Loading...
ST9905-LR070314 (2) ECS Texas, LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 LETTER OF TRANSMITTAL (972) 392-3222 (FAX) 392-0102 March 15, 2007RE:Bethel Road - Coppell City of CoppellECS Job #19:5061 P.O. Box 9478 Permits:- Coppell, TX 75019 Location:Bethel Road ATTN:Mr. Kenneth M. Griffin, P.E. Coppell, TX We are enclosing: XMaterials Engineering Division Reports XFor your use XAs requested CC:City of Coppell - Rick O'Dell TISEO Paving - Robert Caudill ENCL: Field Report #503/14/2007 Daniel Franklin, P.E. Jason Allen, SET President /Principal Engineer Construction Services Manager ECS Texas, LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 FIELD REPORT (972) 392-3222 (FAX) 392-0102 19:5061 Project No. 5 Report No. Bethel Road - CoppellWednesday 03/14/2007 ProjectDay & Date 67°/ Cloudy Weather Coppell, TX Location 6.00 On-Site Time City of Coppell - Kenneth M. Griffin, P.E. Client 0.00 Lab Time 1.00 Travel Time* 7.00 Total 0.00 Re Obs.Time Remarks Time ofArrivalDeparture 18.00 Trip Charges*Tolls/Parking*Mileage* 10:30A04:30P Nuclear Gauge Rental Chargeable Items * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Soil Compaction: The undersigned arrived on site, as requested, to observe the placement and compaction of soils for 8" sanitary trench. Utilizing the Nuclear Method (ASTM D-2922) to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in compliance with project drawings and specifications with regard to lift thickness and moisture content. Danny Mize, — Senior Field Technician1800 By 86130