Loading...
CF-Andrew Park 2-LR 921021 (5) ATEC Associates, Inc. 11356 Mathis Avenue Dallas, Texas 75229 (214) 556-2204 METRO 263-1681 FIELD DENSITY TESTS Project Name: Andreu Broun Park ATEC Jab No.: ZS-OZ-gZ-O69ZS-ZSB Client lima: Tony Crauford Cemtruction Ctient Jab Iio.: General Contractor: Tony Cra~ford Construction Date: lOIZ1/gZ 1 13.0 114.2 1717 95.0 95.3 X F.G. 8' N. and 10' E. of SW Corner of Btcl~. Z 11.9 113.9 1717 95.0 95.1 X F.G. 12' ~ snd 8' S. of NE Corner of Stcl~. (1) Teat Lo~etion Estabtiahed by: Grid Lines ..... Controt Points Estimation _.X__ Contractor (2) Depth or Etev. of Test Eatabtished by-' Survey Grad~ Stakes Estimation ._.X__ Contractor ¢3) Teat Conducted on: Fuil Time Basis Intermittent Basis __X__ Proctor No. Ilaximum Density (PCF) Opt. lloiatura (X) Stand. Proctor Hod. Proctor Total Time: 1717 119.8 !,,2, ,Z x Ramrks: Respectfut ty Submitted.