Loading...
Townhomes Ph 2-PT130726 T N t - C I T Y O f COPPELL EARLY GRADING/EXCAVATION PERMIT IN RIGHT-OF-WAY/EASEMENT/PRIVATE PROPERTY City Contractor ..7 `� i 3 L Date: / M i( ❑ Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) ❑ Ni Tree Removal Permit from Parks&Recreation Dept.required. ❑ [( Hold Harmless Letter from the Property Owner/Engineer/Developer is attached. Project Name/Location: MC/i Y1 J ' 6' P ha Z General Contractor: v4IZ T Permit issued to Company/Representative: Jam,i.. y .ok.J Address: Ro. ay, 1saa4.. (tuP.s T ( - 7(ro S Telephone#:4317)Qa,:gent p Emergency Telephone#: Gj!�Q?by- G 3) General Description of work(provide copy of approved plans): 'Was contact made with City and/or Utility Companies to locate existing utilities? if NO,Reason: Oes C•No 'Was contact made with Parks&Recreation Dept.concerning Tree Removal Permit? if NO,Reason: 'es No As removal of existing street,alleys,or sidewalks necessary? C Yes ccillo if YES,Attach Bore/Street Cut/Saw Cut Permit 'Is Floodplain Permit required? C Yes O if YES,Permit# or date of City Council variance Early Grading/Excavation Permit Page 2 Representative(s)of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work(grading,drainage,vegetation,and erosion control). Any work requiring closing of a lane of traffic,street,or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 Attach barricade plan/trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. %A 2%inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) &,645.4 �► Amount Paid$ £(p Lf3 Coo' • Date Paid 1 ?A, l (1.3 ❖City inspector must be notified 24 hours prior to beginning work related to this permit. Printing your name indicates your acceptance of the terms and conditions of this form: 1.(nZ� 5' atur Applican ntractor Rep. Date L rink (Z-67 Signature o��`ty Engineer Date Za- a0eeL GUS City Inspector for this project Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim,demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure,blocking,excavating,cutting,tunneling, or other work by the applicant under permit from the City,if such permit is granted. CONaSTRUCTIC)N at EQUX JV1EN IT c INC. srreutrt?IfK - EXCAVATION lJl R t,H5TIES Date: July 12,2013 Attention: Bobby Stewart,CSE Commercial Real Estate Project: Old Town(Main Street) City: Grapevine,Tx. Engineer: Glenn Engineering Corp. Plan Date: Addenda: KART Construction&Equipment Co.,Inc.qualifies as a SDVOSB(Service Disabled Veteran Owned Small Business), and is fully insured and bondable. Our proposal is to include the following items as specifically listed,any other work or material is excluded. 1aaYM :% :Z&r.,��`x.^.�"`�MiYa..ti ji.Z;,.,,7,'�s� tr��.y��.����':�P'•` ��, TM,.;:s b�w:;: ' Clearing and Grubbing AC 8.00 2,800.00 $ 22,400.00 Construction Entrance EA 1.00 1,500.00 $ 1,500.00 Excavation CY 3,500.00 2.75 $ 9,625.00 Place Fill Material Furnished by Others CY 5,500.00 1.50 $ 8,250.00 Lot Benching(Final and Rough) LOT 64.00 225.00 $ 14,400.00 Moisture Conditioning Lots'5Ft.Deep(Per Geotechnical Report) CY 37,952.00 2.50 $ 94,880.00 Install Poly Cap on Lots(Per Geotechnical Report) LOT 64.00 500.00 $ 32,000.00 Sawcut and Remove Curd For Approaches LS 1,200.00 1.00 $ 1,200.00 Placement of Pipe Spoils CY Unknown 1.50 $ - Regrading of Streets SY 6,433.00 0.50 $ 3,216.50 Backfill Curb after Paving LS 1.00 4,800.00 $ 4,800.00 TOTAL $ 192,271.50 Specific Exclusions Construction Staking Compaction or Geotech Testing Cost Inspection Fees Haul Off of Spoils/Debris Created By Others Fine Grading For Sidewalks or Flatwork Traffic Control or Barricades For Other Trades Stabilized Subgrade For Sidewalks/Flatwork Hydro-Mulch,Seed or Sod(Other Than Scope Items) Structural Excavation or Backfill Asbestos Survey/Abatement Contaminated/Hazardous Material Sleeves!Conduit For Other Trades Tree Protection Requirement for Site to Balance(No Haul in or off of Additions of poly sheeting to lots will stay at quoted price materials other than those quoted. This proposal and pricing will remain firm for thirty days from the bid date.If work does not commence within thirty days,an adjustment for fuel and/or material may be necessary. Respectfully Submitted B��/J QS-' Clay Drewry,Estimator / Kart Construction&Equip Co.,Inc. (817) 282-8000 Office (940) 210-1860 Cell Cdrewrvakertcoinc.corr1 124 S.Norwood/PO Box 1522-Hws-4 7X 75053-Offce:(817)282-8000 Fac(817)282-8005 r CASH 7//,7 6///--3 096707 RECEIPT Date Received.'From', a= � Address l43/ Dollars$/(/4c`l�x 0V >~cu z U - ?, �`f���: Q-ti �l�L N For V �V / °</3/19 60 O/ ACCOUNT HOW PAID AMT OF CASH..... ,- ACCOUNT - - U AML PAID.e//�.L/l�I/.3' CHECK O�-/ BALANCE (J4/''„�✓MONEY ORDER❑ By DUE ;:CREDIT CARD 0 •1 S COPPeeli 2, 1-4 no roe--y ,1,04 • 7/7 6/j a 32-104/1110 'w--4-&45[2-1-ke- Ctt--y 6C Copoe,I1 1 $ /6 .84fs.e t,,t rr IA-"r H0145 t(�r{i 14L b?ti)RT li 6' �17o ,• Dotal.On II N 1,V 0 0 Back NATIONAL:DANK DALLAS,TX: & G (i . e.ir►14 >: /RAE •T ----- ` Appendix I Tree Removal Permit Application TREE REMOVAL PERMIT APPLICATION City of Coppell, Texas Date: -✓u/y .2S; 2013 Permit number: / (Issued by City upon approval) Property Location: E,457- SIDE S. 6oP:ELC. ,efr Hvusrao 7R VL5 Applicant Name:________ Address: 'H 5t' /J. b/C0/44.Io e _ 7i7- 75062 Phone: zko 9- 40-0101 — — Property Owner Name:___ Contractor: TREE LOCATION/ID# SIZE (DBH) SPECIES REASON FOR REMOVAL Attach additional sheets as necessary. This application must be accompanied by a Plan or Preliminary Plat of the site. Proposed new development must attach a Tree Survey. I understand this application is subject to all rules and regulations pertaining to Section 34-11 of the Zoning Ordinance Code Book of the City of Coppell, Texas. ,.,9 L , Applicant Signature: („/'�� 1 For Staff Use Only Approved/Disapproved By: _ Date:Comments: Fee Paid:___ ____ Receipt No. Appendix K DETERMINATION of RETRIBUTION CREDITS Non-Residential Property GROSS RETRIBUTION 4127 inches (DBH) minus (-) PRESERVATION CREDIT: Trees Preserved on Site /�' inches (DBH) divided by (%) Total Trees on Site 4g inches (DBH) equals (=) Preservation Percentage /.4 times (x) Gross Retribution 47 inches (DBH) equals (=) PRESERVATION CREDIT 36,7 inches (DBH) minus (-) LANDSCAPING CREDIT 237 inches (DBH) equals (=) NET RETRIBUTION 130 inches (DBH) times (x) $100.00 x $100.00 equals(-) CONTRIBUTION to CITY of COPPELL REFORESTATION and NATURAL AREAS FUND $ 1310017 (Ord. No. 91500-A-203)