DR1201-CR130716 T H E C 1 T Y O F
COPPELL
A 6 ' DAILY CONSTRUCTION REPORT
PROJECT: WAL&ROADWAY RETAINING DATE 7/ ( ?a13 REPORT#
IMPROVEMENTS
DAY IM Q7IW T IF S
PROJECT NO. DR 12-01
WEATHER SUN CLEAR SNOW
OWNER: CITY of COPPELL TEMP 32-50 50-70 �i ' as up
CONTRACTOR: FAIN GROUP WIND Mod High Overtime Submitted'Form
HUMIDITY Dry Mod 'I Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Gelv64-- Rceivl "at-
SIGNATURE
ENGINEERING INSPECTOR