CITY OF COPPELL, TEXAS
PROGRESS MEETING AGENDA
Coppell Road Paving, Drainage and Water Line Installation
September 22, 1999
2:00 PM
PROJECT ISSUES
A. Letters from Contractor, Other Issues from Pre-Constmction Meeting
B. Utility Conflicts/Relocations (TXU ElectricfrXU Gas/Paragon Cable/GTE)
C. Tree Marking and Removal
D. Project Surveying and Control Issues
E. Materials Supply Issues
F. Communications with Property Owners/Residents
G. Batch Plant Site, Material Spoil Site
SCHEDULE ISSUES
A. Work Phasing/Traffic Control
B. Project Schedule
C. Work Expected in Next Month
PUBLIC RELATIONS
UPCOMING CALENDAR EVENTS
A. Set Date for Regular Progress Meetings
B. Columbus Day: Monday, October 11, 1999
Se~t by: FREESE & NICHOLS 2149202565 09/27/99 9~IAB Job 458 Page 2/3
Simon W. I:ree.qe, ILE.
Marvin C. Nichols, P.E. 1806-1gt)9
FREESE- NICHOLS
Meeting Minutes
Project: Coppell Road Improvements
Project #ST98-0 I
Subject: Construction Meeting
Recorded by: Kevin Young
Date: September 22, 1999
Location: City or' Coppell Town Hall
Attendees: Larry Davis, Kent Collins, Mike Martin, Robert Weber, Gary Pryor, Bobby
lnmon, Kevin Young
The following is our understanding of the subject matter covered during the subject meeting.
If this differs from your understanding, please notify us withtn five working days.
Project Issues:
I. Bobby Inmon indicated that utility poles have been, or are presently being, relocated to avoid
co nstr uctio n.
2. Ed Bell wants to begin with the multi-box culvert and thc City concurs, il' traffic issues can
be worked out.
3. Other utility conflicts include gas line relocation to eight feet below the existing ditch grade
at the culvert location. Mr. lnmon confirmed that this has been done.
4, The City has TxDOT permits available in their office.
5. Kent Collins has begun marking trees along thc cast-west portion lbr removal. The City will
continue these efforts on Friday, 9/24 at 2:00 DM. Trees to be removed will he marked with
an orange "X". Letters to residents will be sent out by the City to give them an opportunity
to provide input regarding the marked trees. Once marked. Ed Bell needs two weeks to
coordinate tree toppers fi)r the tree remowll.
6. Survey control has been established. This should be finished on 9/22.
7. PVC supply is still the only material avaiability problem, according to Ed Bell. *Bell will
provide the City with written information including 3 suppliers and their PVC availability.
8. *Bell will contact the Home Owners' Association to establish an early relationship. There
are 4 to 5 IIOA's, according to Mr. Collins.
9. Bell has had no contact with the property owners, but plans on placing thc batch plant on ()ne
o1' the adjacent properties. Bell is awm'e that a TxDOT permit and city approval will be
needed for this activity.
i:RIEIr;,'.;E ANb N[¢:iII }I.S · I?,.tl W. M(X:KINGBIRI) I.ANI.:, SUI'II'; Z30-E · DALLAS, TEXA.',; 75247.4922 '13;.I.Fl'll(}Nt.'.: 214-92¢~-Z500 · FAX: Z14-O20-2n. 65 · I;¢)RM DAT[-'.:
Sent by: FREESE & NICHOLS 2149202565 09/27/99 ~5~2AM Job 458 Page 3/3
Meeting Minutes
Coppcll Road Improvements ST98-01
September 22, 1999
Page 2
Schedule Issues
10. *Regarding work phasing, the City needs specilics in writing from Ed Bell pertaining to
traffic flow and scheduling. Before road closures can occur, City internal effi, rts would need
to take place in the way of Council approval.
! l. There are no ch~mges to the project schedule.
12. Work expected in thc next month includes tree marking and removal, fence relocations and
property owner contacts by Ed Bell, utility relocations, and box culvert construction, il'
approved by City.
13. Ed Bell and Coppell Construction wish to construct the box culvert, as soon ms possible. *Ed
Bell will establish in writing how this activity will occur.
14. Traffic is a large City and resident concern with this project. GTE, the apartment complex,
several subdivisions, sanitation trucks, school buses, and emergency vehicles use this road
regularly. Accessibility is a sensitive issue.
15. 'I'ratT~c plans will have to be approved by City. Road closure will have to be approved by
council.. A major selling point wig be ease and speed in construction.
16. *Bell will provide the City with traffic options :for their review in a timely manet.
17. The City urges Bell to consider precast boxes across the roadway, to hasten construction.
Upcoming Calendar Events
18. Notice to proceed will be 9/22/99, and thc official start date will be 1{}/4/99.
*Action Items
- END -