CF-Andrew Park 2-LR 921022 (3)ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
CONCRETE TEST REPORT
Project: Andrew Brown Park
Date Sampled: 10/22/92
Client: Tony Crawford Construction
Our Report No.: 25-02-92-06928-24
Field Test Data
Location of Pour when Sampled: PAVING, 100' NORTH OF PARKWAY BLVD.; WEST SIDE OF DRIVEWAY,
30' EAST OF PLAYGROUND'S EAST FENCE.
Unit Weight (C-138) Supplier/Plant TXI #31
Sampled By $COTr BERRY Delivery Ticket No. 420?3
Time: Batched ~;00 AM Sampled I~;~0 AM Truck Number 202 Load Size ....
Temperature: Air 68°F Concrete $2°F Mix 1D No. ~272. 3000 PSI
Slump: $,0 in. Air Content % Water Added on Site 10,0
(C-143) (C-173/C-231)
10.O
cu. yds.
Gals.
Stren2th Test Results
(c-3~)
Type ~zcimem: CYLINI)EI~ Are~: 28.27 in? ~ Tm ~m (C-~)
~b ~ Da~ Age. Fa~ S~, Avg Avg ~m, S~I
No. ~ T~ D~s ~, ~s. ~I Wi~, ~ ~, ~ P~
1-1371 ~B 1~29 7 89,5~ 3170
1-13~ ~B 11-19 28
1-1373 ~B 11-19 28
!-1374 ~B 11-19 H
S~ ~G~ 28 3~
Remarks:
Respectfully submitted,