Loading...
Gateway BP(3.2)-CS130625 Imo 12225 Greenville Avenue, Ste. 200::: Dalla(214)x572 2272 Fax(214)572-2273 LETTER OF TRANSMITTAL To: Mike Garza, P.E. Date: June 25, 2013 City of Coppell Engineering Department 265 Parkway Blvd. �5 Coppell, Texas 75019 � � From: Ben Stephens, P.E. AVO: 25322 Freeport Corporate Email: bstephenshalff.com Center Building 7 WE ARE SENDING YOU MAttached ❑ Under separate cover via_ the following: ❑ Shop Drawings ❑ Prints ® Plans ❑ Drawings ❑ Specifications ❑ Copy of letter ❑ Report(s) ❑ CD/DVD ❑ Other: VIA: ❑Hand Delivery ❑US Postal Service Courier ❑Overnight Express THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approval as submitted ❑ Resubmit_copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ® For review/comment ❑ Other: ITEMS SENT: • 2 full-size sets of Engineering Plans for Freeport Corporate Center Building 7 (Gateway Business Park, Block 2, Lot 3C-R), for City Engineering Department review • 1 copy each of Engineering comments from the original submittal in late 2007 and Halff's responses to those comments at that time COMMENTS: The site plan for this site was approved by Planning and Zoning on Monday, June 24. Please note that this is a re-submittal of a set originally reviewed in late 2007. The site plan and thus the engineering plans have been modified somewhat for this round of City submittals/approvals. For ease of reference if needed, I've included in this package a copy of the original Engineering review comments from November 2007 and our responses at that time. Please let me know if you have any questions or need additional information or copies. Thank you, SIGNED: t� try COPIES: ® File ❑ Owner ❑ Contractor ❑ Other: