CF-Andrew Park 2-LR 921028ATEC Associates, Inc.
11356 Mathis Avenue
Dallas, Texas 75229
(214) 556-2204
M~TRO 263-1681
CONCRETE TEST REPORT
Project: Andrew Brown Park Dat~ Sampled:
Client: Tony Crawford Construction Our Report No.:
10/28/92
2~-02-92-06928.29
Field Test Data
Location of Pour when Sampled: Paving, North End of Parking Lot, First 1/3 of Circle
Unit Weight: (C-138) SuppUer/Plant: TXI, ~31
Sampled By: Scott Berry Delivery Ticket No.: 44198
Time: Batched 11:11 Sampled 11:55 Truck Number: 206 Load Size:
Temperature: Air 77°F Concrete 82'F Mix ID No.: 8272, 3000 PSI
Slump: 4.0 in. Air Content -- Water Added on site: ._ I0 C. ml~.
(C-143) (C-173/C-231)
10 cyds.
Stren~h Test Results
(C-39)
Remarks:
Respectfully subnfitted,