Loading...
ST9905-LR070315 ECS Texas, LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 LETTER OF TRANSMITTAL (972) 392-3222 (FAX) 392-0102 March 19, 2007RE:Bethel Road - Coppell City of CoppellECS Job #19:5061 P.O. Box 9478 Permits:- Coppell, TX 75019 Location:Bethel Road ATTN:Mr. Kenneth M. Griffin, P.E. Coppell, TX We are enclosing: XMaterials Engineering Division Reports XFor your use XAs requested CC:City of Coppell - Rick O'Dell TISEO Paving - Robert Caudill ENCL: Field Report #603/15/2007 Daniel Franklin, P.E. Jason Allen, SET President /Principal Engineer Construction Services Manager ECS Texas, LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 FIELD REPORT (972) 392-3222 (FAX) 392-0102 19:5061 Project No. 6 Report No. Bethel Road - CoppellThursday 03/15/2007 ProjectDay & Date 69°/ Sunny Weather Coppell, TX Location 4.00 On-Site Time City of Coppell - Kenneth M. Griffin, P.E. Client 0.00 Lab Time 1.00 Travel Time* 5.00 Total 0.00 Re Obs.Time Remarks Times ofArrivalDeparture 18.00 Trip Charges*Tolls/Parking*Mileage* 09:30A10:30A Chargeable Items 02:00P05:00P * Travel time and mileage will be billed in accordance with the contract. Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Job Cancellation: The undersigned arrived on site as requested to observe the compaction of soils on 8" sanitary utility. Upon arriving on site the contractor informed the undersigned that compaction testing was not needed on this date. Concrete Placement Observation: The undersigned arrived on site later this date, as requested, to observe the placement of 10 cubic yards of4200 psi concrete for manhole. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. 1 set of 4 cylinders were cast for compressive strength testing in our laboratory. Danny Mize, — Senior Field Technician1800 By 86147