DR1201-CR130730 T H E • C I T Y • O F
COPPELL
X A s 18
DAILY CONSTRU TION REPORT
PROJECT: WAL&ROADWAY AINING DATE 7/3/fr 1 REPORT#
IMPROVEMENTS
DAY M I 1W ] .1-' IF IS IS
PROJECT NO. DR 12-01
WEATHER SUN CLEAR '�,�(" RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32-50 50-70 70-85 •OS�
WIND Still Mod Hi Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry Mod Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Co 14414.94ciix.47 exi,cipyg reel4et� s*Lfer /
ct ja vfe7 IU SeN/Y ' Z r.e/ M/Mem!/ ,4' ' -7
C'at-77 Gfl�y�
�km � Nieel )( a.,�--Qsi4 /;vv —
FefW - ✓G -flip. — fi)Gkdy'c •e.&
SIGNATURE
ENGINEERING INSPECTOR