Loading...
Coppell Ind 2-LR130827 CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 540 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 07-30-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: D. Rico PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Turn lane curb: 150’S, 90’E from SW building corner 10/40 Design Information Source of Concrete Mix Identification Specified Strength (psi) Redi Mix 10L11502 3600 Test Results SetCylinder Age @ Total Load Compressive Average Strength No.IDDate Tested Test(lbs.)Strength (psi) (psi) 1 8160 08-06-13 7 48740 3880 8160 08-27-13 28 65630 5220 8160 08-27-13 28 59140 4710 8160 08-27-13 28 59290 4720 4880 8160 Hold H Cylinder Data AirConcreteAirUnit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No.ID(inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 8160 5.0 9:45 AM 84 87 5.5 146.0 25698589 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 539 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 07-30-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: D. Rico PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Sidewalk: 990’S, 240’E from NE building corner 20/100 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter 7752 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No.IDDate Tested Test(lbs.)Strength (psi) (psi) 1 8159 08-06-13 7 55740 4430 8159 08-27-13 28 63060 5020 8159 08-27-13 28 69800 5560 8159 08-27-13 28 66980 5330 5300 8159 Hold H Cylinder Data AirConcreteAirUnit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No.ID(inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 8159 5.0 7:45 AM 78 87 4.5 145.2 639 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX