Loading...
DR1201-LR130724 JUL-25-2013 02:21 P.01 AYA Texas CMT, Inc. Construction Materials Testing (FF Cnnu &Itante I nt-- .. and Environmental Consulting Post-it's Fax Note 7671 Date pages► 10044 Monroe Drive • Dallas, Texas 75229 • (214) : To l ,fRRY bfi-V S From jam c 7 c-�T� wc. Co./Dept.EN c6t J-l4.51 p, Co.G€6 cws co i-r T4,46 Phone# 9-7 2 3o434 Phone#z 1/I. 7c`,_6/57 C^7 ANCHOR OBSERVATION REPORT Fax# cZ2 304 5-70 Fax# ' 4 � -3cz- 64177-- Report Date: July 24,2013 Observation Date: July 19,2013 Client: City of Coppell Report No. 3 Project: Creekview Drive Roadway Improvements,Coppell,TX 75019 Identification: Passive Anchor Drilling Project Number: 213-0134 Method of Test: Visual Observation Page: 1 of 1 . Anchor Depth to No./ Shaft Required Actual Total Bearing Casing Bearing Remarks Location Size Strata Penetration Penetration Depth Material Depth 1T* 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1U* 10" 0'0" . 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole IV* 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1W 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1X 10" 0'0" 25' 25' 25'0" ' Dark Gray Shale NA Water'at bottom of hole IY 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1Z 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1AA 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1AB 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole LAC 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole lAD 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1AE 1.0" 0'0" 25' 25' 25'0" Dark Gray Shale NA *Note: Anchor drilling observation was scheduled for 10:00 AM.However,on arrival at site at 10:00 AM, it was found that drilling had already been completed for anchors 1T, lU and 1V. I)4..cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:9, ;•-3570 , Mr.George Marshall-City of Coppell,Phone:972-304-3562;vi./-, gMarshall oppelltx.gov Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-01:� . %)faingp.com Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;vi.�E- t,: -'�'-Ids @walterpmoore.com Mr. Mark North-ARK Contracting,Phone: 817-478-7400; . • -1: , �� orth @ark ontrac ' gser�,yi)es.co . v Z Q Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: ( 2,4....-",d4e.../ All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. JUL-25-2013 02:21 P.02 C Texas CMT, Inc. AVA Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com ANCHOR OBSERVATION REPORT Report Date: July 24,2013 Observation Date: July 20,2013 Client: City of Coppell Report No. 4 Project: Creekview Drive Roadway Improvements,Coppell,TX 75019 Identification: Passive Anchor Drilling Project Number: 213-0134 Method of Test: Visual Observation Page: 1 of 1 Anchor Depth to Shaft Required Actual Total Bearing Casing Remarks Location Size Strata Bearing Penetration Penetration Depth Material Depth 1 AF 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole I AG 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1 lAH 10" 0'0" 25' 25' 25'0". Dark Gray Shale NA Water at bottom of hole lAI 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole l AJ 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1AK 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1AL 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole IAM 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole IAN 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole lAO 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole — Note: Anchor drilling observation was scheduled for 8:00 AM.However,due to flooding of work area and ARK Construction preparation of diversion channel,drilling actually started at 9:10 AM. cc: Mr.Larry Davis-City of Coppell,Phone: 972-304-3684;via Fax:972-304-3570 Mr.George Marshall-City of Coppell,Phone: 972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail: efields @walterpmoore.com Mr.Mark North-ARK Contracting,Phone:817-478-7400;via E-mail:mnorth @arkcontractingservices.com ''.2 Ta< Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be repr•. • b the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and. - indicative of the ,iii of apparently identical or similar products. Fig 1 7/0612e) JUL-25-2013 02:21 P.03 C Texas CMT, Inc. Construction Materials Testing GEE Consuliants, Inc. and Environmental Consulting 10044•Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com • • ANCHOR OBSERVATION REPORT Report Date: July 24,2013 Observation Date: July 22,2013 Client: City of Coppell Report No. 5 Project: Creekview Drive Roadway Improvements,Coppell,TX 75019 Identification: Passive Anchor Drilling Project Number: 213-0134 Method of Test: Visual Observation Page: 1 of 1 Anchor Depth to Shaft Required Actual Total Bearing Casing Remarks Location Size rata Penetration Penetration Depth Material Depth 1 AP 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA 1AQ 10" 0'0" 25' 25' _ 25'0" Dark Gray Shale NA 1AR 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA - lAS 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA lAT 10" 0'0" 25' 25' 25'0" ` Dark Gray Shale NA 1AU* 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA . Small amount of water lAV 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA at bottom of hole 1AW 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA . *Note: Grouting for anchor 1AU was performed in two stages:from 3:12 PM to 3:31 PM and then from 4:18 PM to 4:30 PM.This was due to grout pump stopped working at 3:30 PM.Then black poly pipe developed a block.Pumping started again at 4:18 PM. cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr.George Marshall-City of Coppell,Phone: 972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone:817-927-4388;via E-mail:rlacy @faingp.com . Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com Mr.Mark North-ARK Contracting,Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com f.:-1 i e Texas CMT,Inc. TBPE Fi t _F-4521 Reviewed b : 7,.., 4 All letters and reports are for the exclusive use of the client to whom they ar ;.; d shall not be reproduced without the full approval of Texas CMT,Inc- he use of our name must receive our prior written approval. Our letters and reports apply only to the . or observed and are not necessarily indicative of the quantities of apparently identical or similar products. 7/7 (9/ ai 7 pk. : JUL-25-2013 02:22 P.04 C Tex ' s CMT, Inc. AVA Construction Materials Testing GEE Consultants, Inc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com ANCHOR OBSERVATION REPORT Report Date: July 24,2013 Observation Date: July 23,2013 Client: City of Coppell Report No. 6 Project: Creekview Drive Roadway Improvements,Coppell,TX 75019 Identification: Passive Anchor Drilling Project Number: 213-0134 Method of Test: Visual Observation Page: 1 of 1 Anchor Depth to Shaft Required Actual Total Bearing Casing Remarks No./ Size Bearing Penetration Penetration Depth Material Depth Location Strata . lAX 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole lAY 10" 0'0" _ 25' 25' 25'0" Dark Gray Shale- NA Water at bottom of hole 1AZ 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole IBA 10" 0'0" 25' 25' 25'0" ,. Dark Gray Shale NA Water at bottom of hole IBB 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole • 1 BC 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole ..1BD* 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole 1BE* 10" 0'0" 25' 25' 25'0" Dark Gray Shale NA Water at bottom of hole *Note: Grouting for anchor 1BD was completed while adjacent anchor 1 BE was still being drilled.Few minutes after grouting completion of anchor 1BD,the drilling crew encountered fresh grout within anchor hole 1BE at a depth of approximately 21'.The grout level in hole 1BD subsided at that time.Gregario of ARK Construction indicated that the shale likely had crack(s)which caused movement of fresh grout from hole 1BD to 1BE. Hole 1 BE was cleaned of the fresh grout and drilling was completed to the required 25'depth.After grouting hole 1BE,the crew members re-grouted hole 1BD. cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Rod Lacy-The Fain Group,Phone:817-927-4388;via E-mail:rlacy @faingp.com Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com Mr.Mark North-ARK Contracting,Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com Texas CMT,Inc. � TIME Firm: F-4521 Reviewed by: 621111-4----- All letters and reports are for the exclusive use . ;to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and• .,� .';only to the s ested and/or observed and are not nee arily indicative of the quantities of apparently identical or similar products. EH , f yi ) TOTAL P.04