DR1201-CR130712 T H E • C I T Y • O F
COPPELL
2
x A s t
DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING ?/f 2 r?' 1
WALL&ROADWAY DATE ! Y/REPORT#
IMPROVEMENTS
DAY M � T W IT S IS
PROJECT NO. DR 12-01
WEATHER SUN _ OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 - 85 d Y
WIND Still Mod Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
De/ 10 9 ✓i/1/X g X71, •-s M creel- 6D iiL4-
7,410
SIGNATURE
ENGINEERING INSPECTOR