Loading...
NL Cypress-PT130823 (2) Nor TCEQ *._ GE CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality(TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 "PRI, , Y OPERATOR"NOTICE This notice applies to construction sites operating under Part II.E.3.of the TPDES General Permit Number TXR150000 for discharges of storm water runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part IILD.2. of the general permit.Additional information regarding the TCEQ storm water permit program may be found on the internet at: http://www.tcea.state.tx.us/nav/permits/wq_construction.html Site-Specific TPDES Authorization Number: TXR,15 Operator Name: Contact Name and Phone Number: YAgyL , UiVr 2c14 %) O Cypress Waters(SPEC) Project Description: Physical address or description of West side of Cypress Waters Boulevard,700 feet north the site's location, and estimated start date and projected of Hackberry Road in Dallas,TX 75063 end date, or date that disturbed soils will be stabilized. Estimated Start Date: July 2013 Projected End Date: March 2014 Location of Storm Water Pollution Prevention Plan: Construction trailer,mail box or call above number. ...... ...................... ... SAM TCEQ L !.. GE CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality(TCEQ) Storm Water Program TPDES GE NE * PERMIT TXR150000 «P. OPERATOR"NOTICE This notice applies to construction sites operating under Part II.E.3.of the TPDES General Permit Number TXR150000 for discharges of storm water runoff from construction sites equal to or greater than five acres, including the larger common plan of development. The information on this notice is required in Part IILD.2. of the general permit.Additional information regarding the TCEQ storm water permit program may be found on the Internet at: http://www.tceq.state.tx.us/nav/permits/wq construction.html Site-Specific TPDES Authorization Number: DMA 5 Operator Name: Billingsley Company Tom Holland Contact Name and Phone Number: (214)270-0986 Cypress Waters(SPEC), Project Description: Physical address or description of West side of Cypress Waters Boulevard,700 feet north the site's location, and estimated start date and projected of Hackberry Road in Dallas,TX 75063 end date, or date that disturbed soils will be stabilized. Estimated Start Date: July 2013 Projected End Date: March 2014 T,ocation of Storm Water Pollution Prevention Plan: Construction trailer,mail box or call above number. w. .._. �_. y o OS3• t al iii Oa 0 o tra 40 V) 0 6 0a � 0 0 ti 3 +� 2 a Si ao >,0H V) o U c 0 oa w I cum) ea 5 wa' 0 o ti � w 012 am 0 d 5 0 0 o 5' p, v 0 ,4 '0 G 0.,•••R� �'$d O y ® ?+y �i A N Qy cd r_, 0 4 vMQQ" a�i 0 cu k0 0� U ?. 5.1'• .1 0VP+ MA 0, ,Q�ii-w UI w ti I01_p. �A� �.' a W 5„ is c_.cy�J ti w a� un w w 1, B,44 '8yr, o 0-4 6" w'ci g › a .0•74 .-0 ca o3 a, 0 ° 8 - °' �a ri A' 8 V. 1,4D 021 ,. . .,s. t W � �� 1 o ° r ov4 ;� a Ft 0v, O 0 0Fx C � N y ni; 44 0 e' as 0oo iiiiu N a" a ;, �� w OAA eaQ y m rn 8 8 ,{-, ti 0.1 120 W ++0