ST9902-LR130826ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone:972- 444 -8889 Fax: 972 - 444 -8893
DRILLED PIER INSPECTION REPORT
CLIENT: City of Coppell
PROJECT: West Sandy Lake Road Improvements
AGG REPORT #: C1 3-0634-150217
REPORT DATE: 08/26/2013
DISTRIBUTION:
INSPECTOR /DATE: D. Roberts 8/21/2013
DRILLING COMPANY: Texas Shafts
BUILDING:
Page 1 of 1
REMARKS: Less than 6 inches of water present in pier at time of concrete placement.
4E was started 8/20/13 and completed 8/21/2013.
ALLIANCE GEOTECHNICAL GROUP XZV
* An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL
VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.
Pier Location (grid lines)
4F
4G
Design Shaft Diameter
36 inches
36 inches
Design Penetration
5 feet
5 feet
Elevation of Top of Pier
479.84 feet
479.61 feet
Ground Elevation
481.69 feet
481.53 feet
Actual Shaft Diameter
36 inches
36 inches
Depth to Bearing Stratum
(Very Hard Gray Sandy Shale)*
39.5 feet
38.5 feet
Required Pier Depth
44.5 feet
43.5 feet
Actual Pier Depth
47.8 feet
48.3 feet
Actual Pier Penetration
8.3 feet
9.8 feet
Elevation of Top of Bearing Stratum
442.19 feet
443.03 feet
Elevation of Bottom of Pier
433.89 feet
433.23 feet
Pier Location within Tolerance
yes
yes
Pier Plumb within Specifications
yes
yes
Casing Required
yes
yes
Length of Casing
32.4 feet
32.4 feet
Depth to Top of Casing
1.0 feet
-1.5 feet
Depth to Bottom of Casing
33.4 feet
30.9 feet
Depth Required Due to Casing
N/A
N/A
Water Present in Hole at Concrete Pour
trace
trace
Pier Bottom Clean
yes
yes
Vertical Bars (number & Size)
10 #9
10 #9
Horizontal Ties (Size & Spacing)
#3 @6"
#3 @6"
Steel Cage Diameter
30 inches
30 inches
Length of Steel Cage
47.3 feet
47.7 feet
Concrete Placed in Center of Pier Hole with
a Hopper or Inverted Chute
Inverted Chute
Inverted Chute
REMARKS: Less than 6 inches of water present in pier at time of concrete placement.
4E was started 8/20/13 and completed 8/21/2013.
ALLIANCE GEOTECHNICAL GROUP XZV
* An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL
VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.
ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone:972- 444 -8889 Fax: 972 - 444 -8893
DRILLED PIER INSPECTION REPORT
CLIENT: City of Coppell
PROJECT: West Sandy Lake Road Improvements
AGG REPORT #: C1 3-0634-150219
REPORT DATE: 08/26/2013
DISTRIBUTION:
INSPECTOR/DATE: D. Roberts 8/22/2013
DRILLING COMPANY: Texas Shafts
BUILDING:
Paae 1 of 1
REMARKS: Less than 6 inches of water present in pier at time of concrete placement.
ALLIANCE GEOTECHNICAL GROUP,P1L� --
* An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL
VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.
Pier Location (grid lines)
1F
1G
Design Shaft Diameter
36 inches
36 inches
Design Penetration
5 feet
5 feet
Elevation of Top of Pier
480.32 feet
480.13 feet
Ground Elevation
481.61 feet
480.95 feet
Actual Shaft Diameter
36 inches
36 inches
Depth to Bearing Stratum
(Very Hard Gray Sandy Shale)*
38.7 feet
37.0 feet
Required Pier Depth
43.70 feet
42.0 feet
Actual Pier Depth
47.65 feet
47.8 feet
Actual Pier Penetration
8.95 feet
10.8 feet
Elevation of Top of Bearing Stratum
442.91 feet
443.95 feet
Elevation of Bottom of Pier
433.96 feet
433.15 feet
Pier Location within Tolerance
yes
yes
Pier Plumb within Specifications
yes
yes
Casing Required
yes
yes
Length of Casing
31.4 feet
31.4 feet
Depth to Top of Casing
1.4 feet
-0.3 feet
Depth to Bottom of Casing
32.8 feet
31.1 feet
Depth Required Due to Casing
N/A
N/A
Water Present in Hole at Concrete Pour
trace
trace
Pier Bottom Clean
yes
yes
Vertical Bars (number & Size)
10 #9
1 10 #9
Horizontal Ties (Size & Spacing)
#3 @6" #3 @6"
Steel Cage Diameter
30 inches
30 inches
Length of Steel Cage
47.9 feet
47.2 feet
Concrete Placed in Center of Pier Hole with
a Hopper or Inverted Chute
Inverted Chute
Inverted Chute
REMARKS: Less than 6 inches of water present in pier at time of concrete placement.
ALLIANCE GEOTECHNICAL GROUP,P1L� --
* An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL
VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.
ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone:972- 444 -8889 Fax: 972 - 444 -8893
DRILLED PIER INSPECTION REPORT
CLIENT: City of Coppell
PROJECT: West Sandy Lake Road Improvements
AGG REPORT #: C13- 0634 - 150221
REPORT DATE: 08/26/2013
DISTRIBUTION:
INSPECTOR /DATE: D. Roberts 8/23/2013
DRILLING COMPANY: Texas Shafts
BUILDING:
Paqe 1 of 1
REMARKS: Less than 6 inches of water present in pier at time of concrete placement.
ALLIANCE GEOTECHNICAL GROUP a"--
* An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL
VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.
Pier Location (grid lines)
1H
Design Shaft Diameter
36 inches
Design Penetration
5 feet
Elevation of Top of Pier
479.94 feet
Ground Elevation
480.97 feet
Actual Shaft Diameter
36 inches
Depth to Bearing Stratum
(Very Hard Gray Sandy Shale)*
41.0 feet
Required Pier Depth
46.00 feet
Actual Pier Depth
48.85 feet
Actual Pier Penetration
7.85 feet
Elevation of Top of Bearing Stratum
439.97 feet
Elevation of Bottom of Pier
432.31 feet
Pier Location within Tolerance
yes
Pier Plumb within Specifications
yes
Casing Required
yes
Length of Casing
31.4 feet
Depth to Top of Casing
0.0 feet
Depth to Bottom of Casing
31.4 feet
Depth Required Due to Casing
N/A
Water Present in Hole at Concrete Pour
trace
Pier Bottom Clean
yes
Vertical Bars (number & Size)
10 #9
Horizontal Ties (Size & Spacing)
#3 @6"
Steel Cage Diameter
30 inches
Length of Steel Cage
47.5 feet
Concrete Placed in Center of Pier Hole with
a Hopper or Inverted Chute
Inverted Chute
REMARKS: Less than 6 inches of water present in pier at time of concrete placement.
ALLIANCE GEOTECHNICAL GROUP a"--
* An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL
VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.