire to referred to as "the Agreement," relative to Riverchase Drive.; and Act, contained in Chapter 791 of the governments to contract with one or more functions and services under the terms of said WHEREAS, the City and the Districticoncur that this Agreement is in the best interest of the citizens of Coppell and the District; NOW, THEREFORE, THIS A City and the District for the mutual and conditions, as follows: is hereby made and entered into by the on stated herein, subject to the following terms I. The City and the District acknowledge that the removal of sediment will be performed in accordance with specifications included in the bid that was opened on April 19, 2005 for "Sediment Removal at Sump # 2, 9, 10 and 1 . The location of the sediment removal is from the existing five 8'x 4'and four 8' x 5' box culverts located on Riverchase Drive, as shown on Exhibit 1 from Nathan D. Maier Consulting the City will pay the amount of $45,529.30 INTERLOCAL AGREEMENT PAGE 1 Inc. The City and the District agree that the removal of the sediment as shown in Item #Bl and Cl. in the bid tabulation, attached aE Exhibit 2. The City and the District agree that the $45,529.30 will be escrowed with the Distric and that the District will administer the project and cause the removal of the sediment from beneath Riverchase Drive. This Agreement may not be assi parties and may not be amended except in existing five 8'x 4' and four 8' x 5' box culverts II. It embodies the entire agreement between the III In the event of any disagreement r conflict concerning the interpretation of this Agreement, and such disagreement cannot ba resolved by the signatories hereto, the signatories agree to submit such disagreement to mediati n. IV. No modifications or amendments to Vs Agreement shall be valid unless in writing and signed by the signatories hereto or their heirs, Isuccessors and assigns. V. This Agreement shall be governed bd and construed in accordance with the laws of the State of Texas. Venue for any action arisin4 under this Agreement shall lie in Dallas County, Texas. This Agreement shall become a b all signatories hereto. The District war, Agreement on behalf of the District has full District to the same. The City warrants INTERLOCAL AGREEMENT PAGE 2 VI. g obligation on the signatories upon execution by and represents that the individual executing this authority to execute this Agreement and bind the ►d represents that the individual executing this Agreement on behalf of the City has full au the same. This Agreement shall be filed in the EXECUTED this --/� day of Dallas County Flood Control District, and t of �,� 1 , 2005. NORTHWEST DALLAS COUNTY FLOOD CONTROL DISTRICT By: Wa President ATTEST: APPROVED AS TO FORM: mil/ 8�tr4,c7� �' f�►'� �� Attorney INTERLOCAL AGREEMENT PAGE 3 to execute this Agreement and bind the City to VII. records of Dallas County, Texas. , 2005, by the Northwest the City of Coppell D-°- adopted on the day CITY OF COPPELL, TEXAS By: Doi Mayor ATTEST: Libby Ball City Secretary APPRO Robert E. Hai City Attorney AS TO FORM: Northwest Dallas County Flood Control District Bid Tabulation NDMCE Bid Opening Date: 04/19/2005 2:00 PM 2005 SEDIMENT REMOVAL 87- 12 -150.J Sheet 1/1 Item No. Description Qty. Unit Dredging Technologies Unit Cost Total Cost Sludge Technology Unit Cost Total Cost I Mobilization 1 LS $18,500.00 $18,500.00 $24,000.00 "$24,000.00 2 SWP3 Execution 1 LS $2,000.00 1 $2,000.00 $2,500.00 $2,500.00 3 Sediment Removal by Hydraulic DEd in - Sump 9 '2,320 CY $7.36 2 ' $17,075.20 $25.40 $58,928.00 4 Sediment Removal by Hydraulic Ded in - Sump 10 1,585 CY $7.36 3 $11,665.60 $25.40 $40,259.00 TOTAL BASE BID $49,240.80 41 $125,687.00 Al Mobilization 1 LS $18,500.00 $18,500.00 $16,000.00 $16,000.00 A2'' SWP3 Execution 1 LS $2,000.00 $2,000.00 $2,500.00 $2,500.00 A3 Sediment Removal by Hydraulic Dredging - Sump 2 1,200 CY $5.04 8 $6,048.00 $25.40 $30,480.00 A4 - Sediment Removal by Hydraulic Dred in - Sump 14 1,060 CY $5.04 9 $5,342.40 $25.40 $26,924.00 TOTAL ALTERNATE A BID $31,890.401 $75,904.00 B1 Remove Silt from Box Culvert between Sum s 9 & 10 570 CY $45.06 $25,684.20 $41.77 < $23,808.90 TOTAL ALTERNATE B BID $25,684.20 $23,808.90 Cl Remove Silt from Box Culvert between Sum s 2 & 44 520 CY $45.06 $23,431.20 $41`.77 " $21,720.40 TOTAL ALTERNATE C BID $23,431.20 $21,720.40 ITOTAL BID WITH ALTERNATE $130,246.60 $247,120.30 Notes: 1 No amount entered in Unit Price Column. 2 Description Column - Bid amount (17,075) entered as a Unit Cost and in numerals instead of "intended" Unit Price (7.36) spelled out. 3 Description Column - Bid amount (11,665) entered as a Unit Cost and in numerals instead of "intended" Unit Price (7.36) spelled out. 4 Total was $49,240.60 instead of $49,240.80. 5 No amount entered in Unit Price Column. 6 No amount entered in Unit Price Column. 7 Description Column - Bid amount (2,000) entered in numerals instead of spelled out. 8 Description Column - Bid amount (6,048) entered as a Unit Cost and in numerals instead of "intended" Unit Price (5.04) spelled out. 9 Description Column - Bid amount (5,342) entered as a Unit Cost and in numerals instead of "intended" Unit Price (5.04) spelled out. EXHIBIT NO. 2 li J -E-XlS77NG GABION GRADE CONTROL STRUCTURE A -5-8m4 BOX CULVERT . SUMP 74 \\ � J' i r(. -P 2 EVS 77NG VEGE TA TIED SWAGE EXISTING WGE TA TED SWAGE SUMP b SUMP 2?A -BELT LINE RD. rl -1 (D JA SUMP b 200 100 0 200 400 15mmmm" SCALE FEET db F//////// SEDAWNT REMOVAL AREA `I C ['V11 NATHAN D. MAIER CCN�SULTING EN 2005 SEDIMENT REMOVAL SITE MAP EXIHIBIT SUMPS 2. 2A, 9, 10 & 14 NORTHWEST DALLAS COUNTY THE GTE' OF COPPELL FLOOD CONTROL DISTRICT DALLAS COUNTY, TEXAS a.e 9- NOM N.. AS SHOWN � 7/05 87150C SME 5712150 J Two BnBO Park S-te 503 Oallas, Texas 75231 / (214) 739-4741