ST9905-LR070315
ECS Texas, LLP
4950 Keller Springs Road, Suite 480
Addison, TX 75001
LETTER OF TRANSMITTAL
(972) 392-3222
(FAX) 392-0102
March 19, 2007RE:Bethel Road - Coppell
City of CoppellECS Job #19:5061
P.O. Box 9478
Permits:-
Coppell, TX 75019
Location:Bethel Road
ATTN:Mr. Kenneth M. Griffin, P.E.
Coppell, TX
We are enclosing:
XMaterials Engineering Division Reports
XFor your use
XAs requested
CC:City of Coppell - Rick O'Dell
TISEO Paving - Robert Caudill
ENCL:
Field Report #603/15/2007
Daniel Franklin, P.E.
Jason Allen, SET
President /Principal Engineer
Construction Services Manager
ECS Texas, LLP
4950 Keller Springs Road, Suite 480
Addison, TX 75001
FIELD REPORT
(972) 392-3222
(FAX) 392-0102
19:5061
Project No.
6
Report No.
Bethel Road - CoppellThursday 03/15/2007
ProjectDay & Date
69°/ Sunny
Weather
Coppell, TX
Location
4.00
On-Site Time
City of Coppell - Kenneth M. Griffin, P.E.
Client
0.00
Lab Time
1.00
Travel Time*
5.00
Total
0.00
Re Obs.Time
Remarks
Times ofArrivalDeparture
18.00
Trip Charges*Tolls/Parking*Mileage*
09:30A10:30A
Chargeable Items
02:00P05:00P
* Travel time and mileage will be billed in accordance with the contract.
Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted.
Job Cancellation:
The undersigned arrived on site as requested to observe the compaction of soils on 8"
sanitary utility. Upon arriving on site the contractor informed the undersigned that compaction
testing was not needed on this date.
Concrete Placement Observation:
The undersigned arrived on site later this date, as requested, to observe the placement of 10
cubic yards of4200 psi concrete for manhole.
Concrete observed on this date appeared to be placed in compliance with project
specifications with regard to temperature, slump, air content, and batch to placement time.
1 set of 4 cylinders were cast for compressive strength testing in our laboratory.
Danny Mize, — Senior Field Technician1800
By