Loading...
Westhaven Addition Ph 1DEVELOPMENT FEES PROJECT NAME: Westhaven Addition, Phase 1 ENGINEER:Kimley-Horn ORIGINATION DATE:5/25/2012 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$138,294.00 Wastewater Impact Fee$128,700.00 Park Fee$183,755.00$183,755.00ra4/11/2013 Roadway Impact-Zone$90,948.00$90,948.00ra4/11/2013 Street Sign Street Light 4%Construction Inspection$101,981.79$101,981.79ra4/11/2013 EG or Bore Permit$6,558.75$6,558.75lh12/27/2012 8/26/2013Overtime Inspection$216.00$216.008/30/2013 Water Tap Inspection$7,250.00 Wastewater Tap Inspection$7,150.00 Water Meter (Domestic)$25,525.00 Water Meter (Fire/Irrig)$1,764.00 Meter Deposit (Domestic)$4,290.00 Meter Deposit (Fire/Irrig)$60.00 Utility Final Inspection$7,150.00 Subtotal to Eng.$383,459.54$383,459.54$0.00 Total FeesFees PaidAmount Owed TOTALS $703,642.54$383,459.54$320,183.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Tree Removal Permit$225,000.00 12/17/2012Erosion Control Maint. Flood Study Review$3,500.00 5/25/2012 T H E • C I T Y • 0 F COPPELL o X A s 1 August 26, 2013 Lela Hubbard Gilco Contracting 6331 Southwest Blvd. Benbrook TX 76132-1063 RE: Westhaven Addition, Phase 1 Overtime Inspection Dear Ms. Hubbard: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, August 24, 2013. The overtime rate including salary and benefits is $54.00 per hour. Four hours(4 hrs.)were charged to your company on that date. Please send a copy of this letter along with your check for $216.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call (972) 304-3679. Sincerely, Iffy Dai s Construction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 • Aug 20 2013 16: 29 HP LASERJET FAX p. 1 • • Post-its Fax Note 7671 Date$)Zvi 151 aes p�, ■■ l {4vb100.�, To 1 „`� �V1� From �lG r r Phone# dc,CO nen i co. citicn ez it r Tu �p=J 91'.-3 aD44 - 3c.a4 Fax# C V)pr.BO t+.5%10 Fax# August 20,2013 City of Coppell Attn:Mr.Larry Davis 255 Parkway Blvd. Coppell,Texas 75019-9478 Re: Westhaven Phase 1 Dear Mr. Davis, Gilco Contracting, Inc.would like to notify you of our plans to work Saturday,August 24, 2013.We expect to have crews'onsite working on the cement subgrade stabilization,tying steel, and possibly pouring concrete, if the site is ready. If you have any questions regarding this request please contact our project manager,Johnathan Turner,at(817)929-0527.Thank you for your time. Sincerely, \riso Lela Hubbard Operations Director (817)735-1600 ext 302 6331 Southwest BM Benbrook,Texas 7613 Office: 817.735.160 Fax: 817.735.161 76(3Z- " C13