ST9902-LR130828 (3)ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone :972- 444 -8889 Fax: 972 - 444 -8893 DRILLED PIER INSPECTION REPORT CLIENT: City of Coppell PROJECT: West Sandy Lake Road Improvements AGG REPORT #: C13- 0634 - 150690 -1 REPORT DATE: 08128/2013 DISTRIBUTION: INSPECTOR/DATE: D. Roberts 8/26/2013 DRILLING COMPANY: Texas Shafts BUILDING: Paae 1 of 1 REMARKS: *Less than 1 inch of water present in pier at time of concrete placement. ALLIANCE GEOTECHNICAL GROUP * An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL VERY HARD GRAY SANDY SHALE IS ENCOUNTERED. Pier Location (grid lines) 1J Design Shaft Diameter Winches Design Penetration 5 feet Elevation of Top of Pier 479.75 feet Ground Elevation 481.03 feet Actual Shaft Diameter Winches Depth to Bearing Stratum (Very Hard Gray Sandy Shale)* 38.7 feet Required Pier Depth 43.70 feet Actual Pier Depth 47.97 feet Actual Pier Penetration 9.27 feet Elevation of Top of Bearing Stratum 442.33 feet Elevation of Bottom of Pier 433.06 feet Pier Location within Tolerance yes Pier Plumb within Specifications yes Casing Required yes Length of Casing 32.4 feet Depth to Top of Casing 0.0 feet Depth to Bottom of Casing 32.4 feet Depth Required Due to Casing N/A Water Present in Hole at Concrete Pour Pier Bottom Clean yes Vertical Bars (number & Size) 10 #9 Horizontal Ties (Size & Spacing) #3 @6" Steel Cage Diameter 30 inches Length of Steel Cage 47.6 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute Inverted Chute REMARKS: *Less than 1 inch of water present in pier at time of concrete placement. ALLIANCE GEOTECHNICAL GROUP * An approximate 5' thick hard gray shale layer exists above the very hard gray sandy shale. DO NOT START PENETRATION UNTIL VERY HARD GRAY SANDY SHALE IS ENCOUNTERED.