Loading...
Red Hawk Comm-PT130715 A copy of the approved permit must be on the job site at all times. CC: Applicant Page 1 of 4 Public Works COFF'ELL Permit File Rev. 06/2012 Orig. to Project File A' .4 4 A., gppnowEDRIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval (-) Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd.or e-mail to engineer @coppelltx.gov(see button below) Date of Submittal: July 8th, 2013 Applicant's Job # / Work Order # 9PF13TM 028 PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes (i No C Q Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address 445 S DENTON TAP RD General Contractor HENKELS AND McCOY Contact# 214-507-1722 / 972-512-2943 E-mail address to return permit gregory.n.mick @verizon.corn Representative: Gregory Mick Franchise Telephone#: 972-318-5277 Company, E-mail address:gregory.n.mick @verizon.corn (for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C Oncor Electric Delivery C Atmos Energy C Verizon C SBC/ AT&T C Time Warner Cable C" CoSery Electric/Gas C` Other , u General,Description ofWork:.(in accordance with Ord.No 2001 944)'PLEASE ATTACH PLAN OF PROPOSED WORK, Verizon proposes to place a new 2`x 3 handhole at 445 S Denton Tap Rd in right-of-Way where custome'r's conduit will connect with Verizon's existing fiber service Estimated Start Date 07/22/2013 Estimated Completion Date* 08/22/2013 * Completion requires submittal of Completion Verification Notice (see page 4) >Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: C: Yes C No >Is removal of existing streets, alleys, or sidewalks necessary? C Yes C: No if YES,project must have City inspection prior to concrete replacement Right-of-Way Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense)and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. >Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department I@ 972-304-3679 Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. ➢Attach Work Order(franchise only)and/or 1 set of prints showing proposed work. Locates for existing franchise;utiiltles muit be done 48 hours prior jo beginning work. For City a#flit [orates, ca11972=462 5155 to schedule 48,ihours prior;to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept.for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail,provide a valid e-mail address on Page 1.) Gregory Mick 07/08/2013 Signature of Utility Company Representative Date Steve Forsythe 05-13-2013 Signature of Contractor Representative Date kk -1 IS ill Signatu - o City Representative Date Comments >NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Ct. In- 0 `' N, 0 ?rl{ Creme De 4 La Creme co V. a CD Overeaters Anonymous C) a 445 S. DENTON TAP Van Be .iber Dr. 1 i Carriage Ct ' 1 pie's . , f . Won eriand `t9 t}001 Rd t NinjaCOPS _ Superstore sue. Ct3 o US Post rt. rb, Office `"`' o a Q D REIMAX 0, Coppell in 1 0. 03 H Coppell Family Medical Center t cn r r, N I I 120' R.O.W. j VERIZON FIBER I � 445 S DENTON TAP I z Q I F z 11ii o I � o LJ v) IN 0 j S. DENTON TAP CPLACE VERIZON o `��� ' ' R.ow. — PROPOSED W-�� VERIZON --. — W I HANDHOLE W O 54" RCP W 8" WATER w BETHEL SCHOOL R� - 8" WATER -) Q I— z 0 z I- lii 54" STORM SEWER ) - CI CO Ln P - RVIT NOTE AREA VERIZON 9-Fs AREA STATE: TX VERIZON PROPOSES TO DIVISION: NORTHEAST EXCH.: 5647 REM. CD.: 005 PLACE A 2'x3' HANDHOLE AT END OF KILOVOLTS W C.: 4620 WO NO.: 9PF13TM CONTROL NUMBER: 028 CUSTOMER CONDUIT WHERE IT 0.00 TITLE: MDU TAX DST.: CROSSES VERIZON FIBER PJTUSE)BURTJT.E TWP: RNG.: x SEC.: SAL: XXX TO SERVE BLDG. AT DATE: 07/02/13 REV. DATE: SCALE: 1"=50.00' ® EXPOSED DRWN ENG APRVD PRINT 445 S. DENTON TAP. U�U'iIII"'i hod FILE: PERMIT GM GM 1 OF ONE