Loading...
WA9401-CS 941004 (2) INFORMATION BY APP.LICANT APPLICAN1 TO FILl IN ALL INFORMATION LINES OR N/A IF IT I)O[5 NOT APPLY. L~"'NEW INSTALLATION L"'3 RECONSTRUCllON PIPg I,INE CARRYING E".3 FI,AII4ABLE OR !tAZARDOIIS SUBSTANCES ( SEE RAILROAU 8T/dil)ARD C,S. 1742 ) EJZ~ON-FLAMMABLE 3UBSTANCJ,'~ I ( SEE RAILROAD STANDARD C.S. 17ql ) E-q bULV~RT AR'UCX.', OoWo m.;,.~s A~ ~_T__~3:] ~_c---------------~e_'~L:l [~..'..--:~.~.r.I .A~,t.,TY ......... .~4, r..._;...~. ...................................... :. :.' ........... '_ ...:.'..-::: .:-':,_ :'. Puewos~ ...C...O~.. ~..ey..~:.~....;~F....~/.Akr.. .............................................................. IF PIPE OR CASING DIAMETER IS GREATER THAN 3'-6' APPLICANT SHALL SUBMIT ENgINEERlid PLAN~. CALCULATION5, SPECIFICATIONS, ANO SOILS REPORT. OISTANCE TO PF, RMANE, NT RAILWAY STRUC, e,,T~U~eE ......................... ANiL.E OF CROSSING WITH TRACK~ ........l~g) ............................... SOIL CLASSIFICATION ........~,.I.,& ................................................ PiP[ SLOPE OR GRADIENT .....C~, ................................................ ou., eA.~ OF RaIL TO TOP OF CANING .....~ ......... "" ..............o, E,o ................,P[ ..... caNl,, FILLER ............ L~NII'II,IOIR~L PIPELINES NITAliCE FROM TRACK Ck'NTERLINE ..... L ............. R ............. I~TH OF BURY TO TOP OF PIPE ..... MR, ............. MAiL ............. HEIONT PROM BA~E OF RAIL TO TOP OF PIPE · ,IIIK .............IIA3L ............. FLAIIIABL( OU6STN4C~ PIPELINE, CLANS LOCATION ..N.lA,.. oRslee FACTOR .. .~..L& .... MINIMUM OF 5 OAYS NOTICE REgU)RED PRIOR TO ENTRY POR CONSTRUCTION UNOERIR~UN~E' OP1 IC CAeLE MAY BE L OCATEO ON R leHT-QF'-WAY, CONTACT ....... e,p, TELECOM AT 19001 ~63-4237 TO VIERIFY LOCATION AND PRIOR TO OleOIN6, INFORMAlION BY RAILROAD ~,~o~:o~r;, .. -XL''' """ ~ .P._I:A__N_OF PIPELINE.~ MATERIALS ANO INSTALLATION PER S.P, DRAWlNO IN). C.E ...............C.9 ............... UI41)~RGROUIID ~IONAL .ON COMdUI41CATION LItE: INVOLVT. D.YES .....NO ...... FIBEROPllC LINE IIW~LI~O. YES .....NO ...... 8HORIIll PLAN AND CALCULATIO N~ REQ'D PRIOR TO CONSTRUCTION. YES .....NO ...... REFERENCE TO ANSIeKED BLANKET AGREEMENT NO ............................................... RAILROAD CORP ................................ 5T4TION NAME ............................... ROUTE KO ....................lIP ............... MAIN LINE BRANCH LINE OTHER ............ DIST.'L'. ...............DIST,'R' VAL.SEC .........................SHT ............ NO. OF TRACKS CROSSED .................. JOINT FACILITY LINI~ YES....,.NO ...... RAILROAD INSPECT/ON: REQUIRED ............................ ESTIMATED COST ...................... PHONE CALL FOR INSPECTION: ...................................................... REGION ............................................... DRAWING 140 ...................................... SHEET NO ......................................... DATE ................................................. BY ..................................................... CRECKED BY ...................................... lEOlION A-A IEC110N A-A PIPELINE CARRYING NON-FLAMMABLE SUB~$TARCE$ PIPELINE CARRYING FLANKABLE SUBSTANCES SEE C,8, 1741 SEE C.5, 1742 6OUTHERR PACIFIC 'lRANOPORTAlION CO. ST. LOUIS SOUIHW[Sl[RN RY. CO. 60UTI[RN PACIFIC CHICAGO ST. LOUIS CORP BITA IEQIJIIIED FOR RMWelEI) PIPILl[ Ai)llOM, O0 ALONI RtdlNT OF WAY CONSTRUCTION SPECIFICATIONS AND CONTRACT DOCUMENTS FOR EAST BELTLINE ROAD WATER LINE WA 94-01 FOR THE CITY OF COPPELL SEPTEMBER, 1994 2.3. 2.4. Pay Item #4 Reconnect existing 2" service line and reset water meter: This work shall consist of disconnecting the existing 2" water service line at the west end of the project and reconnecting it at the east end of the project. This work shall consist of resetting the existing meter and installing adequate amoum of 2" pipe to reconnect the water line to the meter. The exact location of the 2" water line is unknown. All work shall be coordinated with the owner of the business at the southeast comer of Ledbetter and Beltline. Measurement and Payment shall be made on the basis of the contract price per each (ea), regardless of the quantity of 2" water line, and will be total compensation for furnishing all labor, materials and equipment necessary to disconnect and reconnect the 2" water line and meter. Pay Item # 5 Bore and Install pipe beneath Beltline road: This work shall include the cost incurred for boring under Beltline Road as shown on Sheet 6 of the plans. The cost is complete in place including the bore, 14" steel casing pipe, grouting of casing pipe, bore pits, shoring and the 8' PVC pipe to complete the work. All boring shall be dry boring as per the City of Coppell specifications. Measurement and Payment shall be made on the basis of the price bid per-linear foot (LF) and shall be total compensation for furnishing the 14" steel casing, 8" PVC pipe, excavating and recompacting the bore pits, all necessary shoring and for all labor and equipment necessary to complete the work. Any additional boring shall be considered subsidiary to the unit price bid for items I & 2 and no additional payment will be made. 2.5. 2.6. Pay Item #6 Air Release Valve: This work shall include the installation and construction of air release valves complete in place in accordance with the City of Coppell Standard Construction Details. Measurement and Payment shall be made on the basis of the price bid per each (e,a) and shall be total compensation for furnishing all labor, materials and equipment necessary to complete the work. Pay Item f/2" Blow Off: This work shall include the installation and construction of a 2" Blow Off valve complete in place in accordance with the City of Coppell Standard Construction Details. Measurement and Payment shall be made on the basis of the price bid per each (ea) and shall be total compensation for furnishing all labor, materials and equipment necessary to complete the work. Description of Pay Items SUBDIVISION REGLrLATIONS - CIT'~ OF COPPELL, TEXAS APPENDIX C - DESIGN CRITERIA AND STANDARDS SECTION IV - WATER MALNS SECTION IV - WATER MAINS A. PoHcy All subdivisions shall be provided with an approved water system. In the corporate limits of the City of Coppell, all new subdivisions shall be connected to the City's water distribution system. The Developer shall furnish and install the complete water distribution system, including the mains, valves, fire hydrants, service, lines, meter yokes and boxes. These installations shall meet the criteria of the City's Master Water Plan. Water lines shall be installed within street fights-of-way; or, with approval of the City, may be installed in dedicated easements or alleys. Where water lines are to be installed on private property, the Developer shall secure the necessary easements in the name of the City of Coppell, where necessary. Easements shall be 25 feet wide in open areas and 20 feet wide between residential lots. ® Water mains shall be a minimum of 8 inch nominal internal diameter, with integral bell. All materials shall conform to AWWA specifications. PVC mains shall be blue. Mains 10' and smaller shall be Class 200, DR-14. Larger than 10'. shall be Class 150, DR-18, with integral bell. Water services for each lot shall be a minimum of 1 '. type K copper. Each service shall be provided with two in-line nylon ball cutoff valves equipped with lock wings and contained inside the meter box. Residential services shall have a 5/8" diameter yoke and shall be equipped with a dual cheek component (as part of the yoke) and shall be of materials approved by the City (see City of Coppell Standard Construction Details). All other water services shall be equipped with a separate double check back-siphonage device in a separate box meeting the specifications of the City of Coppell. All tapping saddles and connection nipples to water yoke shall be bronze. Service to each lot shall have a maximum cover of 20 inches. Water service lines shall not be spliced under existing or proposed streets or paved areas. Residential subdivisions with more than 200 lots shall install a bacteriological sampling station meeting the specifications of the City of Coppell. Page 93 [] f III T "' :L SCOPE Pipelines included under Ihese specificaliens ere Ihose inslolled la carry siesta, waler or any non-flomnmble subslance which from ils nolure or pressure, might cause damage if escaping on or in Ihn vicinity of railway properly, GENERAL REQUIREMENTS a. Pipelines under railway tracks shall be encased in o larger pipo mr condull coiled the casing pipe as indicolod in Figure I, I DesiSt shall be based on superimposed load dec Io rol way (CooFar E-80) loading wilh oppllcoble impeel in combinehen wilh internal pressure, oxlernol loads and insloliolion loads. b. Cosin pipe may be omitted under Ihe followin canaltitans provi~ng Ihal open 1ranching is opproved by I~le Chief Engineer. (I) Under industrial tracks, and under slow speed branch line tracks in oved city sireels whore line pressure is less Ihon I00 psi. ~he pipe joints are Io be of leokprool CWnslruclion and Ihe pipe malarial shall solely wilhslond Iho combination of inlernol pressure and oxlernol loads. JoinIs Iholl be mechanical or welded type. (23 Far non-pressure sewer and slorm drain crossings under I1 ht traffic branch lines where Ihe pipe slrenglh is copoNe n~ wilhslonding railway loading. c. Pipslines shell be located. where proclicoble. to crosl tracks al approximately right angles Iherelo bul preferably al nat less then 45 degrees. end shell not be placed wilhin culverts nor under railway bridges. Piplines shell preferably be inslnllad under Irocks by dry boring or joeking. d. Pipelines laid longitudinally on railway righis-of-waY shall be laceled as for as practicable from any lrocks or olher imporlonl shuclures. If located wilhin 25 feel of the canfor line of any Irock or where Ihere is danger of damage from leakage to any bridge, building or to slruclure, the carrier pipe shall be encased or ef special design as opproved by the Chief Engineer. 3. CARRIER PIPE o. Carrier line pipe and joints shall be of accepled malarial and construction as opproved by Ihe Chief Engineer. Plpa malarial under and adjacent to Iraeke are to be capable of supperling o minimum of ~,600 pounds per square fool for cover heighls of 3,0 feel or less, For heights greater than 30 feet, supporting woighl shall be increpsed proportionately, The pipe shall be laid wilh sufficnnt slack so 1hat it is nol in tension, b. Pieslie pipe Ln n caslnn is on occeploble material if il is PVC or High Density polyethylene and minimum schedule 40. Inlernol proscures not 1o exceed 100 psi. c. Ductile Iron Pipe in o casing is acceptable as follows: Class 2 for diameters of 4" thru I0' Class 3'5 for diemolars of 12' Ihru Class 4- for diemolars of 16" Ihru Class 6 for diiimeters of 20" thru d, Reinforced Concrete Pipe is acceploble if ii is Class V, Minimum of Class III RCP is occeploblo for Iongiludinol pipe located q5 feel or more from Ihe cenlerline of Irack. 3. CARRIER PIPE (conlinued} e, Viirifled Cloy Pipe (ASTM C-700} in o ccsing is occepIoble if il is exlro siren Ih wilh joints per ASTM C-425 and based on o load factor of 1.3. Longiludinol viitilled cloy pipe as described above is occepIoble uncosed il backfill is campeeled Io mulch densily el odlocenl soil. 4. CASING PIPE Casing pipe and joints shall be of leakproof' construction. capable of wilhslondin9 railway loading (Cooper E-GO), minimum size Io be delermlned ham Table I and 2. Table 2 indicalas e ndnimum Ihickness based upon superimposed loads only or, d it is Ihe responsibilily of Ihe insloller Io provide a casing which is odequole lot Ihe loads Ihol resull during inslollolion, II oddillonol Irocks are conslrucled in Ihe lulure, tile casing shall be exlended correspondingly by Ihe pipeline owner, . Sloel cosing tpn Io hove e minimum laid sirengill of 35,000 psi. When casing r; inslolled wilhoul bonerll of o roleolive cooling, and said casing is nol calhodicolly proleer;d, Ihe wall d Ihickness shown in labia 2 shall be increased Io Iho nearest slander size which is o minimum of 0,06:5" arealet than Ihe thickness sho.wn, oxcepl for diameters less than 14'. Casing dislances shown its Figure I ore measured el righi angles Io the Ireck. 6, CONS1RUCTION o. Casing shall be so conslrucled as to provonl leakage of any subslance from Ihe casing Ihroughoul ils lenglh excepI el ils ends. Casing shall be so inslolled as Io prevenl Ihe formalion of o wolerwoy under Ihe railway, wilh on even bearing Illrough lie lenglh, and shall slope to one end (except for Iongiludinal occupancy)- . b. Inslollolion by open trench reelhods shall comply wilh Inslollolion of pipe. Culverts, American Railway Engineering Association (AREA) Manual for Railway Englneoring, Chapter I, Port 4.12.. c. Dry bored or jacked inslollotions shall have o bored hale diomehr essenliolly Ihe same as tile outside diemeier of Ihe pipe plus Ihe Ihickness el Ihe prohclive coating, If voids should develop of if the bored diameter is grealer than the oulside diameter o( Ihe pipe (including coating) by more than one inch, Ihe space shall be filled by areurine or other remedial measures as approved by Ihe Chief Engineer, Boring operations shall hal be slopped if such sloppage would be debtmenial Io Ihe railroad. d. Tunneling operallons shall be conducled as opproved by Ihe Chief Engineer- If void~ are caused by Ihe lunneling operalions, they shall be filled by pressure grouling or by olher approved reelhods which will provide proper support, e. Void halwean casing and carrier pipe to be filled wilh sand in oil high pressure inslollollons, Void to be perilally filled in olhers as direcled by Ihe Chiel Engineer- 6, 'pROTECTION AT EHD OF CASING The ends of the casing are Io be suitably sealed ogainsl Ihe entrance of foreign malarial,, bul ore nol Io be tighlly sealed, C.S. SOUTHERN PACIFIC LINES COMMON STANDARD " PIPE LINES FOR NON-FLAMMABLE SUBSTANCES ACROSS OR ALONG RIGHT OF WAY NO SCALE REVISED MAR. 15. 1990 7, DF_PTH e,c INSTALLA"IION Refer to Figure I for minimum cover depIh- for pipellne cros-ing-. pipelines Ilid longitudinally'on railway rigMs-of-waY. 45 1eel or less from cenlelrllne of Ireck. :shall be buried not loss then 4 foot Iroen ground surface te lop of pipe. Where pipeline is laid more Ihan 45 [eel from conlerlina el Irack, minimum cover shell be at least 5 fool. 8. 5HUT-OFF VALVES Accessible emergency shul-oft valves shell be inslolled within effoclive dislances elich side of Iho railway as agreed Io by lhe Chief Engioor · and Ihe pipeline company. Where pipelines are provided wilh aulomalic conlrol slotions al locallens end withln dislances approved by Iho Chiel Engineer, lie additional valves shall be required. g, APPROVAL OF PLANS Plans let proposed inslallalion shall be submilled to Regional Engineer and must meal lhe approval of Ihe Chief Engineer bolero conslruclion begins- Pleli's shall be drawn Io scale silowing telalien el proposed pipe line to railway Iracks. angle of crossing. mile peel localion or ro,lwoy survey slation, re,lets-of-waY and general Ioyoul of Irocks end railway locililies. Plon:s :shall include all appurtonanl foalares of Ihe Ripe line. such as valves, manholes. reel:s. casing. elc., located on rollwe)' properly. Cross lociion skelch should show pipe line and appurlcnanl feelarcs as Io Ihe Irocks end surrounding ground. The elocution of tile work on railway rigisis-of-waY shall be :ubjocl to the inspeclion and direction at Ihe Regional Engineer or his aulhorize · on form sisall be mp Y d (C.E. 417P108, SH. 1), Tile applecall ' ZO.' EXECUTION OF WORK The Pil~eline A recreant end Contraclors Right of Enlry Agreement shall be fully eleCuled ~efore any work will be allowed on railway righi-el-waY- The execution of Ihe work an railway rights-of-way. including Ihe supporting of tracks, shall be subject to Ihe inspeclion end direclean of the Regional Engineer. Table 1 Table for Determining Minimum Size or casing TYPE OF CARRIER PIPE AND STYLE OF JOINT SIZE "MINIMUM NOMINAL SIZE TYTON } BELL-SPIC. OT ~ MEalAHICAL NOMINAL CARRIER SIZE OF CASING CARRIER MINIMUM NOMINAL SIZE OF CASING 3/4" 2' 4' I0' I0" 12" I' 2 I/2' 6' I4''''T'''' 14' 16' I0" I 1/4' 5' 8" 16' 16' 18' 12' I I/2' 5 I/2' I0' 18' 20' 20' 14' 2' zl.,- 12' 22" 22' 22' 16' 2 1/2"' 4 1/2" 14® 24"' 2/1' 26' 18' 5' 6' 16' 26' ' 26' 28' 20' :'5 1/2' 8' '. I""'~' 28' 28' 30' 24' 4' ' 8' 20' 30' 30' 32" 26' 6' I0' 2,1-' 56' 56" ;56' 30' :56' 50' 42' 2..51 Pfttl'4, .._g~OF TRACK MAINLINE OIiANCII LINE .-.< INDUSTRY ~9'-0:..~. 'OF TRACK Casing Requirements Figure 1 C.S. 1741 of Table 2 Steel Casing MINIMUM WALL NOMINAL TtlICKNESS WITH V.C. PIPE DIAMETER pROTECTIVE EXflt'A S1RONC (INCITES} COATING i0: LESS TIIAN I'1' 0.188" 16' 18' 0.250' 18" 20' 0,281' .. 20" 22' 0.312" 24' 0.344' 24' 26' 0.375' 26' 25' & 30' 0.'106' 36' ' 5q' B 56' 0.469' 38% 40' 8, 42' o.5OO' .. SOUTHERN PACIFIC LINES COMMON STANDARD PiPE LINES FOR NON-FLAMMABLE SUBSTANCES ACROSS OR ALONG RIGHT OF WAY NO SCALE I1EYISEO MAR. 15. 1990 Dallas Area Rapid Transit P.O. Box 660163 Dallas, Texas 75266-0163 214/749-3278 - April 12, 1994 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell P. O. Box 478 Coppell, TX 75019 Re: East Belt Line Road Proposed Water Line/Project #WA 94-01 Dear Mr. Griffin: In response to your letter of March 28, 1994 to Tom Ryden regarding the referenced City Water Line Project, a license agreement with the City will be required for the crossing of the pipeline under DART right of way. A Southern Pacific Lines application is enclosed. Please complete the application and return same with a plan and profile of the pipeline crossing the rail corridor. ~Known utilities paralleling within the railroad right of way include U.S Sprint's fiber optic cable,~Explorer Pipeline Company's petroleum products pipeline and the former Conoco pipeline conveyed to Southern Pacific Telecommunications. If we can be of assistance to you or the City's staff with this project, please contact me at (214) 749-2917. Sincerely, Jan Seidner R/W Management Representative JMS: Enclosure