Loading...
GTE (Clear C2)-CS130703 T H CoFFEI;L ,,. __ ,,‘* ,-0 -- -_, , __,,,, ,, „, x °A s 5 July 3,2013 ■ Tim McMahon Preston General Contractors 13740 Midway Rd, Ste 603 Dallas TX 75244 RE: GTE Shared Services Addition,Lot 1R1B Replat Final Acceptance Dear Mr. McMahon: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and record drawings have been received. Maturity on the bonds will be two years from the date of this letter. You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation during the course of this project. Since f, ". (-0e_.---------->"- L.4 Davis --------.....„\ • .truction Inspector • 'ce Phone: (972) 304-3684 Fax: (972)304-3570 cc: Ken Griffin,P.E.,Director of Engineering&Public Works Glenn Hollowell, P.E.,Public Works Manager Michael Arellano, Chief Building Official Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673