Amberpoint 2R&3R-LR130627 American ---"" R . 4„ HAB&` Rehab & Inspections, INC. - (214) 536-2915 F I LOW PRESSURE AIR TEST FOR GRAVITY SANIT �' " -: Test Procedures : Each section of sewer shall be tested between successive mach es r'n 294. 0 4/ Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been rea h d At that tune%,o f air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi . ",_- for at least two qniinutes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. e . the .i e�y- ,1 be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce.' p e. Pressure I.-- �� e. Pressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found,the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table,the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table,the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Size Linear Feet Time Passed Passed SS-1 2+38+0+00 8" 228 7:33 Yes Yes SS-2 1+98-0+00 8" 188 7:33 Yes Yes Contractor: San Saba Date: 6/27/13 Project: IIT Northpoint Corp. Center Job#: Location: Tested By: Oscar Inspector: Larry Davis City Of: Coppell American Rehab & Inspections Office (972) 488-3042 / Cell (214) 536-2915 Project Project Name I I T Northpoint Corp. Location Street Center Date 6/27/2013 Direction Of Survey Upstream City Coppell PO Number Run Number 3.60 Purpose Pre-Acceptance Operator Name Ken Honeycutt Completed Yes Comments Pipe Asset ID Line SS-1 Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 227.6 Year Laid Year Renewed Sewer Use Sanitary Manhole Numberm MH 2+38 CO Upstream MH Depth Downstream MH 0+00 Downstream MH Number Depth Other Media Number Truck Number Contractor Name San Saba Weather Dry Project Name: I I T Northpoint Corp. Center Date: 6/27/2013 Asset ID: Line SS-1 Location: Street Upstream MH Number: 2+38 CO Length Surveyed: 227.5 Downstream MH Number: 0+00 Run Number: 3.60 Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride 0 ID Number: 0+00 (3.0) BS - Begin Survey (225.5) CO - Clean-Out (226.9) CO - Clean-Out (227.5) ES - End Survey Total Distance: 227.5 ID Number: 2+38 CO Project Name: I I T Northpoint Corp. Center Date: 6/27/2013 Asset ID: Line SS-2 Location: Street Upstream MH Number: 1+98 CO Length Surveyed: 188.2 Downstream MH Number: 0+00 Run Number: 3.80 Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride 0 ID Number: 0+00 (3.0) BS - Begin Survey (186.4) CO - Clean-Out (187.8) CO - Clean-Out (188.2) ES - End Survey Total Distance: 188.2 ID Number: 1+98 CO