DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
North Gateway Plaza, Lot 7R, Block A, Final Plat,
to establish various utility
and fire lane easements to allow the development of a 6,542 square-foot
restaurant, with a 964-square-foot patio and 2,500 square foot of retail uses on
1.88 acres of property located on the west side of Denton Tap Road,
approximately 400 feet north of S.H. 121 (775 North Denton Tap Road), at the
request of request of Dirk Laukien, Black Forest Ventures, being represented by
Charlie Holland, Binkley & Barfield/C&P.
STAFF REP.: Matt Steer PROJECT ID# FPNR-13-0029
DRC DATE:
April 25, 2013 and May 2, 2013
CONTACT:
Michael Garza, P.E., Civil Engineer, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. A utility easement may be needed for the domestic meter cans.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-108R11-H, Old Town (Main Street), Phase II,
a zoning change request
from PD-108R8-H (Planned Development-108 Revision 8-Historic), to PD-
108R11-H (Planned Development-108 Revision 11-Historic), to establish a
Detail Site Plan for 64 patio-home lots and five common area lots on 8.64 acres
of property located on the northeast corner of South Coppell Road and the drive
leading to the Service Center, at the request of CSE Commercial Real Estate,
Ltd., being represented by Mike Glenn, Glenn Engineering.
STAFF REP.: Matt Steer PROJECT ID# PD-13-0030
DRC DATE:
April 25, 2013 and May 2, 2013
CONTACT:
Michael Garza, P.E., Civil Engineer, 972-304-7019
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. The proposed alley connecting to the east property was required to be a 24' fire lane.
2. Do we need a standard cul-de-sac on the north side of Cameron Ct.
3. Previous easements will need to be abandoned.
4. Why not 50' ROW?
5. There will be additional comments during detailed engineering plan review.