DR1201-CR130715 T H E • C 1 T Y • O F
COPPELL
A s ' a 9 DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING '"7// bra/�j
WALL&ROADWAY DATE ``i CJ'r� "REPORT#
IMPROVEMENTS
DAY FT W IT IF IS IS
PROJECT NO. DR 12-01
WEATHER SUN CLEAR OV IZy�s� ' SNOW
OWNER: CITY of COPPELL TEMP To 32-50 50-70 85 up
CONTRACTOR: FAIN GROUP WIND Mod High Overtime Form
HUMIDITY Dry Mod (Hut / Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
ger/yf dk`r /A ‘ae te��jp�I,e -i-e}
/ya GUI�y`` j c�fly
/ SIGNATURE
ENGINEERING INSPECTOR