CF-Andrew Park 2-LR 921019 (2)ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
METRO 263-1681
Project:
Client:
CONCRETE TF_. T REPORT
ANDREW BROWN PARK Date Sampled: 9/19/92
TONY CRAWFORD CONSTRUCTION Our Report No.: 25-02-92-06928-11
Field Te t Data
Location of Pour when Sampled: MAN HOLE ON UTILITY LINE 30' N OF NW CORNER OF PARKING LOT
Unit Weight (C-138) Supplier/Plant
Sampled By CLIENT Delivery Ticket No.
Tune: Batched Sampled Truck Number,. Load Size cu. yds.
Temperature: Air ~F Concrete ~F Mix I~ No.
Slump: in. Air Content % Water Added on Site Gals.
(C- 143) (C- ! 73/C-23 l)
Strength Test Results
(C-39)
Type Speehnens: CYLINDERS A~: 28.27 in.~ I~.~,m Test Dam (C-78)
Lab Type Date Ag~. Failure Strength. Av~ Av$ Span. Special
No. Curing T~sted Days Loll lbs. PSI Width, in. Depth, in. Preparation
in.
1-9394 LA B 9-26 7 91.000 3220
1-9395 LA B I 0-17 28 128.500 4550
1-9396 DAB l 0-17 28 135.000 4780
1-9397 l~S,B 10-17 Iq
SPECIFIED STRENGTI1 28 3000
Remarks:
Respectfully submitted,