DR1201-CR130628 T H E • C 1 T Y • O F
COPPELL
*
X s I DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING 113 I �2 WALL&ROADWAY DATE J REPORT#
IMPROVEMENTS
DAY IM IT W T I® S S
PROJECT NO. DR 12-01
WEATHER SUN CLEAR VERCAST) RAIN SNOW
OWNER: CITY of COPPELL TEMP To 3 32-50 -70 70-85 8.6-orr
WIND Mod High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry „ lie Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
fivi acct -roV' .1.1 vi 51 ties 9- Bd '7.r1 '
u>II) oe lvi t�Q pro Pd li 1 ( ' tit Ie w S J tie 5 .
G
hey;AI R c) to A0'41 If ;14 the cr'ee}c.
i#vk cd1l i F-S1 , 1 I. wvairkiew
R g C o a pre;vU cu eaiYJNy /a/ wOyk aYeGl --
p cit/l , igliek11/S •Nof Redcey ) deli gdl1 ) 4Cj , sgl,o0 s,I* i'- ';3c' .
il ISIGNATURE
ENGINEERING INSPECTOR