Loading...
Townhomes Ph 2 DEVELOPMENT FEES PROJECT NAME: Old Town (Main Street) Townhomes, Phase 2 ENGINEER:Glenn Engineering ORIGINATION DATE:7/26/2013 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$63,594.00 Wastewater Impact Fee$57,600.00 Park Fee$82,240.00$82,240.00ra8/27/2013 Roadway Impact-Zone$40,704.00$40,704.00ra8/27/2013 Street Sign Street Light Construction Inspection$19,574.16$19,574.16ra9/23/2013 4%Paving Only$13,222.85$13,222.85ra11/18/2013 Early Grading Permit$3,845.43$3,845.43ra7/26/2013 Overtime Inspection Water Tap Inspection$3,300.00 Wastewater Tap Inspection$3,200.00 Water Meter (Domestic)$11,424.00 Water Meter (Fire/Irrig)$1,344.00 Meter Deposit (Domestic)$1,920.00 Meter Deposit (Fire/Irrig)$60.00 Utility Final Inspection$3,200.00 Subtotal to Eng.$159,586.44$159,586.44$0.00 Total FeesFees PaidAmount Owed TOTALS $305,228.44$159,586.44$145,642.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Y7/26/2013Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. 1 P CASH /i 3 RECEIPT ASDate i (1) ®g 7 a� s-rge er etiPPE LL- L.TD Received From DN Lsp T6 Ws HtMc5 (PAVIiJC-d ,o, Address I>HAS % 222' r O. Dollars$ J^ (.2 CO 7O 7.) For 6-0 fISTrut.e....T{ oµ I H SD�LT( r�N _ V 18 ACCOUNT HOW PAID AMT OF CASH ACCOUNT 1 Q U AMT' ' t'1'2 2, 8 S, CHECK I O L B BALANCE MONEY ORDER❑ Y DUE ,,. CREDIT CARCO INWOOD NATIONAL BANK 1026..., DALLAS,TX 214/358-5281 32-104/1110 MAIN STREET COPPELL 2, LTD 4956 N.O'CONNOR ROAD IRVING,TX 75062-2716 11/15/2013 ORDERTHE F City of Coppell I $ **13,222.85 Thirteen Thousand Two Hundred Twenty-Two and 85/100************************************************************** DOLLARS City of Coppell 255 Parkway Blvd. Coppell, TX 75019 MEMO MSC2 -Paving Permit ApplicationIII ' L4iti-' MAIN STREET COPPELL 2,LTD 1 026 City of Coppell 11/15/2013 Date Type Reference Original Amt. Balance Due Discount Payment 11/15/2013 Bill 111813 13,222.85 13,222.85 13,222.85 Check Amount 13,222.85 1010 Inwood-Operat MSC2-Paving Permit Application 13,222.85 1_ CASH 9/2g/I 3 096721 RECEIPT Date l _ o rn Received From � _S � r L � L �. )' a § Address OLD 7v aid c PP u b w 41-bM 43, 7'A se 2- Vmd Q Dollars$// r ' I/> co �/ l O _ ^ For a 412.et 4-7o am N ACCOUNT HOW PAID AMT:Of ; ACCOUNT CASH f 14 I C AMT.PA( I 57I/,./1L 2 CHECK /O/f/: BALANCE MONerorwrR❑ By - 9UE,. ... CREUYT:CARD❑, ,.- � '���.. ,. .. ._.. - °.�► I INWOOD NATIONAL BANK 1011 DALLAS,TX 214/358-5281 32-104/1110 MAIN STREET COPPELL 2, LTD 4956 N.O'CONNOR ROAD IRVING,TX 75062-2716 9/13/2013 PAY TO THE ORDER OF City of Coppell I $ **19,574.16 Nineteen Thousand Five Hundred Seventy-Four and 16/100***********************************************"************ f DOLLARS City of Coppell 255 Parkway Blvd. Coppell, TX 75019 MEMO G LOd4/" Main Street Coppell 2-Public Utility Inspection Fee AUl"HORIZED SIGNATURE MAIN STREET COPPELL 2,LTD 1011 City of Coppell 9/13/2013 Public Utility Inspection Fee 19,574.16 1010 Inwood-Operat Main Street Coppell 2-Public Utility Inspection F 19,574.16 I- CASH Date x'2711 t3 096714 RECEIPT . ZI LTA 114/N S rR e T C 6?PE LL Received From PL 0.142 Address i `� O m N Dollars$1l21gt� czt O =N For (/ 8 a ACCOUNT HOW PAID ACOUN _ CASH m ACCOUNT U AMT / 2 ('7 7 /ya CHECK " 4:2_ - BALANCE MONEY ORDER D By DUE CREDIT CARED THIS DOCUMENT HAS A VOID COLORED BACKGROUND AND A MICROPRINT BORDER AND SIGNATURE LINE. \JOTI TO C 1S 0 R = T T OT �Tr ov P � vOFF � H 'O T Sf L;I L.TEn 0010 PURCHASER TQ.. IIJ._T N :=;T6�:FT i:I'IF'F'FLI 7 L, DATE Hl t t ,> , _ 2017. 32-104/1110 PAY TO THE ORDER OF toiT -D Ut.IFPELL *122 944 I_Ift:#: f ry�ppny�ryp fop p�{y��+qp 7lyp w■q m�11 CIO EXb"1 e: tl IL. 4 Yom: ..ft 2 5!011 .J4G I�nX'4a..tr/smn "9a�Y OC .m.y NATIONAL BANK Dallas,Texas 75209 • 214-358-5281 (5)'119> CASHFER'S CH ECG _ < _ v Authorized;S6nature T H E C I T Y O F COPPELL ..� , * r F � 'a A 8 1 August 16, 2013 Mike Glenn, P.E. Glenn Engineering 105 Decker Ct. Suite 290 Irving, Tx 75062 RE: Old Town Ph. 2 Fee Assessment Letter Dear Mr. Glenn, Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $122,944.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael Garza, P.E. Civil Engineer cc: Jennifer Miller, Finance Director Ashley Owens,Administrative Technician, Building Inspections Glenn Hollowell, Public Works Manager Tim Oates,Deputy Chief/Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Old Town(main st.)Phase 2 Date: 7/18/2013 rev(8/16/2013) TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $63,594.00 (100%due at Issuance of Building Permit) Water Tap Inspection Fee $3,300.00 (100%due at Issuance of Water Meter) Water Meter Fee (Domestic) $11,424.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,344.00 (100% due at Issuance of Water Meter) Water Meter Deposit(Domestic) $1,920.00 (100%due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $57,600.00 (100%due at Issuance of Building Permit) Wastewater Tap Inspection Fee $3,200.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $3,200.00 (100%due at Issuance of Building Permit) Park Fee $82,240.00 $82,240.00 (100%due prior to Filing Plat) Roadway Impact Fee $40,704.00 $40,704.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100%due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100%due prior to Start of Construction) II TOTAL $268,586.00 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $122,944.00 DEVELOPMENT FEE WORKSHEET PROJECT: Old Town(main st.)Phase 2 DATE: 7/18/2013 rev(8/16/2013) Water Impact Fee: Domestic Meter(s): 64 -5/8 inch X 3/4 inch = 64 ESU's Irrigation Meter(s): 2 - 1 1/2 inch = 6.66 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total#: 70.66 ESU's @$900.00 ea. $63,594.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total#: 66 Connections @$50.00 ea. $3,300.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 64 Domestic Meter(s) @ $178.50 $11,424.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total#: 2 Irrigation Meter(s) @ $672.00 $1,344.00 Total#: 0 Additional Irrigation Meter(s)@ $0.00 $0.00 Total#: 0 Fireline Meter(s) @ $0.00 meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 64 Meter(s)@$30.00 ea. $1,920.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total#: 2 Meter(s) @$30.00 ea. $60.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 64 @$900.00 ea. $57,600.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 64 Connections @$50.00 ea. $3,200.00 (100%due prior to issuance of building permit) Utility Final Inspection Fee(All developments): Total#:, 64 Lots @$50.00 ea. $3,200.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee(For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone : Zone 1 64 Single-family @ $1,285.00 per lot $82,240.00 0 Multi-family @ $1,285.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $40,704.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100%due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2%of development cost required for private improvements) (4%of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Old Town(main st.)Phase 2 DATE: 7/18/2013 rev(8/16/2013) ROADWAY IMPACT FEE: Service Area * 1 Category** Residential Land Use** Residential(Medium/Low) No.Lots/Units 64 Development Units ** 64.00 Vehicle Miles per Development Unit** 4.24 Fee per Vehicle Mile*** $150 Roadway Impact Fee due=(Development Units)x ;(Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $40,704.00 *(Figure 4.1 -Roadway Impact Fee Study) **(Table 4.10-Roadway Impact Fee Study) *** (Schedule 2,Page 3 -The Master Fee Schedule) $40;104:00:; r CASH 7//,7 6///--3 096707 RECEIPT Date Received.'From', a= � Address l43/ Dollars$/(/4c`l�x 0V >~cu z U - ?, �`f���: Q-ti �l�L N For V �V / °</3/19 60 O/ ACCOUNT HOW PAID AMT OF CASH..... ,- ACCOUNT - - U AML PAID.e//�.L/l�I/.3' CHECK O�-/ BALANCE (J4/''„�✓MONEY ORDER❑ By DUE ;:CREDIT CARD 0 •1 S COPPeeli 2, 1-4 no roe--y ,1,04 • 7/7 6/j a 32-104/1110 'w--4-&45[2-1-ke- Ctt--y 6C Copoe,I1 1 $ /6 .84fs.e t,,t rr IA-"r H0145 t(�r{i 14L b?ti)RT li 6' �17o ,• Dotal.On II N 1,V 0 0 Back NATIONAL:DANK DALLAS,TX: & G (i . e.ir►14 >: /RAE •T ----- ` T N t - C I T Y O f COPPELL EARLY GRADING/EXCAVATION PERMIT IN RIGHT-OF-WAY/EASEMENT/PRIVATE PROPERTY City Contractor ..7 `� i 3 L Date: / M i( ❑ Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) ❑ Ni Tree Removal Permit from Parks&Recreation Dept.required. ❑ [( Hold Harmless Letter from the Property Owner/Engineer/Developer is attached. Project Name/Location: MC/i Y1 J ' 6' P ha Z General Contractor: v4IZ T Permit issued to Company/Representative: Jam,i.. y .ok.J Address: Ro. ay, 1saa4.. (tuP.s T ( - 7(ro S Telephone#:4317)Qa,:gent p Emergency Telephone#: Gj!�Q?by- G 3) General Description of work(provide copy of approved plans): 'Was contact made with City and/or Utility Companies to locate existing utilities? if NO,Reason: Oes C•No 'Was contact made with Parks&Recreation Dept.concerning Tree Removal Permit? if NO,Reason: 'es No As removal of existing street,alleys,or sidewalks necessary? C Yes ccillo if YES,Attach Bore/Street Cut/Saw Cut Permit 'Is Floodplain Permit required? C Yes O if YES,Permit# or date of City Council variance Early Grading/Excavation Permit Page 2 Representative(s)of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work(grading,drainage,vegetation,and erosion control). Any work requiring closing of a lane of traffic,street,or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 Attach barricade plan/trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m.until 3:30 p.m.ONLY unless otherwise approved by City Engineer. %A 2%inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) &,645.4 �► Amount Paid$ £(p Lf3 Coo' • Date Paid 1 ?A, l (1.3 ❖City inspector must be notified 24 hours prior to beginning work related to this permit. Printing your name indicates your acceptance of the terms and conditions of this form: 1.(nZ� 5' atur Applican ntractor Rep. Date L rink (Z-67 Signature o��`ty Engineer Date Za- a0eeL GUS City Inspector for this project Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim,demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure,blocking,excavating,cutting,tunneling, or other work by the applicant under permit from the City,if such permit is granted. CONaSTRUCTIC)N at EQUX JV1EN IT c INC. srreutrt?IfK - EXCAVATION lJl R t,H5TIES Date: July 12,2013 Attention: Bobby Stewart,CSE Commercial Real Estate Project: Old Town(Main Street) City: Grapevine,Tx. Engineer: Glenn Engineering Corp. Plan Date: Addenda: KART Construction&Equipment Co.,Inc.qualifies as a SDVOSB(Service Disabled Veteran Owned Small Business), and is fully insured and bondable. Our proposal is to include the following items as specifically listed,any other work or material is excluded. 1aaYM :% :Z&r.,��`x.^.�"`�MiYa..ti ji.Z;,.,,7,'�s� tr��.y��.����':�P'•` ��, TM,.;:s b�w:;: ' Clearing and Grubbing AC 8.00 2,800.00 $ 22,400.00 Construction Entrance EA 1.00 1,500.00 $ 1,500.00 Excavation CY 3,500.00 2.75 $ 9,625.00 Place Fill Material Furnished by Others CY 5,500.00 1.50 $ 8,250.00 Lot Benching(Final and Rough) LOT 64.00 225.00 $ 14,400.00 Moisture Conditioning Lots'5Ft.Deep(Per Geotechnical Report) CY 37,952.00 2.50 $ 94,880.00 Install Poly Cap on Lots(Per Geotechnical Report) LOT 64.00 500.00 $ 32,000.00 Sawcut and Remove Curd For Approaches LS 1,200.00 1.00 $ 1,200.00 Placement of Pipe Spoils CY Unknown 1.50 $ - Regrading of Streets SY 6,433.00 0.50 $ 3,216.50 Backfill Curb after Paving LS 1.00 4,800.00 $ 4,800.00 TOTAL $ 192,271.50 Specific Exclusions Construction Staking Compaction or Geotech Testing Cost Inspection Fees Haul Off of Spoils/Debris Created By Others Fine Grading For Sidewalks or Flatwork Traffic Control or Barricades For Other Trades Stabilized Subgrade For Sidewalks/Flatwork Hydro-Mulch,Seed or Sod(Other Than Scope Items) Structural Excavation or Backfill Asbestos Survey/Abatement Contaminated/Hazardous Material Sleeves!Conduit For Other Trades Tree Protection Requirement for Site to Balance(No Haul in or off of Additions of poly sheeting to lots will stay at quoted price materials other than those quoted. This proposal and pricing will remain firm for thirty days from the bid date.If work does not commence within thirty days,an adjustment for fuel and/or material may be necessary. Respectfully Submitted B��/J QS-' Clay Drewry,Estimator / Kart Construction&Equip Co.,Inc. (817) 282-8000 Office (940) 210-1860 Cell Cdrewrvakertcoinc.corr1 124 S.Norwood/PO Box 1522-Hws-4 7X 75053-Offce:(817)282-8000 Fac(817)282-8005