Loading...
ST9902-CN130625 tnp teague nail & perkins CITY OF COPPELL CONSULTING ENGINEER'S CONTRACT MODIFICATION TO THE SCOPE OF SERVICES AMENDMENT#7 I. Scope of Work THWEATT PARK TRAIL (ENGINEERING) TNP shall provide professional civil engineering services, as outlined below, for completing the preparation of design plans for the West Sandy Lake Road reconstruction project. This modification is for additional services associated with the existing contract. The portion of roadway between North Coppell Road and South Coppell Road (also referred to as Phase 2A) is adjacent to Thweatt Park and entails the design of an 8-foot wide trail that diverges away from the roadway and meanders through the park before connecting to a trail along South Coppell Road. The following are anticipated additions to the scope of work: • Additional meetings and correspondence with City representatives including Parks Department. • Provide ADA complaint park trail alignment from the new Sandy Lake Bridge, arching to the south side of the existing pond and connecting with the new City sidewalk/trail a North Coppell Road-Sandy Lake intersection; o The proposed alignment shall be established in attempt to protect/preserve existing trees; o The alignment will be field verified once staked by the contractor prior to construction; • Engineering considerations for traversing the existing earthen pond spillway, including the addition of a culvert or low water crossing of the spillway: o Evaluation of the existing morning glory structure is excluded; • Erosion control measures needed/expected; • Evaluating/Addressing the PVC pond liner leak (liner damage is anticipated in the eastern third section of the pond). THWEATT PARK TRAIL (SURVEYING) • Additional topographic survey of the remainder of Thweatt Park to establish existing contours within the park; • Additional tree survey of trees 6-inch diameter and larger to help in defining grading and routing options that minimize impacts to existing trees within park; TRAIL EASEMENTS TNP shall provide additional survey services as needed in order to prepare necessary easements documents for Trail/Sidewalk located between Whispering hills and Georgian Drive. For the purposes of this proposal it is understood that a maximum of 7 easements will be required. II. Compensation The Engineers contract shall be paid an additional lump sum fee as detailed below: Thweatt Park Engineering $8,500 Thweatt Park Surveying $1,500 Trail Easements(7 easements at $1.500 each) $10.500 TOTAL $20,500 • Amendment#7 (Current) $20,500 $1,435,620 Page 2 AGREED: AGREED/ACCEPTED: THE CITY OF COPPEL TEAGUE NALL AND PERKINS, INC. By: By:3(431))),)Z LirAd Date: ZS Za/3 Date: b 1'' 'G Attest: �'��%�Qdbte_ Attest: Page 3 •