Loading...
DFW Airport-PT130826 A copy of the approved permit must be on the job site at all times. CC: Applicant r N e • c t r r - o F Page 1 of 4 Public Works COFFELL Permit File Rev. 11/07 *, ;„' let.* �'"_a=' o it Orig. to Project File c r 4 h _ 1 6 a t\ppEowED RIGHT-OF-WAY USE PERMIT APPLICATION Per inn valid for 90 calendar dogs Iro,n date o/approval Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd. Date of Submittal: 20 August 2013 Applicant's Job g/ Work Order rY 9500499, DO #6 / 3588 6 PERMIT FEE: 5100.00 (No charge to Utility Companies with approved Franchise/ROWV Use Agreement) Refer to the City of Coppeli Ordinance No.2001-944. Certificated Telecom Provider? Y N ❑ Plans provided and approved (Erosion Control/safety fences must be installed prior to beginning work) Project Name/ Location: Relocation of DFW Aircraft Noise Monitor North Terminus of Hammond St in City ROW r General Contractor: Phillips May Corporation Contact# 972-586-0038 Permit Issued to Company / Representative: DFW International Airport/Harvey Holden Address: PO Box 619428,DFW Airport,Texas 75261-9428 Telephone N: 972-973-5570 _ Emergency Telephone#: 972-973-5562 Utility Company Represented: ❑Oncor Electric Delivery ❑Atmas Energy ❑Verizon ❑SIHC/ AT&T Dime Warner Cable ❑CoSery Electric/Gas ❑Other DFW w'0ncor&Verson providing services. General Description of Work(provide four NJ sets of plans): In accordance with Ord. No.2001-944. Construct 8la1Win ground)X 2'diameter concrete pier. Move existing 20'noise monitor pole assembly from current location on private property approximately 85'to new location in City ROW at northern terminus of Hammond St.cul-de-sac 972-973-5562 Estimated Start Date 20 August 2013 Estimated Completion Date* 18 September 2013 * Completion requires submittal of Completion Verification Notice(see page 4) . Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: YES NO . Is removal of exiting streets, alleys,or sidewalks necessary? YES 0 NO 0 if YES, must have City inspection prior to concrete replacement Right-of-Way Use Permit Application Page 2 of 4 Representative(s)of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to:Erosion Control Ordinance, compaction requirements (density tests may be required at the applicants expense)and barricading according to the. Texas Manual on Uniform Traffic Control Devices. Aren(s) affected must be restored to as good condition as before the commencement of work (grading,drainage, vegetation,and erosion control). To schedule Public Works final inspection(Page 4)call 972-4624155. i► Any excavation requiring closing of a street/alley must be reported prior to closing to the follossing: Police Department 0 972-304-3600 Fire Department 0 972-304-3500 Street Department 0 972-462-5150 Engineering Department 0 972-304-3679 ... Attach barricade plan/trench safety plan if a lane or street closure is required. NOTE.: Street closures are allowed from 9:00 a-nt. until 3:00 p.m. ONLY unless otherwise approved by City Engineer. .. Attach Work Order(Franchise only)and/or 4 sets of prints showing proposed work. LI I- --s /_.__. A /A C Y 1 ontacts must be made to locate existing utilities 48 hours prior to beginning work. .. _ -_- , . . (Application with original signatures should be submitted to the Engineering Department before approval.) 4 VI ��____ ..__ H.G. Holden 13 August 2013 Signature of Utility Company Representative Printed Name Date NM --- Brian Mitchell 8/19/13 Signature of Contractor Representative Printed panne Date ,ee))4 &IV)\N e/b67d Sigma are of City Representative Printed Name Date Comments: Project Manager - Brian Mitchell 214-738-7161 (Cell) Superintendent - Chris Mayeux 214-533-0153 (Cell) r NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, Glitch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell cads and evert' claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit front the City, if such permit is granted. THIC • CITT • OF. Page 3 of 4 COPPELL A A , 6 LTTILITI'RELOCATION CHECKLIST FOR WORK WIitiii' CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: 1. A copy of the valid approved City of Coppell pemuit is required on the project at all times. 2. Notify adjacent property owners(commercial&residential)of project timeline;provide then with contact names and phone numbers. 3. Proper erosion control measures must be taken. 4. Follow Texas MUTCD standards for work in traffic zones. 5. Sod is to be replaced when necessary. 6. Irrigation repairs must be petfomred in a timely manner. 7. Follow OSHA recommended trench safety at all times. 8. Repair existing utilities that are damaged,including but not limited to clean-outs,water valves,and SS manholes. 9. Densities may be required in trench lines(ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m.or after 4:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting-1 800 DIG TESS andlor the following: CITY OF COPPELL 1YI ILLITIES DIVISION cappelltx.gotitutility-operations-division 972/462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/304-3679 HOMEOWNER ASSOCIATIONS 972/304-3678(Planning Dept.) TIME WARNER CABLE FEDERAL EMERGENCY 3IGMT.ADMEN. 214/320-5455(Milne Rasmussen) 940/898-5138 AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY 214/215-3031 (Rich Millenman) 817/588-5800 COSIRV Gas&Electric DENTON CO. LEVEE DISTRICT 940/321-7800 x 7624(Greg Ward) 214/352-5118(Richard Hightower) EXPLORER PIPELINE Atmos Energy 918/493-5100(Patrick Nwakoby) 9721 360-4428 Gary Dickinson ONCOR Electric Delivery 1 300 DIG TESS for line locales 972/323-8917(Larry Redick) (344-8377)or VERIZON COMMUNICATIONS wv.w.texasonecall_c or 972/318-5277 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16."Clean-up" requires returning work area to pre-project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) Page 4 of 4 T H H • C I T V • 0 R CQFFELL y c i � ' F k 8 4 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay fuhire projects. Franchise Utility Name DFW International Airport Project Location/Applicant's Work Order # (if applicable) Northern terminus of Hammond Street cul-de-sac. Sub-contractor Company Name Phillips May Corporation 24 hr.Contact Number 214-533-0153 - Chris Mayeux Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OP COPPELL PUBLIC WORKS PERSONNEL. •3• Inspected by of UTILITIES Maintenance Division on and found to be acceptable f not acceptable because Follow-up needed? NO I YES Follow-up scheduled for ❖ Inspected by of STREETS Maintenance Division on and found to be acceptable/not acceptable because Follow-up needed? NO/YES Follow-up scheduled for A copy of this completed notice is to be provided to: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 r ® N r, ■ ...I I ......2=.,.. ",.../"."•• T.- ,,...10 ,_ , , City Property '` Hard 8 Parking / ' xis I . . 1 x . - ., . Private Property ;E IPrivate Property 1/ . ICreek Bed a; Oabion Lined I I t Private Property r- - 45. ' I MONITOR NE6 I Current Location ., NE6 Relocation Site in City of Coppell street ROW. —I.- 5 Location is the northern teminus of the Hammond St cul-de-sac. (Lat.32°57'14.84" Long.97°00'30.01") ¢ , 'j} t f. �' , Oncor will bury power line in City ROW `:::!:f.' Ilt. I Groun. ; � ,w. �' City Property 3 . ..,... ,_ „ .... f ., � 4 NE6 Relocation Site ; ` in City of Coppell _ m �2013 Goagte � t '�.�;� ;;Ill Ii- street ROW. '� `� 32'5?'i4.89'N 9r`G�4'29 82"W ` Eye alt 608 ft - " 1 3 f l \ , . fitt , e t - ' - -- ' '' . . . z.. t �. , .,. 0,.. , .,,, 4,........ ...... , 4 .;,... ' .... _ .. . ,..... ,,• . . .. ..,. ..',.=,°'-',",� _ .„ it-,-: - I . . ,.,..; , 12/1/200S 11:34am "W its r> G +:�_ �, � t hg f°' k 3 g ` ,t dt /f' ' \ L. s`. 12/1/200511:44,m t` DFW: The Ft Noise rnp tibility Office Operates and �ti� aintains a Noise Monitoring System that Spans about 110 Square Miles Standard Layout for DFW Aircraft Noise Monitor Distribution of DFW Aircr=. .1b' ,.*n' NW4 •NE4 ''..''— — ''—. 'I.'''''''' 4' l'"x'--: • NE7 • NE3 NE8 •NW3 • •NW6 •NW7 NE6 — N1W6 •NW2 tME2 y'NE1 Y s. :r` NW1 E •NW5 r i!til ,_ al .$ „ . ': III +1 SW1 1 I 1,1(1 11 ;r' r ..� •SW5 �! .0 eNE5 • SE1 •SW6 •SE5 *NE9, SE6 wr SET t "'j` •SV47 •SW2 •SE2 • I SE6 ''''-' -.';', v� : I •SW8 •SE3 •x e SE9 SW3 •SEA# . SW4 . LLLL I KR: LUNG I KUU I IUN PHIN I WH NU. 3213309 SHEET 1 C1t" 1 WR NAME COPPELL:RELOCATE UNDERGROUND SERVICE TO DFW NOISE MONITOR DATE 07-12-2013 ----------- Q CUSTOMER DFW AIRPORT NOISE MONITOR SERVE 60 1�,�,/J —-- -- SERVICE CENTERFBR ADDRESS 700 HAMMOND ST ----..--._-_.------- — OFFICE 191 LOCATION NEAR INTERSECTION OF BETHEL ROAD AND MAIN STREET I MAPSCu DESIGNER ALLEN,A1 REY JACK Q e 4- i 0 r 2 PROJECT MANAGER CAMPBELL,CHRISTOPHER PAUL USER ID , PHONE NUMBER 072)323-8983 PHONE (972)323-8981 A.20', Orrcor Electric Delivery Maps.drawings,and electronic data(pi edited ere created for the internal purposes of Incur Electric Delivery with no implication of suitability or fitness for the intended use of the recipient.Cncor Electric Delivery will make good faith efforts to provide predicts that are free from er ,ur,but does not warrant the accuracy or quality of such products.The looations shown are door.:metiers and are not intended to show exact locations.Products provided to other parties by Decor Electric Delivery are for the internal use of the recipient,and the ecipient agrees not to duplicate or distribute the products or any partxon of the products to third parties without the prior written permission of boor Electric Delivery.The recipient further agrees to hold harmless and If Incur Electric Delivery against all claims,costs,expenses and damages resulting from or predicated upon strict liability for personal injurres,death or property damage,on account of any defects in the property provided hereunder. ,yoiaxes.c : 1 d N o ., s iris e t-%`i"„', eHF1 RD ,,,....../..„-„, ,, ,,,. ,,..,----r-v-'',"'"e'\."'N,r"kad..,e—,e',...'",,,r',"'''Ne''..",,,,,,,, r, ccxr ° r 1 )t At X1, (-'x t o ;x$' '' S-1-,.‘ b o as °" ( li " 1.s ', ' ` t IC:CONTACT 002 8 9 9 \ f a«a�ttf ...s QJf 4 } . S1625T -3661301 - -.__ 1 1 1 -- -- 3 � � t,o • -r„ -- - \ . T : B 50 .. ,,, ---- .., 3916547 '11- ,,,,,c,„ „,, ; -�--„ - , 0,, , , ,,,, -3661219 t c0r a i1 bares ,, e0r- Co.,1rye -0 : .O ci I '° f7 I , ` . ", 0 b 4 f t°t +r v° > o r w,.,,` e� n � , CO A O O . . 10' . 111. U O 1.5' q ; q 1 5„ 1.06'1 DIAM HOLE •• -• . TOP VIEW ( NOT SCALE) r GALV.ANCHOR BOLTS 36"LENGTH WITH H 2 HOOK (A60) TOP NUTS (A325)WITH LOCK WASHERS • 20.00' IIN 1 Lit LEVELING NUTS(A325) lit till WITH LOCK WASHERS — -- �!,• ;._.....•.•:" :•:•:•: : :•:.:.... . :•:.:.:....•.•... . .®, BASE PLATE ( NOT SCALE) • AIRPORT NOISE MONITORING SYSTEM l Q INSTALLATION DETAILS t FOUNDATION/ MOUNTING tanum MGA - Bi *2 , , IMO>R RLG_ ,1���'/ DIM R RL �� e . FOUNDATION =ztt H —. " T 1PT!»H R RVSL.. - ./ l •DALLAS/FORT WORTH VN� ?il���'rif�9fII`atratl'11�1�I4�tw Illltll(lli iCiillilkilu:hi 1,4 ! INTERNATIONAL AIRPORT i NIL fargT•RE GREVE ASSOC/ATM POWER 3/4' RIGID CONDU1I TELEPHONE 3/4"RIGID CONDUIT 4-1"GALV.ANCHOR BOLTS 36"LENGTH WRH 2 HOOK ; STUB UP 1.80 2" ROUNDED RISE_ • FOR DRAINAGE I0.5 5-#5 REBAR 200' CONCRETE MIX t 4000 PSI-7 DAY 4 8-#3 BANDS •:• 3"MIN COVERAGE 111111 2.00' - 2 3/4■SCHED 40 PVC CONDUITS -- TELEPHONE/POWER 8'00 ' - :•;r 24'DIAMETER HOLE 8' DEEP (USE AUGER OR HAND DIG) -` : ' (USE 3 FT 24"DIAM SONOTU T BE TO FORM) SCALE 1P2 INCH- 1 FT ;a THE ................ .......................;> FLOOD AVCON ::............ .4•-- 2.00 --► GROUP AVIATION CONSULTANT UNDISTURBED FOUNDATION HISDOCLfiENT TAINSC' a�'T'AL MAT�AL � V TO ME•STRE GREVE ASSOCIATES.INC.Ater UNATHOURZED USE OSSCL,Q9u DISSEMINATION ARESULT DUPLICATION► MY N UAau THE CA WS.