Gateway BP(3.2)-CS130625 Imo 12225 Greenville Avenue, Ste. 200::: Dalla(214)x572 2272
Fax(214)572-2273
LETTER OF TRANSMITTAL
To: Mike Garza, P.E. Date: June 25, 2013
City of Coppell Engineering Department
265 Parkway Blvd. �5
Coppell, Texas 75019 � �
From: Ben Stephens, P.E. AVO: 25322
Freeport Corporate
Email: bstephenshalff.com Center Building 7
WE ARE SENDING YOU MAttached ❑ Under separate cover via_ the following:
❑ Shop Drawings ❑ Prints ® Plans ❑ Drawings ❑ Specifications
❑ Copy of letter ❑ Report(s) ❑ CD/DVD ❑ Other:
VIA: ❑Hand Delivery ❑US Postal Service Courier ❑Overnight Express
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approval as submitted ❑ Resubmit_copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
® For review/comment ❑ Other:
ITEMS SENT:
• 2 full-size sets of Engineering Plans for Freeport Corporate Center Building 7 (Gateway
Business Park, Block 2, Lot 3C-R), for City Engineering Department review
• 1 copy each of Engineering comments from the original submittal in late 2007 and Halff's
responses to those comments at that time
COMMENTS:
The site plan for this site was approved by Planning and Zoning on Monday, June 24. Please note that
this is a re-submittal of a set originally reviewed in late 2007. The site plan and thus the engineering
plans have been modified somewhat for this round of City submittals/approvals. For ease of reference if
needed, I've included in this package a copy of the original Engineering review comments from
November 2007 and our responses at that time.
Please let me know if you have any questions or need additional information or copies. Thank you,
SIGNED: t� try
COPIES:
® File ❑ Owner ❑ Contractor ❑ Other: