Loading...
NL 635 BP (14)-CS130627 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Northlake 635 Business Park, Lots 1 & 2, Block E, Site Plan, to allow the development of two office/warehouse buildings totaling 88,200 square feet on Lot 1, Block E, containing 8.1 acres of property and to allow surface parking on Lot 2, Block E, containing 1.6 acres on a total of 9.7 acres of property located at the northwest corner of South Belt Line Road and Lakeshore Drive, at the request of Columbia Texas Lakeshore II Industrial LLC, being represented by Trey Braswell, Kimley-Horn & Associates, Inc. STAFF REP.: Matt Steer PROJECT ID# SPA-13-0037 DRC DATE: June 27, 2013 and July 3, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There will be additional comments during detailed engineering plan review. 2. The fire line loop around the building will need to remain private. The water to the north is private that you are proposing to tie into. Is there an agreement in place to share the water? The vaults will need to be placed at the tie-ins to the mains. 3. The fire hydrants will be private as well and will not need easements. 4. The sewer you are proposing to tie into is also private. This would need to be included in the agreement. 5. The FDC will need to be on the same side as the fire hydrant. 6. The domestic meters will need to come off of the public main. 7. Is there mutual access agreement to the north? DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Northlake 635 Business Park, Lots 1 & 2, Block E, Replat, being a replat of Lot 1R1, Block D, to establish necessary easements and fire lanes to allow the development of two office/warehouse buildings and surface parking on 9.7 acres of property located at the northwest corner of South Belt Line Road and Lakeshore Drive, at the request of Columbia Texas Lakeshore II Industrial LLC, being represented by Trey Braswell, Kimley-Horn & Associates, Inc. STAFF REP.: Matt Steer PROJECT ID# RPNR-13-0038 DRC DATE: June 27, 2013 and July 3, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1.There will be additional comments during detailed engineering plan review. 2. The fire line loop around the building will need to remain private. The water to the north is private that you are proposing to tie into. Is there an agreement in place to share the water? The vaults will need to be placed at the tie-ins to the mains. 3. The fire hydrants will be private as well and will not need easements. 4. The sewer you are proposing to tie into is also private. This would need to be included in the agreement. 5. The FDC will need to be on the same side as the fire hydrant. 6. The domestic meters will need to come off of the public main. 7. Is there mutual access agreement to the north?