Tax 2011B-PT130604 SEMI
WNW 11111111111111
MMIN
MIN
r +rr
SMALL CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality(TCEQ)
Storm Water Program
TPDES GENERAL PERMIT TXR150000
The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit
Number TXR150000 for discharges of storm water runoff from small construction sites. Additional
information regarding the TCEQ storm water permit program may be found on the internet at:
http://www.tceq.state.tx.us/nav/permits/wq construction.html
Operator Name: CPS Civil, LLC
Contact Name and Phone Number: Candice Murphy 972-674-2950
Vanbebber Dr. From S. Denton Tap Rd. to Heartz Rd.
Project Description: Physical address or
description of the site's location, estimated start
date and projected end date, or date that disturbed
soils will be stabilized Estimated Start: October 1, 2012
Projected End: April 1, 2013
Location of Storm Water Pollution Prevention Plan: Field Office
For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge)
the following certification must be completed:
Robert Farrow (Typed or Printed Name Person Completing This Certification)certify under
penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2.of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention
plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this
signed notice is supplied to the operate of the MS4 if discharges enter an MS4. I am aware there are significant penalties for
providing false information or for co-d ting unauthorized discharges,including the possibility of fine and imprisonment for
knowing violations.
Signature and Title f / ) £t 0/ Lob Date /Q/Q(//Z
(e/q/1 3 Date Notice Removed
MS4 operator notified per Part II.F.3.