CF-Andrew Park 2-LR 921021 (4)ATEC Associates, Inc.
11356 Mat~s Av~muo
Dallas, Texm 75229
(2~4) 556-2204
METRO 263-1681
CONCRETE TES~ REPORT
l~-oject:
Clien~
Andrew Brown Park
Tony Crawford Construction
~ Smnpled:
Om' Report No.:
10/21/92
25-02-92-06928.25A
Field Test Data
Location of Pour when Sampled: Paving Slab, 70' S. and 34' l/. of Fir~ Hydrant at SW Comer
Unit Weight: (C-138)
Sampled By: 1ohn Travis
Tune: Batched 10:11
Temperature: Air 70°F
Slump: 4.25 in.
(C-143)
Sampled 11:10
Concrete 76'F
Air Content 4.5 ItS
(C-173/C-231)
S~ppller/Plant: TXI,//31
Delivery ~l'~cket No.: 41673
Truck Number: 104 Load Size:
l~x ID No.: 8272, 3000 PSI
Water Added on site: 10 Gals.
Strenc, th Test Results
(c-~)
I0 cyds.
SPEcu~W..D STRI!NOTH
Remarks: Washed gravel sidewalk.
Respectfully submitted,