Gateway Busn Pk 3CR Block 2DEVELOPMENT FEES
PROJECT NAME: Gateway Busn. Park Lot 3CR Block 2 (Prologis)
ENGINEER:Halff Associates
ORIGINATION DATE:7/18/2013
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$16,641.00
Wastewater Impact Fee$4,797.00
Park Fee$0.00
Roadway Impact-Zone$0.00
Street Sign
Street Light
Construction Inspection$2,000.60$2,000.60ra10/2/2013
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$250.00
Wastewater Tap Inspection$50.00
Water Meter (Domestic)$882.00
Water Meter (Fire/Irrig)$1,764.00
Meter Deposit (Domestic)$30.00
Meter Deposit (Fire/Irrig)$120.00
Utility Final Inspection$50.00
Subtotal to Eng.$2,000.60$2,000.60$0.00
Total FeesFees PaidAmount Owed
TOTALS
$26,584.60$2,000.60$24,584.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.
r
CASH /6/2 /13 096724
RECEIPT Date
Received From /r a O N �q'P '&X44 1-' (•-e A/77?-.4) a ro -
a 3 G iy Address �1/V Pk'ter 4d ? gLoc-k 2
V (1.111"N (Fitmeopnr-
et `f "A/ L G / Dollars$1.-,,p 4 O
(��
0 =— For /l� c `•
°
a rn
a
V N u ACCOUNT HOW PAID
T
":AMT OF CASH
m ACCOUNT
cc
0 AMT y1 i=0E1 CHECK 'z2- ��
BALANCE MONEY ORDER D BY
DUE CREDIT CARD O
l i MYCON GENERAL CONTRACTORS, INC. LANDMARK BANK 80-86 2 2
12
208 EAST LOUISIANA STREET,STE.200
McKINNEY,TEXAS 75069
General Contractors
Pay: ****************************************Two thousand dollars and 60 cents
DATE CHECK NO. AMOUNT
September 30, 2013 227312 $******2, 000. 60
CITY OF COPPELL
PAY
PAY UTILITY DEPARTMENT t
ORDER P.O. BOX 478 / 255 PARKWAY BLVD
AA
OF COPPELL, TX 75019 /
i
,
T H E - C l T Y • 0 F
COFFELL
„, t 4
o
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant r\yC R Q c Q C� a-Fate Submitted Ql
Address of Applicant �Q2 CGS - �v',5,0.nG , S��-�� v 1y"lk so
vi
1 S° i
Phone Number l\l a-5 a c1-a y ti y Fax Number °1 7 -5(0 2. -ococi
Location of Construction (address, if available): '1\ C`j ����y ��V, -ow e.\\ 15o\°I
Subdivision 1D0 vA,1 L.) ,ri 55Section# Block# 2 Lot# 3 C 2,
OR Survey/Abstract# ( y3 CA Acreage S, 6 Z GC t
Location description (attach vicinity map):
1. Type of proposed construction or development:
C Residential C' Alteration of a natural waterway drainage course
f" Non-Residential 4P'Other (describe & attach drawing or sketch)
( Placement of Fill (in right-of-way or on private property)
2. Description of Construction Permit requested:
wing ❑ Median or Landscape ❑ Box Culvert
❑ Sid walk g—fifer Main ❑ Rip Rap
Drive Approach IC.P. ❑ Fill Area
E -excavation Sanitary Sewer Main ❑ Drainage Channel Excavation
▪ ire Lane ❑ Flume ❑ Slope Protection/Retaining Wall
❑ Bridge [-inlet arking Lot
Provide an attachment containing the name and 24-hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance.
4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or
contract for the purpose of permit fee calculation verification.
5-;.0 - '07 o '/
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2
5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with
the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due: $ a,Ong'). (0 0 Date Paid: 10/2/ 3
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right-of-way not approved by the City Engineer.
>Any work requiring closure of a lane of traffic, street, or alley must be approved in
advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600 Street Department @ 972-462-5150
Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679
>Attach barricade plan / trench safety plan of a lane or street closure. (Required)
>It is a requirement of this permit that As-Built Drawings be turned in at the end of
this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a
CD with Autocad.dwg files.
NOTE:Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY
unless otherwise approved by City Engineer.
>A pre-construction meeting is required prior to beginning work related to this permit.
Contact the inspector assigned to your project to schedule the meeting.
Printing your name indicates your acceptance of the terms and conditions of this form:
Signature of Applicant Contact Number
WICK D`DELL 40-574--7707
Signature of Inspector Contact Number
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? C Yes C No
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required? C Yes C No
Are other federal, state, or local permits required? C Yes C No
C PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED
City Approval Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
T I N S - C I T Y . O F Page 3
coFFELL
Y ..,4 i ^ q
A5 . 1
INSPECTION FEE CALCULATION SHEET
Project Name --A-c ee oc C oc� ���c 1 Date -a, - 13
As per the City of Coppell Subdivision Regulations,the Developer shall pay 4%of the cost of the items to be permitted and inspected by
the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering
Department,but not dedicated to the City such as parking lots,private utilities,private drainage systems and so forth. Inspection fees are
due on or before the date of the Pre-construction Meeting.
In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with
completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following
improvements:
PUBLIC IMPROVEMENTS PRIVATE IMPROVEMENTS o
CONTRACT AMOUNT Xo CONTRACT AMOUNT X 2/o=
Paving
-r °v `l `e) (0c1 .-7 (o
Water `I 1 U.0 1 i(9ci`b. 'LLD
Sanitary Sewer
3 (D.?
Storm Sewer
s 7q(Q .`(p 9lS' el. 3
Alleys
Sidewalks} S / N
Other
Total Z pv . 100
Grand Total (total of
both colored fields) •( O v. (n 0
Submit by E-mail Print Form
081-IA Partners
COMMERCIAL CONCRETE ---
0
CO 9/26/2013 V1 e mail
Cr3
Mycon General Contractors
yoi., 208 E.Louisiana
14 McKinney Texas 75069
Phone:972-529-2444
Cl)
Attention: Scott Stoltz
Re: Freeport Corporate Center Building 7
Cl TAS Job#20668
▪ Subject Approach Values
Q Dear Mr.Stoltz:
In regards to the above project, three approaches are required. Two of these approaches are located on Gateway
11143 Boulevard and one is located on Exchange Circle. The value and size of the approaches are listed below as well as
a unit rate.
0
Lrj Square Footage-Approx.3,120 sj: Unit Rate per Square Foot-$2.72 Total Value-$8,488.00
t.3)
Sincerely,
TA.S.Commercial Cone te Construction,LLC
/
CO _
Chase Carter
Project Manager
TAS Commercial Concrete Construction,LLC.
19319 at Center Blvd Houston Texas 77073=PH-281230.7500`-F.AX:281.230,7664
2727 LBJ Freeway,Suite 1000 Dallas,Texas 75239 PH:214.905.9950.7,FAX.214.905 9992
www.tasconcrete.ccm
I it:A'A I
VENUS
C O N S T R U C T I O N
Utility Contractors since 1967
1426 S.Main-P.O.Box 90
Mansfield,TX 76063
Off.817-477-2050
Fax 817-473-9366
Venusconstruction.com
Date: 6/28/2013
Estimating lake rnceda@Venusconstruction.com
Addenda 1,2,
Attention:Estimator
Project Freeport Corporate Center Bldg.#7,Coppell TX
Bid
Plans Dated 6-17-13
Public Water @
1) 580 - 8"C-900 $23.29 If $ 13,508.20
2) @ $18.40 If $ 736.00
2) 40 - D6"ry Bore @ $276.96 If $ 14,678.88
3) 53 - Dry Bore V 14"Steel @ $3,549.57 ea $ 3,549.57
4) 1 - Connect tto @ $1,009.29 ea $ 1,009.29
5) 1 - Connect to 12"Stub Out @ $2,285.06 ea $ 4,570.12
6) 2 - 8H @ $13,213.13 ea $ 26,426.26
8) 3 - 8"VDC Vault- 8"Valve @ $1,120.45 ea $ 3,361.35
9) 2 3 @ $783.54 ea $ 1,567.08
1 2 - Fi Valve @ $424.85 ea $ 5,947.90
1 ) 14 - ittin @ $2,618.14 ea $ 7,854.42
111) 3 - 2"Water ter Servicer w!BF @ $567.00 ea $ 567.00
12) 1 - Traffic Control @ $1,134.00 ea $ 1.134.00
13) 1 - Trench Safety
Sub-Total Public Water $ 84,910.07
Public Sewer @ $ 1,835.40 ea $ 1,835.40
1) 1 - Connect to Sewer Stub Out Sub-Total Public Sewer $ 1,835.40
Public Storm Drain C @ $1,199.10 ea $ 1,199.10
1) 1 - Connect to X I�CB @ $1,199.10 ea $ 0
2) 3 - Connect to Curb Inlet 4,796.40
Sub-Total Public Storm Drain $
Sub Total Public Utilitites $ 91,541.87
Bonds $�6
Total Public Utilitites $ 94,288.13
Continued