CF-Andrew Park 2-CN 950505
I HANGE '--o, ER ARCHITECT ORDER FIELD AIA DOCUMENT G701 OTHER PROJECT: Andrew Brown Park Phase 2 CHANGE ORDER NUMBER: THREE (name, address) 260 Parkway Blvd. DATE: May 5, 1995 TO CONTRACT~:ppell' Tx. 7501 9 ARCHITECT'S PROJECT NO: 911 65 (name, address) Rodman Excavation, Inc. CONTRACT DATE: December 20, 1 993 6831 Ash Street Frisco, Texas 75034 CONTRACT FOR: TheContmctischanged ~ ~llows: To Furnish And Install Excavation, Site Utilities And Concrete Parking Lot Adjacent To Existing Parking Lot. Per Plan By City Of Coppell Engineering Department Dated April 24, 1995. TOTAL ............ $166,245.00 Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum) (~uaranmed-Maxim~Priee~ was ........................ $ 8 5 9,3 41 . 0 0 Net change by previously autl=ionzed t, nange Orders ............................... $ 4 4,0 0 4.0 0 The (Contract Sum) (Gm~an. t~4il-Mm~num-l~ic-e) prior to this Change Order was .......... $ 9 0 3,3 4 5.0 0 The (Contract Sum) {C_~~Ma,xim~m-P;ic-e) will be (increased) (dec-r~ac, e4) (m'~ban~ed,) by this Change Order in the amount of ............................ $ 1 6 6,2 4 5 · 0 0 The new (Contract Sum) (G.um'~d-Ma~in~m~-~) including this Change Order will be . . $ 1 0 6 9,5 9 0 ° 0 0 The Contract Time will be (increased) ~:let-rtmsed~ (~nchang~l) by The date of Substantial Completion as of the date of this Change Order therefore is July I 5, 1 9 9 5 ( ) days. NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. CIT~ OF COP~ELL Rodman Excavation, Inc. City Of Coppell A.i~4.H.T-t~-~i~.. ~ ~ I ~ ~I::~Dy.) CONTRACTOR OWNER ~5~ ~~Y~L~. 6831 Ash Street 255 Parkway Blvd. Ad,ess T Addre~ Address ~P~. I~ ~0~ Frisc~ Texas 75034 Coppell, Te~s ~5019 S~ven M. Rollo, V.P. ~o~-;4oi-ton, ~48~or x DATE ~ - ~ -- F~ DA~u W Robert~ ~yoz Pro ,. CAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. ~JA DOCUMENT G701 · CHANGE ORDER · 1987 EDITION · AIA® · ©1987 · THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.. N.W., WASHINGTON. D.C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject ,. ,~gal prosecution. G701 --1987 May 16, 1995 MEMORANDUM To: From: Subject: Mayor & Council Jennifer Armstrong, Assistant Finance Director<~ Park Transfer The following is a detail of the original allocation of the $633,184.00 transfer from the General Fund. ?ro4ect Amount Tree Planting Grants 4th Ball Field Andrew Brown Trails Master Plan Andrew Brown - East Central Section Andrew Brown - West Allen Road Park Austin Elementary School Coppe11 Middle School - West Duck Pond Lakeside Elementary School Lee Elementary School Mockingbird/Coppell Middle School - East Pinkerton Unallocated $ 14,514.00 37,350.00 12,470.00 200,000.00 46,625.00 6,875.00 7,000.00 204,200.00 42,000.00 4,000.00 7,000.00 7,000.00 41,500.00 2,650.00 The revised allocation as of April 30, 1995 is as follows: Progect Amount Tree Planting Grants 4th Ball Field Andrew Brown Trails Master Plan Andrew Brown - East Central Section Andrew Brown - West Pinkerton Soccer Field Lighting CMS-West/Pinkerson Enclaves Unallocated $ 14,514.00 37,350.00 12,470.00 200,000.00 46,625.00 8,252.00 95,030.00 169,950.00 40,000.00 8,993.00 Funded Funded Funded Funded Funded Funded Funded Funded