Loading...
DR12-01 Creekview Retaining Wall DEVELOPMENT FEES PROJECT NAME: DR 12-01 Creekview Dr Retaining Wall & Roadway Impv ENGINEER:Walter P. Moore ORIGINATION DATE:6/17/2013 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE 6/24/2013Overtime Inspection$216.00$216.00ra7/25/2013 7/22/2013Overtime Inspection$432.00$432.00ra8/7/2013 8/26/2013Overtime Inspection$216.00$216.00ra9/9/2013 10/21/2013Overtime Inspection$432.00$432.00ra11/19/2013 10/28/2013Overtime Inspection$216.00$216.00ra11/19/2013 Water Tap Inspection$0.00 Wastewater Tap Inspection$0.00 Water Meter (Domestic)$0.00 Water Meter (Fire/Irrig)$0.00 Meter Deposit (Domestic)$0.00 Meter Deposit (Fire/Irrig)$0.00 Utility Final Inspection$0.00 Subtotal to Eng.$1,512.00$1,512.00$0.00 Total FeesFees PaidAmount Owed TOTALS $1,512.00$1,512.00$0.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. T H E C 1 T Y O F COPPELL )„,2. F - o q X A 5 1 a October 28,2013 Rod Lacy The Fain Group 1616 N. Sylvania Ave Fort Worth TX 76116 RE: DR 12-01, Creekview Dr. Retaining Wall&Roadway Improvements Overtime Inspection Dear Mr. Lacy: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, October 19, 2013. The overtime rate including salary and benefits is $54.00 per hour. Four hours (4 hours) were charged to your company on that date. Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call(972)304-3679. Sincerely, L. avis Con• ction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 FAIN Building Relationships Constructing Futures P.O.Box 750 Fort Worth,TX 76101 817-927-4388 817-927-4389 Fax www.faingp.co n October 24, 2013 City of Coppell 255 Parkway Boulevard P.O.Box 9478 Coppell,TX 75019 ATTN: Larry Davis Office: 972.304.3684 Fax: 972.304.3570 Mr.Davis, - This letter is a request to work this Saturday, October 26,2013 on the Creekview Retaining Wall Project. Project No. DR 12-01 (weather permitting). The Fain Group is aware of the Inspector's fee of$54.00/HR with a minimum of 4 hours. Should you have any questions,please feel free to contact me at the number above or at my cell, 817.932.2515. Thank y. �- ' od Lacy The Fain Group ■ FAIN Building Relationships Constructing Futures P.O.Box 750 Fort Worth,TX 76101 817-927-4388 817-927-4389 Fax www.faingp.corn October 16,2013 City of Coppell 255 Parkway Boulevard P.O.Box 9478 Coppell,TX 75019 ATTN: Larry Davis Office: 972.304.3684 Fax: 972304.3570 Mr.Davis, This letter is a request to work this Saturday, October 19, 2013 on the Creekview Retaining Wall Project. Project No. DR 12-01 (weather permitting). The Fain Group is aware of the Inspector's fee of$54.00/HR with a minimum of 4 hours. Should you have any questions,please feel free to contact me at the number above or at my cell, 817.932.2515. Thank you, Ro• Lacy The Fain Group T H E C 1 T Y O F COPPELL T � o X A s 8 August 26, 2013 Rod Lacy The Fain Group 1616 N. Sylvania Ave Fort Worth TX 76116 RE: DR 12-01, Creekview Dr. Retaining Wall &Roadway Improvements Overtime Inspection Dear Mr. Lacy: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, August 24, 2013. The overtime rate including salary and benefits is$54.00 per hour. Four hours(4 hours)were charged to your company on that date. Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call (972) 304-3679. Sine 1 , L Davis Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 ■ FAIN Building Relationships Constructing Futures P.O.Box 750 Fort Worth,TX 76101 817-927-4388 817-927-4389 Fax www.fafngp.com August 22, 2013 City of Coppell 255 Parkway Boulevard P.O. Box 9478 Coppell,TX 75019 ATTN: Larry Davis Office: 972.304.3684 Fax: 972.304.3570 Mr. Davis, This letter is a request for Ark Contracting Services to work this Saturday, August 24, 2013 on the Creekview Retaining Wall Project. Project No. DR 12-01 (weather permitting). The Fain Group is aware of the Inspector's fee of$54.00/HR with a minimum of 4 hours. Should you have any questions,please feel free to contact me at the number above or at my cell, 817.932.2515. Thank you, 'odLacy The Fain Group T H E • C 1 T Y • O F COPPELL July 22,2013 Rod Lacy The Fain Group 1616 N. Sylvania Ave Fort Worth TX 76116 RE: DR 12-01, Creekview Dr. Retaining Wall&Roadway Improvements Overtime Inspection Dear Mr. Lacy: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, July 20, 2013. The overtime rate including salary and benefits is $54.00 per hour. Eight hours(8 hours)were charged to your company on that date. Please send a copy of this letter along with your check for $432.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell,TX 75019 If you should have any questions,please call (972) 304-3679. Sincere,,,, — -__-- ------- Ar • Davis X11: struction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 1107/17/2013 06:42 FAX 8179274389 FAIN 81001/001 ■ FAIN BuNrAng Aelaminpe Constructing Fume P,O.Box 750 fort Worth,TX 76101 81741274388 817.927.4389 Fa w ricrernazom July 17, 2013 City of Coppell 255 Parkway Boulevard P.O. Box 9478 Coppell, TX 75019 ATTN: Larry Davis Office: 972.304.3684 Fax: 972.304.3570 Mr. Davis, This letter is a request to work this Saturday,July 20, 2013 on the Creekview Retaining Wall Project_ Project No. DR 12-01 (weather permitting). The Fain Group is aware of the Inspector's fee of$54.00/HR with a minimum of 4 hours. Should you have any questions,please feel free to contact me at the number above or at my cell, 817.932.2515. Thank you, Rd Lay The Fain Group OVERTIME WORKSHEET Date 7J?A )?e972 Name Address City/State/Zip RE: Creek. /ea/ PP/ Dear • In accordance with your request, inspection service was provided by the City of Coppell Engineering Dept. at the referenced location on Saturday,7 0 , 200? 20f 3 Sunday, , 2007 The overtime rate including salary and benefits is $54.00 per hour, with a minimum charge of four hours. g hours were charged to your company on that date. Please send a check for $ payable to the City of Coppell to the following address: City of Coppell Finance Dept. PO Box 9478 255 Parkway Blvd. Coppell, TX 75019 If you have any questions, please contact me at 972/304-3684. Sincerely, Larry Davis Construction Inspector T H • C I T cÔmiL _ * 9 A 8 1 6 June 24,2013 Rod Lacy The Fain Group PO Box 750 Fort Worth TX 76101 RE: Creekview Dr. Retaining Wall &Roadway Improvements Project DR 12-01 Overtime Inspection Invoice Dear Mr. Lacy: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, June 22, 2013. The overtime rate including salary and benefits is $54.00 per hour. Four hours(4 hrs.)were charged to your company on that date. Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call (972) 304-3679. Sincerel L,�Pa1's Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 106/19/2013 11 : 12 FAX 8179274389 FAIN Z001/001 ■ FAIN — BullGhg R l dosshlps Conauuucdno Futures P.O,9ot 750 Fort Worth,TX 76101 e17s9274.7ee 817-927-4389 Fa ww.(aInge.com June 19, 2013 City of Coppell 255 Parkway Boulevard P.O.Box 9478 Coppell,TX 75019 ATTN: Larry Davis Office: 972.304.3684 Fax: 972.304.3570 Mr. Davis, This letter is a request to work this Saturday, June 22, 2013 on the Creekview Retaining Wall Project. Project No. DR 12-01 The Fain Group is aware of the Inspector's fee of$54.00/HR with a minimum of 4 hours. Should you have any questions,please feel free to contact me at the number above or at my cell, 817.932.2515.2 yThank ou 2 J od Lacy ~ The Fain Group is OVERTIME WORKSHEET yr Date b (2i ) ze( - Name Address City/State/Zip RE: ✓�� ' • Dear In accordance with your request, inspection service was provided by the City of Coppell Engineering Dept. at the referenced location on 2 )3 Saturday:3;14 g 22. ,44E6" Sun , The overtime rate including salary and benefits is $40.00 per hour, with a minimum charge of four hours. hours were charged to your company on that date. Please send a check for $ payable to the City of Coppell to the following address: City of Coppell Finance Dept. Attn: Jennifer Armstrong PO Box 9478 Coppell, TX 75019 If you have any questions, please contact me at 972/304-3684. Sincerely, Larry Davis Construction Inspector