Loading...
ST9902-LR130828 (2)flLLin'iC GGEOTECHh1lC19L GROUP Acct ID: 1770 Report Date: 08/28/2013 Project: West Sandy Lake Road Location: Observation Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 File No: C13 -0634 Date Sampled: 08/20/2013 Sampled By: Duce Roberts By Order Of: Order Number: 1770 Client: City of Coppell REPORT. Daily Field Activity LAB NO: 150215 TEST RESULTS Report No: 150215 Page 1 of 1 As requested, a representative of Alliance Geotechnical Group, was present at the project site at 7:00 am for observation of pier drilling operations. At approximately 8:00 am, technician was asked to come back at 12:00 pm as they would not be starting until then. Technician returned at 12:00 pm. Drilling on Abutment 4, Pier 4G began at approximately 1:00 pm. The pier was not completed this day. Pier was drilled to a depth of approximately 33'. At this time, casing was put in pier and penetration and completion would resume on 8- 21 -13. Prior to technician leaving site, casing had been set in Pier 4G. Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.