Loading...
GTE (Clear C2)-CS130701 (2) Rhonda Adloo From:Jennifer Clardy <jen@prestoncontractors.com> Sent:Monday, July 01, 2013 1:55 PM To:Rhonda Adloo Subject:RE: 724 Canyon Drive. Importance:High Yes, one is being overnighted to me and the other is being worked on. From: Rhonda Adloo [mailto:RAdloo@coppelltx.gov] Sent: Monday, July 01, 2013 1:49 PM To: Jennifer Clardy Subject: RE: 724 Canyon Drive. Have you checked with your subs about their maintenance bonds? I know we must receive those prior to Engineering issuing a final acceptance letter, but that may not have much to do with a temporary CO. From: Jennifer Clardy [mailto:jen@prestoncontractors.com] Sent: Monday, July 01, 2013 12:33 PM To: Rhonda Adloo Cc: Tim McMahon; Jennifer Clardy Subject: RE: 724 Canyon Drive. Importance: High Ok, so does Spairs still need to submit a final set? Also, any word on the streets punch list? From: Rhonda Adloo [mailto:RAdloo@coppelltx.gov] Sent: Monday, July 01, 2013 12:31 PM To: Jennifer Clardy Subject: RE: 724 Canyon Drive. I just found out the as-builts are OK. Building Inspections Dept. does the temporary CO’s From: Jennifer Clardy [mailto:jen@prestoncontractors.com] Sent: Monday, July 01, 2013 12:06 PM To: Rhonda Adloo Cc: Tim McMahon; Jennifer Clardy Subject: RE: 724 Canyon Drive. Importance: High Rhonda, I was wondering, could we get a Temp CO without these items? From: Rhonda Adloo [mailto:RAdloo@coppelltx.gov] Sent: Monday, July 01, 2013 10:17 AM To: Jennifer Clardy Subject: RE: 724 Canyon Drive. 1  Since we only received the as-builts late on Thursday afternoon, I can safely say they probably have not been looked at yet. rd  I don’t know what a 3 party energy inspection is, but I imagine it goes to the Building Inspections Dept.  The Streets Dept. punch list is on its way to me right now, will let you know ASAP if anything is left on it. From: Jennifer Clardy [mailto:jen@prestoncontractors.com] Sent: Monday, July 01, 2013 8:34 AM To: Rhonda Adloo Cc: Tim McMahon; Jennifer Clardy Subject: 724 Canyon Drive. Importance: High Good morning Rhonda, hope you had a good weekend. I was following up on the status of the Streets Dept. punchlist. Also, I was wondering if I could get a status on the review of the prelim as builds. rd On the 3 party energy inspection, who do I send that to? I have it completed. PLEASE NOTE OUR NEW ADDRESS… Jennifer Clardy Operations Manager Preston General Contractors, LLC 13740 Midway Road, Suite 603 Dallas, Texas 75244 972.890.7373 Cell 972.991.0498 Office 972.991.0499 Fax 2