DR1201-CR130731 T H E • C 1 T Y O F
COPPELL
x s a DAILY CONSTRUCTION REPORT
PROJECT: CREEKVIEW DR RETAINING I
WALL&ROADWAY DATE �/r gI/G vI REPORT#
IMPROVEMENTS j
DAY M TIT F IS IS
PROJECT NO. DR 12-01
WEATHER SUN Fro ....a OVERCAST RAIN SNOW
OWNER: CITY of COPPELL TEMP To 32 32- 50-70 70-85 854p,®
WIND Still High Overtime Form
CONTRACTOR: FAIN GROUP HUMIDITY Dry 40 Humid Submitted? Y /N
PROJECT INSP: LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF NON-MANUAL MANUAL REMARKS
CONTRACTOR/SUBCONTRACTOR
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Sod f Zt Gr Py, fJ'�stil e�+r5�`` tr�F
l a x e 6 P a r 1 3d .
SIGNATURE
ENGINEERING INSPECTOR