Loading...
CF-Andrew Park 2-LR 921009ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Name: ANDRE~/ BROI41 PARK ATEC Job No.: 25-02-92-06928-18 C[ient NanN~: TONY CRAWORD CONSTRUCTION Ctiont Job No.: General Contractor: TOIIY CRAI~IIO COIISTI~CTiOll Date: 10/09/9~ Test #o. Moisture ~( Dry Density Proctor X of Proctor Pass Fetl Fait Etevation/ Location (PCF) Iio. Compaction Moisture Refer F.G. Grid Coordinates Spec Actual or Roadway Station 1 18.5 102.8 1709 95. 95.7 X F.G. 30' # + 30' E of S end of island C 2 11.1 102.9 1709 95. 95.8 X F.G. 120' ~1 + 25' E of S end of istand 3 17.5 103.7 1709 95. 96.6 X F.G. 8' # + ZO' £ of H end of island 4 16.2 103.1 1709 95. 96.1 x ,., F.G. 3' # + 2' t~ of N end of tslimcl 5 ,, 16.7 10~.1 1709 95. 97.0 X F.G. 15' S + 23' 1~ of # end of island 6 10.5 102.6 1709 95. 95.6 X F.G. 78' # + 32' ~/ of S end of island 7 15.0 102.8 1709 95. 95.8 X F.G. 13'$ + 2' E of S end of island (1) Test Location EstabLished by: Grid Lines [~ Control Points I'~ Estimation [~ Contractor [] (2) Depth or Elev. of Test Established by: Survey ~ Grade Stakes[] Estimation ~--] Contractor [~ (5) Test Conducted on: Ful[ Time Basis ~ ~-] Intermittent Basis . . Proctor No. Maximum Density (PCF) Opt. Moisture (~) Stand. Proctor Mod. Proctor Total Time: Z.50 17o9 lO7.3 17.o [] [] r-~ ~_j ATEC REPRES£NTATD/~ John R. Tra¥is Re~narks: Respectful iy S~i tted,