Loading...
NL Cypress-PT130823 T H E • C. C T Y • o F COI'FELL 4A6* . i CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant: 7/1f)Inado joys 1>'• Date Submitted: Address of Applicant: f ft)I C a e lst 6ou(Q up r„,i , S v f o l Phone Number: 177,-- (. —2,g0ej FAX NUMBER: Q12- 6 — a el? Location of Construction (address, if available): Cy resS L)ottf vS td r2. &ode-H "�. bj ivy t?' . T.� . I . 4 Subdivision Section # Block# Lot# OR So v1 L. W N NNW SU,r/el A Stra.vf 1Jts. /62- I Survey/Abstract# Acreage Location description (attach vicinity map): 1 1. Type of proposed construction or development: ( ) Residential ( ) Alteration of a natural waterway drainage course ( ) Non-residential (Other (describe & attach drawing or sketch) ( ) Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: (4Paving ( ) Median or Landscaping ( ) Box Culvert ( ) Sidewalk ( ) Water Main ( ) Rip Rap ( ) Drive Approach ( ) R.C.P. ( ) Fill Area ( ) Excavation ( ) Sanitary Sewer Main ( ) Drainage Channel Excavation ( ) Fire Lane ( ) Flume ( ) Slope Protection/Retaining Wall ( ) Bridge ( ) Inlet ( ) Parking Lot Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control& Sedimentation Ordinance. 4. Applicant shall provide a copy of approved plans, specifications and related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ 2r 2. Date Paid: g// // 3 NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. • Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3500 Engineering Dept. @ 972-304-3679 ➢ Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢ It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. until 4:00 p.m. ONLY unless otherwise approved by City Engineer. ➢ A pre-construction meeting is required prior to beginning work related to this permit. •nt. the inspector assigned to your project to schedule the meeting. „ A '! /tforAS P, 2(4. 6"79 • I 4 -19 Signature o pplic.nt Printed Name Contact Number 1W3 T 14, a a 97z-36 4 -361,r 4-/- 9-5 76, —/'5y City Inspector Contact Number(s) FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? ( ) YES (erNO If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? ( ) YES ( NO Are other federal, state, or local permits required? ( ) YES (V)NO ( PERMIT APPLI � OVED () PERMIT APPLICATION DENIED City Approval Date On ' L,1e 'K w.{!'�.,ti Cc/ ec (Qf'v✓a Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. M O bA N gli C.) (1) Q II t mss" il o N a.) o X OQ � on o O O ,- -fly 0 . w0 W +i sTI c9", w0 w W o '�, o w E. z W v v d0 CA z En* c..) A H S a 4• a> 'd , O y3 O y v r� 1 GO Cb �r % U — � � M E""4 QW A CI)o :0 o �, Q ¢ 0 © v) I E. U Q 4 W 0 Pi o ce o o N U H to a) . a. N\ a) s. � U P ^ � 4 ' ot wH Uz ! �" M •° ° +3 ~ O � � � � a r • .fix ° A a ti) U •� 'e = d �'.' y ,W, W . 4 & a) O o W W a H 0AO Cl)o a O A a� 0 (s1 F" W w W /2,_,.•V Oi C V � z-� a W I. QI W -, P� hti U Pi C/) Cl) Q Q 0 c C. Tom Jones From: Kyle Nix<kyle @pritchardassociates.com> Sent: Wednesday, August 21, 2013 8:34 AM To: Tom Jones Cc: Tom Holland Subject: Re: Cypress Waters Spec Building/Dividend Drive Connection Tom, Below is the breakdown of the construction of the Coppell Public Work. If we need additional detail, please let me know. Thanks. Coppell Public Work • Concrete—fine grading, rebar and concrete paving and curb/gutter per C4- $2,932.00 • Earthwork—demo existing concrete paving, curb and gutter, lime stabilize and blue top-$1,620.00 • Traffic markings/buttons-$750 Kyle F. Nix AIA PRITCHARD ASSOCIATES, INC. 2500 Routh Street l Dallas,Texas 75201 214/849-0011 (main) 214/849-0046(direct) 817/739-6925(cell) www.pritchardassociates.com From:Tom Jones<TJones@bbcpi.com> Date:Tuesday,August 13, 2013 5:32 PM To: Kyle Nix<kyle@pritchardassociates.com> Cc:Tom Holland<thollandi Billingsleyco.com> Subject: RE:Cypress Waters Spec Building/Dividend Drive Connection Kyle--We need the Permit Application and construction estimate/4% inspection fee calculation. Thanks,Tom Thomas P.Jones, P.E. I Vice President I Binkley & Barfield—C&P, Inc. I 972.644.2800 T I 214.679.1679 C From: Kyle Nix [mailto:kyle@oritchardassociates.com] Sent: Tuesday, August 13, 2013 5:26 PM To:Tom Jones Cc: Tom Holland Subject: Re: Cypress Waters Spec Building/ Dividend Drive Connection Yes, we can discuss in the meeting tomorrow morning, or let me know what exactly they need and I'll start working on getting it for you. Thanks, 1