GTE (Clear C2)-CS130703 T H CoFFEI;L
,,. __ ,,‘* ,-0 -- -_,
, __,,,, ,, „,
x °A s 5
July 3,2013
■
Tim McMahon
Preston General Contractors
13740 Midway Rd, Ste 603
Dallas TX 75244
RE: GTE Shared Services Addition,Lot 1R1B Replat
Final Acceptance
Dear Mr. McMahon:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two-year maintenance bonds and record drawings
have been received. Maturity on the bonds will be two years from the date of this letter.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year
bond period. If any punchlist items are noted at that time, you will be contacted to make
repairs. Thanks for your cooperation during the course of this project.
Since f,
". (-0e_.---------->"-
L.4 Davis
--------.....„\
• .truction Inspector
• 'ce Phone: (972) 304-3684
Fax: (972)304-3570
cc: Ken Griffin,P.E.,Director of Engineering&Public Works
Glenn Hollowell, P.E.,Public Works Manager
Michael Arellano, Chief Building Official
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673