Loading...
CF-Andrew Park 2-LR 940509 (7)-IA TESTING, INC. 615 Riverside Drive Fort Worth, Texas 76111 (817) 335-1266 REPORT OF PIER INSPECTION TESTED FOR RodmanExcavation, Frisco, Texas IBC, OATE: 05/09/94 OUR REPORT NO.: 94001-18D ARCHITECT: Mesa Group, Inc. PROJECT Andrew Brown Jr. C~]%¥~nity Park Coppell, Texas Phase II GENERAL CONTRACTOR: R~ Excavation PIER CONTRACTOR: Long & I.,ong Pier Drilling CONCRETE SUPPLIER: Lattimore PIER INFORMATION: P~er Designation Date Drilled Dale Concrete Placed Shaft Diameter - Design / Actual, inches Bell Diameter - Design Actual, inches Top Elevation - Design Actual Bottom Elevation - Design / Actual Deviation from Design - Bottom Elevation (ft ~) Steel Reinforcement Used: Vedical (No. & size) Ties (No. & spacing) Splices (No. & location) Length of casing used, ft. Estimated Allowable Bearing Capacity, ksf Total Pier Length Drilled, ft. REMARKS Northwest baseball fi el d 5 6 ? 05/09 05/09 05/09 05/09 05/09 05/09 18" / 18" 18" / ~8" ~8" / Z8" 36" / 36" 36" / 36" 36,, / 36" 96.0 / 96.0 96.0/ 96.0 96.0/ 96.0 85.0 l' 85.0 85.0/ 84.9 85.0/ 85.0 O,0 0.1 0.0 6~5's 6~5's 6~5's #3 sPR #3 sPR ~3 sm N/A N/A N/A N/A N/A N/A N/A N/A N/A 14.6 14.7 14.6 99.6 99- 6 99.6 ALPH~ YESTING,,,I,N C, DaVid * See daily field report.