Westhaven Addition Ph 1DEVELOPMENT FEES
PROJECT NAME: Westhaven Addition, Phase 1
ENGINEER:Kimley-Horn
ORIGINATION DATE:5/25/2012
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$138,294.00
Wastewater Impact Fee$128,700.00
Park Fee$183,755.00$183,755.00ra4/11/2013
Roadway Impact-Zone$90,948.00$90,948.00ra4/11/2013
Street Sign
Street Light
4%Construction Inspection$101,981.79$101,981.79ra4/11/2013
EG or Bore Permit$6,558.75$6,558.75lh12/27/2012
8/26/2013Overtime Inspection$216.00$216.008/30/2013
Water Tap Inspection$7,250.00
Wastewater Tap Inspection$7,150.00
Water Meter (Domestic)$25,525.00
Water Meter (Fire/Irrig)$1,764.00
Meter Deposit (Domestic)$4,290.00
Meter Deposit (Fire/Irrig)$60.00
Utility Final Inspection$7,150.00
Subtotal to Eng.$383,459.54$383,459.54$0.00
Total FeesFees PaidAmount Owed
TOTALS
$703,642.54$383,459.54$320,183.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Tree Removal Permit$225,000.00
12/17/2012Erosion Control Maint.
Flood Study Review$3,500.00
5/25/2012
T H E • C I T Y • 0 F
COPPELL
o
X A s 1
August 26, 2013
Lela Hubbard
Gilco Contracting
6331 Southwest Blvd.
Benbrook TX 76132-1063
RE: Westhaven Addition, Phase 1
Overtime Inspection
Dear Ms. Hubbard:
In accordance with your request, the City of Coppell Engineering Department provided inspection
service at the referenced location on Saturday, August 24, 2013. The overtime rate including salary
and benefits is $54.00 per hour. Four hours(4 hrs.)were charged to your company on that date.
Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell
to the following address:
City of Coppell Finance Dept.
255 Parkway Blvd
P.O. Box 9478
Coppell, TX 75019
If you should have any questions,please call (972) 304-3679.
Sincerely,
Iffy Dai s
Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
cc: Finance Dept.
Project Fee File
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
• Aug 20 2013 16: 29 HP LASERJET FAX p. 1
•
• Post-its Fax Note 7671 Date$)Zvi 151 aes p�,
■■ l {4vb100.�,
To 1 „`� �V1� From �lG
r r Phone# dc,CO nen i co. citicn ez it r Tu �p=J
91'.-3 aD44 - 3c.a4
Fax# C V)pr.BO t+.5%10 Fax#
August 20,2013
City of Coppell
Attn:Mr.Larry Davis
255 Parkway Blvd.
Coppell,Texas 75019-9478
Re: Westhaven Phase 1
Dear Mr. Davis,
Gilco Contracting, Inc.would like to notify you of our plans to work Saturday,August 24, 2013.We
expect to have crews'onsite working on the cement subgrade stabilization,tying steel, and possibly
pouring concrete, if the site is ready. If you have any questions regarding this request please contact our
project manager,Johnathan Turner,at(817)929-0527.Thank you for your time.
Sincerely,
\riso
Lela Hubbard
Operations Director
(817)735-1600 ext 302
6331 Southwest BM
Benbrook,Texas 7613
Office: 817.735.160
Fax: 817.735.161