REINFORCING STEEL PLACEMENT
Report Date: August 2, 2013 Test Date: July 26, 2013
Client: City of Coppell Report No.: 1
Project Creekview Drive Roadway Improvements Project No.: 213-0134
Identification Reinforcing Steel Observation '�+ .
Method of Test Visual Observation Page 1 of 1
Results
On July 26, 2013 reinforcing steel was observed at the following location:
Concrete beam for row#1 passive anchors lA through 1V.
The following discrepancies were noted and called to the attention of Gregario, a representative of
ARK Contracting Services:
•
1) Place an additio 1 # stirrup adjacen to the planned constructio t+.
The above discrepancies were corrected as noted. /
•
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax: 972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Rod Lacy-The Fain Group,Phone:817-927-4388;via E-mail:rlacy @faingp.com
Mr.Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com
Mr. Mark North-ARK Contracting,Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com
1
2 .
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed 21494---- ..
All letters and reports are for the exclusive use of the client to whom they are addressed and shall be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or ob ed and are not necessarily indicative of the quantities of apparently identical or similar products.
AUG-02-2013 05:47 P.02/02
A
ATI&
Texas CMT, Inc.
Construction Materials Testing GEE Consultants, Inc.
and Environmental Consulting
10044'Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
•
REINFORCING STEEL PLACEMENT
Report Date: August 2, 2013 Test Date: July 31, 2013
Client: City of Coppell Report No.: 2
Project Creekview Drive Roadway Improvements Project No.: 213-0134
Identification Reinforcing Steel Observation
Method of Test Visual Observation Page 1 of 1
Results
On July 31, 2013 reinforcing steel was observed at the following location:
Concrete beam for row#1 passive anchors 1W through IBE.
•
The following discrepancies were noted and called to the attention of Gregario, a representative of
ARK Contracting Services:
1) The beam width was 16.5 to 17 inches at some locations whereas 18 inch was required per plans.
The above discrepancies were corrected as noted prior to concreting on the same day.
Technician: MR
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail: gMarshall @coppelltx.gov
Mr. Rod Lacy-The Fain Group,Phone: 817-927-4388;via E-mail:rlacy @faingp.com
Mr. Ernie Fields-Walter P.Moore,Phone:214-740-6251;via E-mail:efields @walterpmoore.com
Mr. Mark North-ARK Contracting,Phone: 817-478-7400;via E-mail:mnorth @arkcontractingservices.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: r)314