Loading...
Gateway Busn Pk 3CR Block 2DEVELOPMENT FEES PROJECT NAME: Gateway Busn. Park Lot 3CR Block 2 (Prologis) ENGINEER:Halff Associates ORIGINATION DATE:7/18/2013 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$16,641.00 Wastewater Impact Fee$4,797.00 Park Fee$0.00 Roadway Impact-Zone$0.00 Street Sign Street Light Construction Inspection$2,000.60$2,000.60ra10/2/2013 EG or Bore Permit Overtime Inspection Water Tap Inspection$250.00 Wastewater Tap Inspection$50.00 Water Meter (Domestic)$882.00 Water Meter (Fire/Irrig)$1,764.00 Meter Deposit (Domestic)$30.00 Meter Deposit (Fire/Irrig)$120.00 Utility Final Inspection$50.00 Subtotal to Eng.$2,000.60$2,000.60$0.00 Total FeesFees PaidAmount Owed TOTALS $26,584.60$2,000.60$24,584.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. r CASH /6/2 /13 096724 RECEIPT Date Received From /r a O N �q'P '&X44 1-' (•-e A/77?-.4) a ro - a 3 G iy Address �1/V Pk'ter 4d ? gLoc-k 2 V (1.111"N (Fitmeopnr- et `f "A/ L G / Dollars$1.-,,p 4 O (�� 0 =— For /l� c `• ° a rn a V N u ACCOUNT HOW PAID T ":AMT OF CASH m ACCOUNT cc 0 AMT y1 i=0E1 CHECK 'z2- �� BALANCE MONEY ORDER D BY DUE CREDIT CARD O l i MYCON GENERAL CONTRACTORS, INC. LANDMARK BANK 80-86 2 2 12 208 EAST LOUISIANA STREET,STE.200 McKINNEY,TEXAS 75069 General Contractors Pay: ****************************************Two thousand dollars and 60 cents DATE CHECK NO. AMOUNT September 30, 2013 227312 $******2, 000. 60 CITY OF COPPELL PAY PAY UTILITY DEPARTMENT t ORDER P.O. BOX 478 / 255 PARKWAY BLVD AA OF COPPELL, TX 75019 / i , T H E - C l T Y • 0 F COFFELL „, t 4 o CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant r\yC R Q c Q C� a-Fate Submitted Ql Address of Applicant �Q2 CGS - �v',5,0.nG , S��-�� v 1y"lk so vi 1 S° i Phone Number l\l a-5 a c1-a y ti y Fax Number °1 7 -5(0 2. -ococi Location of Construction (address, if available): '1\ C`j ����y ��V, -ow e.\\ 15o\°I Subdivision 1D0 vA,1 L.) ,ri 55Section# Block# 2 Lot# 3 C 2, OR Survey/Abstract# ( y3 CA Acreage S, 6 Z GC t Location description (attach vicinity map): 1. Type of proposed construction or development: C Residential C' Alteration of a natural waterway drainage course f" Non-Residential 4P'Other (describe & attach drawing or sketch) ( Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: wing ❑ Median or Landscape ❑ Box Culvert ❑ Sid walk g—fifer Main ❑ Rip Rap Drive Approach IC.P. ❑ Fill Area E -excavation Sanitary Sewer Main ❑ Drainage Channel Excavation ▪ ire Lane ❑ Flume ❑ Slope Protection/Retaining Wall ❑ Bridge [-inlet arking Lot Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. 5-;.0 - '07 o '/ CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ a,Ong'). (0 0 Date Paid: 10/2/ 3 NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. >Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 >Attach barricade plan / trench safety plan of a lane or street closure. (Required) >It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE:Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. >A pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form: Signature of Applicant Contact Number WICK D`DELL 40-574--7707 Signature of Inspector Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? C Yes C No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C Yes C No Are other federal, state, or local permits required? C Yes C No C PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED City Approval Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T I N S - C I T Y . O F Page 3 coFFELL Y ..,4 i ^ q A5 . 1 INSPECTION FEE CALCULATION SHEET Project Name --A-c ee oc C oc� ���c 1 Date -a, - 13 As per the City of Coppell Subdivision Regulations,the Developer shall pay 4%of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department,but not dedicated to the City such as parking lots,private utilities,private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: PUBLIC IMPROVEMENTS PRIVATE IMPROVEMENTS o CONTRACT AMOUNT Xo CONTRACT AMOUNT X 2/o= Paving -r °v `l `e) (0c1 .-7 (o Water `I 1 U.0 1 i(9ci`b. 'LLD Sanitary Sewer 3 (D.? Storm Sewer s 7q(Q .`(p 9lS' el. 3 Alleys Sidewalks} S / N Other Total Z pv . 100 Grand Total (total of both colored fields) •( O v. (n 0 Submit by E-mail Print Form 081-IA Partners COMMERCIAL CONCRETE --- 0 CO 9/26/2013 V1 e mail Cr3 Mycon General Contractors yoi., 208 E.Louisiana 14 McKinney Texas 75069 Phone:972-529-2444 Cl) Attention: Scott Stoltz Re: Freeport Corporate Center Building 7 Cl TAS Job#20668 ▪ Subject Approach Values Q Dear Mr.Stoltz: In regards to the above project, three approaches are required. Two of these approaches are located on Gateway 11143 Boulevard and one is located on Exchange Circle. The value and size of the approaches are listed below as well as a unit rate. 0 Lrj Square Footage-Approx.3,120 sj: Unit Rate per Square Foot-$2.72 Total Value-$8,488.00 t.3) Sincerely, TA.S.Commercial Cone te Construction,LLC / CO _ Chase Carter Project Manager TAS Commercial Concrete Construction,LLC. 19319 at Center Blvd Houston Texas 77073=PH-281230.7500`-F.AX:281.230,7664 2727 LBJ Freeway,Suite 1000 Dallas,Texas 75239 PH:214.905.9950.7,FAX.214.905 9992 www.tasconcrete.ccm I it:A'A I VENUS C O N S T R U C T I O N Utility Contractors since 1967 1426 S.Main-P.O.Box 90 Mansfield,TX 76063 Off.817-477-2050 Fax 817-473-9366 Venusconstruction.com Date: 6/28/2013 Estimating lake rnceda@Venusconstruction.com Addenda 1,2, Attention:Estimator Project Freeport Corporate Center Bldg.#7,Coppell TX Bid Plans Dated 6-17-13 Public Water @ 1) 580 - 8"C-900 $23.29 If $ 13,508.20 2) @ $18.40 If $ 736.00 2) 40 - D6"ry Bore @ $276.96 If $ 14,678.88 3) 53 - Dry Bore V 14"Steel @ $3,549.57 ea $ 3,549.57 4) 1 - Connect tto @ $1,009.29 ea $ 1,009.29 5) 1 - Connect to 12"Stub Out @ $2,285.06 ea $ 4,570.12 6) 2 - 8H @ $13,213.13 ea $ 26,426.26 8) 3 - 8"VDC Vault- 8"Valve @ $1,120.45 ea $ 3,361.35 9) 2 3 @ $783.54 ea $ 1,567.08 1 2 - Fi Valve @ $424.85 ea $ 5,947.90 1 ) 14 - ittin @ $2,618.14 ea $ 7,854.42 111) 3 - 2"Water ter Servicer w!BF @ $567.00 ea $ 567.00 12) 1 - Traffic Control @ $1,134.00 ea $ 1.134.00 13) 1 - Trench Safety Sub-Total Public Water $ 84,910.07 Public Sewer @ $ 1,835.40 ea $ 1,835.40 1) 1 - Connect to Sewer Stub Out Sub-Total Public Sewer $ 1,835.40 Public Storm Drain C @ $1,199.10 ea $ 1,199.10 1) 1 - Connect to X I�CB @ $1,199.10 ea $ 0 2) 3 - Connect to Curb Inlet 4,796.40 Sub-Total Public Storm Drain $ Sub Total Public Utilitites $ 91,541.87 Bonds $�6 Total Public Utilitites $ 94,288.13 Continued