DR1201-CR130620 T H E G 1 T Y O F
COPPELL
* ;,
T � %.
o
x .
A s 1 a
DAILY CONSTRUCTION REPORT
PROJECT: WALL&ROADWAY AINING DATE 4/ Z9/ 4°?` REPORT#
IMPROVEMENTS
DAY M TIW 6) F IS IS
PROJECT NO. DR 12-01
WEATHER SUN €i i OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 50-70 70-85 . y�
WIND Still "---f Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Cu'I ti/dc,, r G!»,kt '9 d✓! S
v69y'
e rrc 'oe.h f
SLlecT 4')/ 5d .is/4 ®✓ fJ .� �
A b 7v J`c. -up sr J1 .
/live /o 4'ft /e eer) ejc1`S.t�7 f� i7`i`�e5 ash
6 1
ENGINEE• G INSPECTOR