Acct ID: 1770
Report Date: 08/28/2013
Project: West Sandy Lake Road
Location: Observation
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
File No: C13 -0634 Date Sampled: 08/20/2013
Sampled By: Duce Roberts
By Order Of:
Order Number: 1770
Client: City of Coppell
REPORT. Daily Field Activity LAB NO: 150215
TEST RESULTS Report No: 150215
Page 1 of 1
As requested, a representative of Alliance Geotechnical Group, was present at the project site at 7:00 am for
observation of pier drilling operations. At approximately 8:00 am, technician was asked to come back at 12:00 pm as
they would not be starting until then.
Technician returned at 12:00 pm. Drilling on Abutment 4, Pier 4G began at approximately 1:00 pm. The pier was not
completed this day. Pier was drilled to a depth of approximately 33'. At this time, casing was put in pier and penetration
and completion would resume on 8- 21 -13.
Prior to technician leaving site, casing had been set in Pier 4G.
Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy)
Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
Respectfully Submitted,
Alliance Geotechnical Group
Perry C. Kakara, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.