Gateway BP(2.5)-CS130829 T H E C 1 T Y O F
COPPELL
,tt * ,� - 4-
X A s - s
August 29, 2013
Rob Van Dame
Duke Realty
RE: Gateway Business Park, Phase 2,Lot 1 Block B (Naterra BMSC)
Dear Mr. Van Dame:
A pre-construction conference on the referenced project has been scheduled for Tuesday,
September 10, 2013 at 9:00 a.m. in the Engineering conference room at 265 Parkway
Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincerely,
•/ // _.
Larry D- ■is, Construction Inspector
Office Phone: 972-304-3684
Fax: 972-304-3570
cc: Michael Garza, P.E., Civil Engineer
Glenn Hollowell, P.E., Public Works Manager
Michael Arellano, Chief Building Official
Tim Oates, Deputy Chief/Prevention
Clayton Strolle, P.E., Pacheco Koch
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/ owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative