Neighborhood CU-CS130822 T H E • C I T Y O F
cOmELL
, *
X A s' 1 S
August 22,2013
J.R.Aguero
Level 5
200 Riveredge Parkway, Ste 100
Atlanta GA 30328
RE: Texas Bank Addition,Neighborhood Credit Union
Final Acceptance
Dear Mr. Aguero:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for
the referenced project. The two-year maintenance bonds and record drawings have been received.
Maturity on the bonds will be two years from the date of this letter.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if
stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a
Notice of Termination(NOT)to discontinue coverage under the SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks
for your cooperation.
Sincerely,
Rick O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972)304-3570
cc: Michael Garza,P.E., Civil Engineer
Glenn Hollowell,P.E.,Public Works Manager
Michael Arellano, Chief Building Official
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673