Loading...
Gateway BP(2.5)-CS130829 T H E C 1 T Y O F COPPELL ,tt * ,� - 4- X A s - s August 29, 2013 Rob Van Dame Duke Realty RE: Gateway Business Park, Phase 2,Lot 1 Block B (Naterra BMSC) Dear Mr. Van Dame: A pre-construction conference on the referenced project has been scheduled for Tuesday, September 10, 2013 at 9:00 a.m. in the Engineering conference room at 265 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Sincerely, •/ // _. Larry D- ■is, Construction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Michael Garza, P.E., Civil Engineer Glenn Hollowell, P.E., Public Works Manager Michael Arellano, Chief Building Official Tim Oates, Deputy Chief/Prevention Clayton Strolle, P.E., Pacheco Koch 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/ owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative