Loading...
DR1201-LR130718 JUL-18-2013 03:49 P.01 4T Texas CMT, Inc. Construction Materials Testing GEE COflSU Itants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com ANCHOR OBSERVATION REPORT Report Date: July 18,2013 Observation Date: July 12,2013 Client: City of Coppell Report No. 1 Project: Creekview Drive Roadway Improvements,Coppell,TX 75019 Identification: Passive Anchor Drilling Project Number: 213-0134 • Method of Test: Visual.Observation Page: 1 of 1 Anchor Depth to Shaft Required Actual Total Bearing Casing Remarks No./ Size Bearing Penetration Penetration Depth Material Depth Location Strata IF 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water** 1G 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water** 11-1 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water** 11 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water** 1 C 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA See Note Below* * Passive anchors 1C drilled to about 15 feet prior to this date and not grouted.Drilling was completed to 25 feet and grouted with Lyon Non-Shrink Grout on July 12,2013. ** Green PVC section fitted at the top portion of hole to help reduce potential for caving. cc: Mr. Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com Mr. Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com Mr.Mark North-ARK Contracting,Phone:817-478-7400;via E-mail:mnorth @arkcontractingservices.com b ,1i' I Texas CMT,Inc. TBPE Firm: F-4521 Reviewed �...,i All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT, . . le us of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. Post-it®Fax Note n )767 Date paggeesll►n t�, To( RR Y ,1� 114 V I S From r&-ms c+v 1-)LA it,, Co./Dept.E!vG6e sT . Co.6Ec coNColLT. 1/��, Phone# 9-7 ...3a4 Phone#z�4;� 01 C�'7 Fax# - \7L^30Ji _35-70 Fax# zi#3SZ—'Ftl97Z JUL-18-2013 03:49 P.02 A -, + , . Texas CMT, Inc. Construction Materials Testing GEE Consultants, Inc. 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com ANCHOR OBSERVATION REPORT Report Date: July 18,2013 Observation Date: July 13,2013 Client: City of Coppell Report No. 2 Project: Creekview Drive Roadway Improvements,Coppell,TX 75019 Identification: Passive Anchor Drilling Project Number: 213-0134 Method of Test Visual Observation Page: 1 of 1 • Anchor Depth to Shaft Required Actual Total Bearing Casing No./ Bearing Penetration Penetration Depth Material Depth Remarks Size Location Strata 1J 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA See Note Below* 1K 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water 1L 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water 1M 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Filled with Water IN 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA 10 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA 1P 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA 1Q 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA IR 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA 1S 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA . * Passive anchors lJ drilling completed prior to arrival on site at 8:02AM on this date.Anchor 1J excavation was full of water.Green PVC section fitted at the top portion of hole to help reduce potential for caving. cc: Mr. Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr. George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com Mr.Mark North-ARK Contracting,Phone:817-478-7400;via E-mail:mnorth @arkcontractingservices.com Texas CMT,Inc. TBPE Firm: F-4521 Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CM , . The us o ame must recei • our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.02