DR1201-CR130626 T H E • C 1 T Y • O F
COPPELL
A 5'p t 8 DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING / /�/ /
WALL&ROADWAY DATE 4./I 6'/w/ EPORT#
IMPROVEMENTS
DAY M I T T I F S S
PROJECT NO. DR 12-01
WEATHER SUN .— OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 gym a
WIND Still Mod CP Overtime Form
CONTRACTOR: FAIN GROUP �' Submitted? Y /N
HUMIDITY Dry Mod i'��
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
FXrevdr v rlf''efrfrrn'/v bf
ff/-so yteGidlt t gCJ7 ,4 e p/a�
/ SIGNATURE
ENGINEERING INSPECTOR