Loading...
DR1201-CR130626 T H E • C 1 T Y • O F COPPELL A 5'p t 8 DAILY CONSTRUCTION REPORT PROJECT: CREEKVIEW DR RETAINING / /�/ / WALL&ROADWAY DATE 4./I 6'/w/ EPORT# IMPROVEMENTS DAY M I T T I F S S PROJECT NO. DR 12-01 WEATHER SUN .— OVERCAST RAIN SNOW OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 gym a WIND Still Mod CP Overtime Form CONTRACTOR: FAIN GROUP �' Submitted? Y /N HUMIDITY Dry Mod i'�� PROJECT INSP: LARRY DAVIS AVERAGE FIELD FORCE NAME OF NON-MANUAL MANUAL REMARKS CONTRACTOR/SUBCONTRACTOR VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: FXrevdr v rlf''efrfrrn'/v bf ff/-so yteGidlt t gCJ7 ,4 e p/a� / SIGNATURE ENGINEERING INSPECTOR